NERC mix question | Actual Questions and Answers Latest Updated 2026/2027 (Graded A+)

Document preview thumbnail
Preview 3 out of 29 pages

NERC mix question | Actual Questions and Answers Latest Updated 2026/2027 (Graded A+)

Content preview

NERC mix question | Actual Questions and Answers Latest
Updated 2026/2027 (Graded A+)

•
The Disturbance Control Standard measures a Balancing Authority's response to a rapid loss of
_____________.

•
demand for energy.
interchange.
ACE.
supply of energy.
- ✔✔supply of energy

•
A Balancing Authority's largest single contingency is a unit rated at 1,000 MW. Which of the following
disturbances would constitute a reportable disturbance for Disturbance Control Performance
evaluation based on the NERC DCS criteria?

•
The loss of a 950 MW generating unit at 100% output.
The loss of 3 generating units totaling 1,300 MW over a period of 3 hours.
The loss of a 750 MW generating unit at 100% output.
The loss of 715 MW of firm load.
- ✔✔The loss of a 950 MW generating unit at 100% output.

•
Balancing Authority informs the Reliability Coordinator that the projected load in a Balancing Area for
the next four hours (over the morning peak) is trending above the available generation that had been
committed for the day. Operating Reserves will be required to be converted into energy to cover the
shortfall. Which Energy Emergency Alert (EEA) level should the RC declare?

•
No EEA should be declared until load shed is expected.
EEA 1
EEA 2
EEA 3
- ✔✔EEA 1

•
A Balancing Authority anticipating an operating capacity or energy emergency shall perform all actions
necessary which includes:

•
Bringing on all available generation
All answers are correct
Preparing to reduce firm load
Postponing equipment maintenance

,- ✔✔All answers are correct

•
As a Transmission Operator, you realize that the voltage level is starting to decline in the North West
part of the system. Which of the following devices should you, as a Transmission Operator, be able to
operate, and/or have another entity operate to raise the voltage level back to normal in the North West
part of the system?

•
Generator Reactive Output
Transformer Underload Tap Changers
All answers are correct
Shunt Capacitor Banks
- ✔✔All answers are correct

•
If a Balancing Authority, Reserve Sharing Group is experiencing conditions where all available
resources are committed to meet firm load, firm transactions, and reserve commitments, what does the
deficient entity need to request their Reliability Coordinator to issue?

•
Energy Emergency Warning
Energy Emergency Alert Level 2
Energy Emergency Alert Level 3
Energy Emergency Alert Level 1
- ✔✔Energy Emergency Alert Level 1

•
One of the functions of underfrequency load shedding is to ______________ within an electrical island
that may have been created by a system disturbance.

•
establish balance between load and interchange balance generation and load
stabilize balance between generators
stabilize the Interconnection
- ✔✔balance generation and load

•
A Balancing Authority that is operating asynchronously (separated from the Interconnection) should
switch its AGC to which mode __________.

•
flat frequency control
tie line bias control
manual control
flat tie-line control
- ✔✔flat frequency control

, •
During a system restoration, what is the system operators priority?

•
Interconnection frequency
Restoration of customer load
Restoration of interchange
Restoration of off-site startup power to generating facilities
- ✔✔Restoration of off-site startup power to generating facilities

•
If multiple lines trip resulting in parallel lines overloading and voltage decreasing, the system operator
should first consider which mitigating actions?

•
Re-dispatch or bring on additional generation
Shed load to reduce the powerflow on the overloaded lines
Open the line breakers to the overloaded lines.
Curtail Interchange Scheduled to the low voltage area
- ✔✔Re-dispatch or bring on additional generation

•
A Balancing Authority foresees or is experiencing conditions where all available resources are
committed to meet firm load, firm transactions. The BA should request which level of the Energy
Emergency Alerts?

•
Energy Emergency Alert Level 1
Energy Emergency Alert Level 4
Energy Emergency Alert Level 2
Energy Emergency Alert Level 3
- ✔✔Energy Emergency Alert Level 1

•
The System Operator experiences a major transmission system disturbance which results in a large
loss of load. Which of the following results is most likely to occur?

•
an increase in system frequency
an increase in system voltage in a wide-area
a decrease in system voltage
a decrease in system frequency
- ✔✔an increase in system frequency

•
A Balancing Authority is assessing its system by reviewing the frequency at locations in its area and
notices a frequency reading at one location varies significantly from the other locations. What might the
Balancing Authority conclude?

Document information

Uploaded on
September 26, 2026
Number of pages
29
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
23
Followers
0
Items
9010
Last sold
18 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions