CSLB C20 TRADE TOUGHER ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS COMPLETE TEST PAPER

Content preview

CSLB C20 TRADE TOUGHER ACTUAL EXAM
QUESTIONS AND CORRECT ANSWERS
COMPLETE TEST PAPER

●● Unloaded materials can only stay in the street
Answer: 5 days


●● What type of equipment is best used for mud
Answer: track dozer or loader


●● What is the color of wire going into the ground
Answer: green


●● What is it called when rocks in an aggregate base have come to the
top with no fines to bind them
Answer: Bony grade


●● A flagger should stand within ..... of work area with what size flag
Answer: 100ft and 18 inch flag


●● Where do you set a string line before paving with asphalt
Answer: 6 inches offset from centerline of roadway

,●● Where toeboard's are required in a construction site what are the
minimum dimensions
Answer: 4 inches high off the platform with no more than 1/4 inch gap


●● If you were driving nails and find that they have a tendency to split
the boards what alternative type of nail might use to prevent the splitting
Answer: Either sinker or box nail


●● Which of the following methods of removing old asphalt pavement
is not correct
Answer: Rip the asphalt before removing with a paddle wheel scraper


●● when working with transit you take the height of the instrument and
Answer: Subtract


●● After placing a steel pipe pile what do you fill it with
Answer: Concrete


●● What kind of pipe needs a tracer
Answer: Plastic gas pipe

, ●● When you are paving asphalt road and one pass hell should you
proceed
Answer: Start rolling on low side and progress towards high side


●● What should be done to prevent concrete from sticking to steal forms
Answer: Use form oil


●● When finish grading what is the allowable
Answer: .08'


●● What do you line an old underground storage tank with
Answer: Special coating or bladder


●● On what type of surface should you not use latex paint
Answer: Smooth gypsum board


●● A steep near vertical slope along the margin of a landslide
Answer: Scarp


●● What is the minimum tolerance that must be maintained for a
concrete slab to be considered very
Answer: 1/8"

Document information

Uploaded on
September 29, 2026
Number of pages
23
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GradeGalaxy
4.3
(18)
Sold
209
Followers
6
Items
63638
Last sold
21 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions