Question 1
Question: 01. The power of a test for the difference between means is measured by
a) α
b) 1 − α
c) β
d) 1 − β
CORRECT ANSWER
Answer:
d) 1 − β
Question 2
Question: 02. A process capability analysis is NOT used to
a) determine the ability of a process to meet specifications
b) maintain a process in a state of statistical control
c) establish new specifications
d) prioritize competing processes
CORRECT ANSWER
Answer:
1
, b) maintain a process in a state of statistical control
Question 3
Question: 03. Which of the following affects system availability?
a) FMECA
b) Maintainability
c) Producibility
d) LTPD
CORRECT ANSWER
Answer:
b) Maintainability
Question 4
Question: 04. A quality plan should define and document which of the following?
a) How the process flow will add value to the manufacturing steps
b) The indices for determining quality costs
c) The approval status and selection criteria for suppliers and subcontractors
d) How the requirements for quality will be met
CORRECT ANSWER
Answer:
d) How the requirements for quality will be met
2
VERIFIED ANSWERS|BRAND NEW 2026-2027
UPDATE|GRADED A+
Question 1
Question: 01. The power of a test for the difference between means is measured by
a) α
b) 1 − α
c) β
d) 1 − β
CORRECT ANSWER
Answer:
d) 1 − β
Question 2
Question: 02. A process capability analysis is NOT used to
a) determine the ability of a process to meet specifications
b) maintain a process in a state of statistical control
c) establish new specifications
d) prioritize competing processes
CORRECT ANSWER
Answer:
1
, b) maintain a process in a state of statistical control
Question 3
Question: 03. Which of the following affects system availability?
a) FMECA
b) Maintainability
c) Producibility
d) LTPD
CORRECT ANSWER
Answer:
b) Maintainability
Question 4
Question: 04. A quality plan should define and document which of the following?
a) How the process flow will add value to the manufacturing steps
b) The indices for determining quality costs
c) The approval status and selection criteria for suppliers and subcontractors
d) How the requirements for quality will be met
CORRECT ANSWER
Answer:
d) How the requirements for quality will be met