Concrete Flatwork Tech and Flatwork Finisher (3rd Ed.) Actual Questions with Detailed Answers

Document preview thumbnail
Preview 3 out of 27 pages

Concrete Flatwork Tech and Flatwork Finisher (3rd Ed.) Actual Questions with Detailed Answers

Content preview

Concrete Flatwork Tech and Flatwork Finisher (3rd Ed.) Actual
Questions with Detailed Answers

Question 1.
(Ch. 1, #1) It is important that the _______ _______ read and understand project
specifications

Correct Answer: finishing foreman


Question 2.
(Ch. 1, #2) If the crew can place and finish 100yd^3 (m^3) of concrete per hour, the
producer's rate should be about ____ yd^3(m^3) per hour.

Correct Answer: 100


Question 3.
(Ch 1, #3) True or False: Concrete is sold by the ton.

Correct Answer: False (sold by volume)


Question 4.
(Ch. 1, #4) Delays in discharging concrete trucks can result in the concrete being hard to:

Correct Answer: pump, place, and finish


Question 5.
(Ch. 1, #5)
A) Inch/Pound: For a concrete floor slab that is 6 in. thick, 200ft long, and 100 ft wide you
should order ____ yd^3 of concrete, assuming a 10% waste factor.
B) Metric: For a concrete floor slab that is 150 mm thick, 60 m long, and 30 m wide you
should order ____ m^3 of concrete, assuming a 10% waste factor.

Correct Answer: A) 407.41; B) 297


Question 6.
(Ch. 1, #6) When there is room for two concrete trucks ready to discharge into a pump
hopper, placement is faster because:

Correct Answer: as one truck is finishing, the other is ready to unload concrete

,Question 7.
(Ch. 1, #7) Concrete from a ready mix truck must be completely discharged within ____
hours after water has been added at the plant.

Correct Answer: 1.5


Question 8.
(Ch. 1, #8) You can tell when water was added to the concrete truck by looking at the:

Correct Answer: batch ticket


Question 9.
(Ch. 1, #9) When concrete for a slab placement will be discharged from the truck chute,
truck arrivals should usually be spaced about:

Correct Answer: 15 minutes


Question 10.
(Ch. 1, #10) True or False: When finishers get behind because the concrete is setting
faster than expected and the placing crew is also shorthanded, one solution is slowing the
concrete delivery rate to match worker output.

Correct Answer: True


Question 11.
(Ch. 1, #11) True or False: In deciding how much concrete to order for a floor placement,
you should calculate the number of cubic yards (cubic meters) needed to fill the forms,
then order two or three cubic yards (cubic meters) less so you don't waste concrete that is
not needed.

Correct Answer: False (Standard is to order 10% to 15%
*more* than measured volume for small orders and 5 to 10% more than
measured volume for large orders to account for subgrade settlement, uneven
subgrade, spillage, and waste.)


Question 12.
(Ch. 1, #12) The question "What finisher or finishers can request the addition of water to
the concrete truck on site?" Should be answered at the _________ __________.

Correct Answer: preconstruction conference

, Question 13.
(Ch. 2, #1) True or False: Concrete made with portland cement will set and harden while
underwater.

Correct Answer: True


Question 14.
(Ch. 2, #2) If a concrete slab on ground won't be exposed to sulfates, the cement used is
most likely to be:

Correct Answer: Type I


Question 15.
(Ch. 2, #3) Fly ash may be added to concrete from a fly ash silo at the batch plant or from
a silo containing a _______ cement.

Correct Answer: portland


Question 16.
(Ch. 2, #4) Most concrete used in slabs on ground has course aggregate with a maximum
size of:

Correct Answer: 0.75 to 1.5 in. (19 to 38 mm.)


Question 17.
(Ch. 2, #5) True or False: Sand for concrete used in slabs on ground is easier to finish
when it has close to the largest allowable amount of material passing the No. 50 and No.
100 sieves.

Correct Answer: True


Question 18.
(Ch. 2, #6) True or False: Increasing the amount of sand in a concrete usually decreases
the amount of water needed to make the concrete workable.

Correct Answer: False (Too many small particles will *in- crease* the amount of
water needed to make the concrete workable.)


Question 19.
(Ch. 2, #7) All concrete that will be subject to freezing when moist or be exposed to
deicing salts should contain:

Correct Answer: an air-entraining agent

Document information

Uploaded on
September 26, 2026
Number of pages
27
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
31
Followers
1
Items
15949
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions