Air Assault Phase 1 Written Test Exam Questions and Answers 100% Correct Graded A+
2026/27
What model aircraft does Piedmont fly - EMB 145-LR
What engine does Piedmont use - AE3007A1........(A1)
The QRH addresses what I believe to be three sections - Emergencies, abnormals, And
normal
For fire or smoke that cannot be positively located and extinguish, what is required? -
Immediate dissent landing and passenger evacuation
In the QRH, checklists are arranged In alphabetical order with emergency checklist first,
followed by - Abnormal checklist
In the QRH handbook no task is complete until you see what - END
The quick reference handbook is a tool provided to minimize hasty and improper action, It is
structured as a blank and blank - Read and do
The QRH does allow - Immediate correcting of the obvious prior to any specific reference
to the manual
, Do not use a symmetrical thrust on what type of runway? - Slippery
With regards to the start stop selectors and engine fire handles they shall be confirmed by the
pilot flying before the - PM activates them
The pilot monitoring Michelle read all items allowed, true or false - True
Check with sequence memory items first followed by blank blank - QRH, appropriate
normal checklist for the phase of flight
Which pilot cancels the master warning light? - The pilot monitoring
Which pilot will call for the accomplishment of any memory items and appropriate checklist? -
Pilot flying
The pilot monitoring will reference in the queue Rh blank or blank - Non-annunciated or
message index tab
At the end of the checklist the pilot monitoring Will announce - Title of checklist
complete
If an emergency involves smoke fire or fumes, or if any integrity of the aircraft is in doubt or
could be compromised on landing request - CFR Crash fire rescue
2026/27
What model aircraft does Piedmont fly - EMB 145-LR
What engine does Piedmont use - AE3007A1........(A1)
The QRH addresses what I believe to be three sections - Emergencies, abnormals, And
normal
For fire or smoke that cannot be positively located and extinguish, what is required? -
Immediate dissent landing and passenger evacuation
In the QRH, checklists are arranged In alphabetical order with emergency checklist first,
followed by - Abnormal checklist
In the QRH handbook no task is complete until you see what - END
The quick reference handbook is a tool provided to minimize hasty and improper action, It is
structured as a blank and blank - Read and do
The QRH does allow - Immediate correcting of the obvious prior to any specific reference
to the manual
, Do not use a symmetrical thrust on what type of runway? - Slippery
With regards to the start stop selectors and engine fire handles they shall be confirmed by the
pilot flying before the - PM activates them
The pilot monitoring Michelle read all items allowed, true or false - True
Check with sequence memory items first followed by blank blank - QRH, appropriate
normal checklist for the phase of flight
Which pilot cancels the master warning light? - The pilot monitoring
Which pilot will call for the accomplishment of any memory items and appropriate checklist? -
Pilot flying
The pilot monitoring will reference in the queue Rh blank or blank - Non-annunciated or
message index tab
At the end of the checklist the pilot monitoring Will announce - Title of checklist
complete
If an emergency involves smoke fire or fumes, or if any integrity of the aircraft is in doubt or
could be compromised on landing request - CFR Crash fire rescue