• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 22 pages
Exam (elaborations)

ICC PRESTRESSED CONCRETE - CODES AND PLANS CERTIFICATION PREPARATION Latest Actual Exam with Verified Questions & Correct Answers

Document preview thumbnail
Preview 3 out of 22 pages

ICC PRESTRESSED CONCRETE - CODES AND PLANS CERTIFICATION PREPARATION Latest Actual Exam with Verified Questions & Correct Answers

Content preview

ICC PRESTRESSED CONCRETE - CODES AND PLANS CERTIFICATION
PREPARATION Latest Actual Exam with Verified Questions &
Correct Answers

Question 1.
Module 1. Prestressed concrete is:

Correct Answer: - The tensioning of steel-stranded cables prior to concrete
placement - The tensioning of steel-stranded cables after concrete has been
placed and hardened - Concrete that has received a tensile load prior to any
service loads


Question 2.
Module 1. The use of a prestressed concrete system will achieve the following:

Correct Answer: - Reduced thickness of concrete, less conventional reinforcing
steel and adequate crack control


Question 3.
Module 1. Once tensioned, the tensioning cables are held securely in a tensioned state by:

Correct Answer: Wedges that have been seated


Question 4.
Module 1. The end of a cable that terminates within a concrete slab, thus rendering it in
accessible from outside the concrete is known as:

Correct Answer: The dead end


Question 5.
Module 1. The presence of sheathing on a wire-stranded cable indicates that:

Correct Answer: It will be used in an unbonded system application


Question 6.
Module 1. The most common post-tension cable tendons in use today are made up of:

Correct Answer: 7 steel strands of wire wrapped together


Question 7.
Module 1. In an unbonded system, the force applied to the concrete after tensioning:

Correct Answer: Comes from the anchorage zone only

,Question 8.
Module 2. Post-tension manufacturing plants must be certified by:

Correct Answer: PTI Unbonded Plant Certification Program


Question 9.
Module 2. Prior to cutting the tendon tails after tensioning, the field records of stressing
activities must be forwarded to and approved by:

Correct Answer: The engineer of record


Question 10.
Module 2. In the event that a new set of stressing equipment is delivered to the project,
this equipment should contain __________ for review prior being used on-site:

Correct Answer: A current calibration chart relating gauge pressure to force
applied


Question 11.
Module 2. According to the Field
Procedures Manual for Unbond-
ed Single Strand Tendons, all of
the following items are neces-
sary for post-tension document
control except:
A) Concrete Strength Results
B) Shipping Lists
C) Material Certifications
D) Approved Installation Draw-
ings

Correct Answer: A) Concrete Strength Results


Question 12.
Module 2. When reporting
stressing results, the follow-
ing information is necessary to
record:
A) Jack and gauge serial number
B) Elongation measurements
and percentage deviation
C) Both A and B
D) Gauge Manufacturer
E) All three, A, B, and D

Correct Answer: C) Both A and B

, Question 13.
Module 2. When moving
post-tension cables across the
site, the use of _______ is permit-
ted.
A) Nylon slings, with unloading
as close as placement as possi-
ble
B) Smooth finished chains with
limited use
C) Epoxy coated high strength
wire with limited use
D) A large front loader exercising
caution

Correct Answer: Nylon slings, with unloading as close to the placement as
possible


Question 14.
Module 2. When storing post-tension cables, care must be taken to:

Correct Answer: Prevent the cables from being exposed to weather elements
and moisture


Question 15.
Module 2. During deliver, it is the ______________ responsibility to ensure the delivered
items match the shipping list.

Correct Answer: Buyer's


Question 16.
Module 2. According to the Field Procedures Manual for Unbonded Single Strand Tendons,
the follow documents must be kept on site:

Correct Answer: 1) Approved Installation Drawings 2) Shipping Lists 3) Material
Certifications 4) Jack Calibrations 5) Stressing Records


Question 17.
Module 2. Install drawings show: Plan views, elevation views, and details so the
subcontrac-

Correct Answer: tor and inspector can clearly see the tendon layout. This
includes tendon profiles, also known as drape.


Question 18.
Module 2. Drape

Document information

Uploaded on
September 29, 2026
Number of pages
22
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
4.0
(27)
Sold
279
Followers
4
Items
74098
Last sold
11 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions