• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 25 pages
Exam (elaborations)

NERC Practice Exam Questions | Actual Questions and Answers Latest Updated 2026/2027 (Graded A+)

Document preview thumbnail
Preview 3 out of 25 pages

NERC Practice Exam Questions | Actual Questions and Answers Latest Updated 2026/2027 (Graded A+)

Content preview

NERC Practice Exam Questions | Actual Questions and Answers
Latest Updated 2026/2027 (Graded A+)

•
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending
Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle
difference will be?
- ✔✔The phase angle will increase. When load is increased phase angle will increase.

•
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw?
- ✔✔90 pf= mw/mva

•
The high side of a delta-wye connection transformer is connected to a power system with 199 kV L-G
high side voltage. What is the voltage across the delta winding of the transformer?
- ✔✔Vl-l= square root of 3 times Vl-g 1.73x191= 345kV

•
If a transmission line is carrying 400 MW and 300 MVAR what is the MVA?
- ✔✔3-4-5 triangle 500 MVA

•
The prime mover is the component of the generator that creates the rotational force. In a typical coal
fired steam generator what component spins the rotor?
- ✔✔Turbine

•
Reactive reserve response during a disturbance is best obtained from which devise?
- ✔✔Synchronous condensers

•
For two identically constructed transmission lines where Line A is 150 miles long and line B is 15 miles
long, if both lines are lightly loaded?
- ✔✔A produces more reactive power than B.

•
Lightly loaded transmission lines essentially behave like?
- ✔✔Shunt Capacitors

•
You receive an alarm that indicates low oil pressure on an underground transmission cable. SCADA
shows the pressure is continuing to drop. What is the first step you take to protect the line?
- ✔✔Isolate the line

,•
Computer simulations show that for a 100 MW schedule from Bus A to Bus B, 63% of the schedule will
flow on the scheduled path and the remainder will flow on other parallel paths. What is the distribution
factor for the scheduled path?
- ✔✔63%

•
Which statement best describes how reactive power MVAR power normally flows?
- ✔✔High Voltage to Low Voltage

•
Which of the following types of data are BA and RC not required to share with one another?
- ✔✔Generator start up cost

•
TOP must develop, maintain, and implement formal policies and procedures to provide for
transmission reliability. Which of the following DOES NOT need to be addressed in these policies and
procedures?
- ✔✔Planned outages of generation units

•
A 1000 MVA rated generator that produces 800 MW and 100 MVAR is best described as?
- ✔✔Operating in a lagging mode. Inductive system

•
Which of the following types of MW load is the most impacted by an intentional frequency reduction?
- ✔✔Motor

•
Assume there are two 250 mile long transmission lines exporting an excessive amount of MW from a
generation area to a load area. One of the lines suddenly trips and the area power system collapses
within a few seconds. The most likely cause of the collapse?
- ✔✔Angle Instability

•
The phase voltage in a wye-connected load is 277 V. What is the line to line voltage?
- ✔✔480 V

•
A simple power system is composed of three lines connecting generation to load. Each lines the same
impedance, is initially loaded at 200 MW, and has a thermal limit of 400 MW. If one line trips, what the
loading on the shortest remaining line be and will the thermal limit either remaining line be violated?
- ✔✔300 MW and No

•
The best prediction of system load is the load forecast tool that uses?
- ✔✔Forecasted Weather

, •
If the phase angel at an open breaker is equal to 1/10 of a cycle, this is the the same angle as?
- ✔✔1/10 of 360 so 36

•
A ___________ tool is used to ensure the power system can respond within acceptable limits of N-1
- ✔✔Contingency Analysis

•
Which of the following activities would not be included in the procedures for transmission reliability?
- ✔✔Ancillary service pricing

•
The transmission Operator and BA shall provide documentation that operating personnel have ______
to implement real time actions to ensure the stable and reliable operation of the BES.
- ✔✔Proper NERC Certification Credential

•
A utility distribution bus has the following customer loads attached. What is the total customer MW load
and is the total customer load capacitive or inductive? 5 MW 1 MVAR & 3 MW 1 MVAR & 2 MW -2
MVAR & 10 MW 3 MVAR
- ✔✔20 mw and Inductive

•
How many MVARs does a 230 kV, 50 MVAR capacitor bank provide when the voltage id 207 kV
i. - ✔✔Actual MW/ Rated MW ^2 x Capacitor Rating
ii. 40

•
You are a system operator and the load forecast is for an all time summer peak load day, generations
and reactive resources will be tight. Which scheduled job would you allow to proceed?
- ✔✔735 kV shunt reactor maintenance.

•
A contingency results in the exceedance of an IROL. What could be the result if the IROL is allowed to
be exceeded longer than T sub v
- ✔✔Interruption of power to a large part of the BES

•
Generators have the ability to be used as voltage control devices. If a generator raises its VAR output,
the system orator should expect system stage to?
- ✔✔Increase

•
The actual voltage is 362kV on a 345 bus. What is the p.u. voltage?
- ✔✔1.05

Document information

Uploaded on
September 26, 2026
Number of pages
25
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
23
Followers
0
Items
9010
Last sold
18 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions