- ✔✔According to Nerc Standards, an emergency interchange transaction can be exempt
from tagging if it is less than_________________
•
2 business days
- ✔✔A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to
the RC within how many days
•
5%
- ✔✔During restoration efforts load pick-ups should not exceed_____________ percentage of
synchronized generation capacity
•
load and generation
- ✔✔What are the two components that a system operator should be aware of for controlling
frequency during a system restoration if they are in an islanded situation
•
Energy Emergency Alerts
- ✔✔What system was put in place to provide RC's with a mechanism to handle energy
deficiencies?
•
withing 60 minutes of the start of modification
- ✔✔If due to a reliability event, an interchange transaction must be modified, how long does
the Sink Balancing Authority have to modify the tag?
•
Frequency Fluctuations
- ✔✔What is an example of a disturbance that has caused you system to become islanded?
•
Continuous decline in frequency
- ✔✔What is an instance is which you use manual load shedding?
•
Schedule emergency assistance, recall all non-firm exports, start all available generation
- ✔✔What actions should be implemented during a EEA 2
•
Transmission facility is overloaded, voltages are rapidly decaying, and no other situations are available
, - ✔✔What would be an appropriate situation for a system operator to shed load?
•
Without delay, within 30 minutes
- ✔✔If an RC issues you a directive to implement when should it be implemented?
•
Simulated emergencies
- ✔✔Each Operating Authority should periodically practice________________
•
Its RC and any other potentially affected Transmission Operators
- ✔✔If a Transmission Operator has an anticipated emergency condition, it shall
inform_________________
•
Annually
- ✔✔How often shall the Transmission Operator and BA review and update each emergency
plan___________
•
60
- ✔✔According to Nerc Standards, emergency plans must include interim provisions if it is
expected to take more than how many minutes to implement the contingency plan for loss
of primary control facility
•
EEA 2
- ✔✔Which EEA is used to announce the change in transmission service priority?
•
Reliability Coordinator
- ✔✔Who is the only entity that can declare an EEA?
•
No one
- ✔✔Who must a system operator receive approval from to manually shed load?
•
frequency, the rate of frequency decay, the rate of voltage decay
- ✔✔Automatic load shedding schemes should consider the following 3 things........
•
periodic testing
- ✔✔Blackstart capabilities should be verified by______________
2026/2027 (Graded A+)
•
60 minutes
- ✔✔According to Nerc Standards, an emergency interchange transaction can be exempt
from tagging if it is less than_________________
•
2 business days
- ✔✔A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to
the RC within how many days
•
5%
- ✔✔During restoration efforts load pick-ups should not exceed_____________ percentage of
synchronized generation capacity
•
load and generation
- ✔✔What are the two components that a system operator should be aware of for controlling
frequency during a system restoration if they are in an islanded situation
•
Energy Emergency Alerts
- ✔✔What system was put in place to provide RC's with a mechanism to handle energy
deficiencies?
•
withing 60 minutes of the start of modification
- ✔✔If due to a reliability event, an interchange transaction must be modified, how long does
the Sink Balancing Authority have to modify the tag?
•
Frequency Fluctuations
- ✔✔What is an example of a disturbance that has caused you system to become islanded?
•
Continuous decline in frequency
- ✔✔What is an instance is which you use manual load shedding?
•
Schedule emergency assistance, recall all non-firm exports, start all available generation
- ✔✔What actions should be implemented during a EEA 2
•
Transmission facility is overloaded, voltages are rapidly decaying, and no other situations are available
, - ✔✔What would be an appropriate situation for a system operator to shed load?
•
Without delay, within 30 minutes
- ✔✔If an RC issues you a directive to implement when should it be implemented?
•
Simulated emergencies
- ✔✔Each Operating Authority should periodically practice________________
•
Its RC and any other potentially affected Transmission Operators
- ✔✔If a Transmission Operator has an anticipated emergency condition, it shall
inform_________________
•
Annually
- ✔✔How often shall the Transmission Operator and BA review and update each emergency
plan___________
•
60
- ✔✔According to Nerc Standards, emergency plans must include interim provisions if it is
expected to take more than how many minutes to implement the contingency plan for loss
of primary control facility
•
EEA 2
- ✔✔Which EEA is used to announce the change in transmission service priority?
•
Reliability Coordinator
- ✔✔Who is the only entity that can declare an EEA?
•
No one
- ✔✔Who must a system operator receive approval from to manually shed load?
•
frequency, the rate of frequency decay, the rate of voltage decay
- ✔✔Automatic load shedding schemes should consider the following 3 things........
•
periodic testing
- ✔✔Blackstart capabilities should be verified by______________