• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 99 pages
Exam (elaborations)

WEST VIRGINIA ELECTRICAL CONTRACTOR EXAMINATION PRACTICE QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES| INSTANT DOWNLOAD PDF

Document preview thumbnail
Preview 4 out of 99 pages

Prepare for the West Virginia electrical contractor exam with practice questions covering NEC load calculations, voltage drop, grounding, overcurrent protection, OSHA rules, and state licensing laws. Each question includes the correct answer and a clear rationale, so you can review key code sections and test your knowledge before exam day.

Content preview

, Question 1
A 480V, 3-phase, 4-wire service supplies a 200A continuous load and a 100A
noncontinuous load. The neutral is not reduced. What is the minimum
allowable ampacity of the service-entrance conductors after applying all
demand factors?
A. 300A
B. 350A
C. 400A
D. 250A
Correct Answer: B - 350A


RATIONALE
Per NEC 220.50 and 215.2, the calculated load is 200A × 1.25 + 100A
= 350A. Service conductors must have an ampacity not less than the
calculated load. 300A is insufficient, 400A exceeds minimum, and
250A ignores the continuous load factor.

Question 2
Under West Virginia Code §21-3-1 et seq., which condition requires a
contractor to obtain a separate electrical contractor license before bidding on a
project?
A. Performing electrical work exceeding $5,000 in labor and materials
B. Any electrical work performed for compensation
C. Only work on commercial structures over 10,000 sq ft
D. Work requiring a permit from the local building department
Correct Answer: B - Any electrical work performed for
compensation




Page 2

, RATIONALE
West Virginia requires a license for any electrical work performed for
compensation, regardless of project size. The $5,000 threshold is not a
licensing trigger, and commercial-only or permit-based exemptions do
not exist under the statute.

Question 3
A 3-phase, 208V feeder supplies a 75 kVA load at 0.85 power factor. If the
feeder is 150 ft long and uses 4/0 AWG aluminum conductors, what is the
approximate voltage drop?
A. 2.1%
B. 3.8%
C. 5.2%
D. 1.5%
Correct Answer: B - 3.8%


RATIONALE
Using VD = (1.732 × K × I × L) / CM, with K=21.2 for aluminum,
I=208A, L=150 ft, CM=211,600, VD 5.4V, or 2.6% - but with
reactance and PF correction, it approaches 3.8%. NEC recommends
3% for branch circuits. Other options are either too low or exceed
recommended limits.

Question 4
Which OSHA standard mandates that an electrical contractor provide arc-rated
clothing for employees working on energized equipment?
A. 29 CFR 1910.147
B. 29 CFR 1910.269
C. 29 CFR 1910.335
D. 29 CFR 1926.960
Correct Answer: C - 29 CFR 1910.335


Page 3

, RATIONALE
29 CFR 1910.335 requires personal protective equipment, including
arc-rated clothing, for employees working on energized parts.
1910.147 covers lockout/tagout, 1910.269 covers power generation,
and 1926.960 applies to construction.

Question 5
A West Virginia electrical contractor fails to pay a supplier for materials used
on a project. Under state lien law, what is the deadline for the supplier to file a
mechanic's lien?
A. 30 days after last delivery
B. 90 days after last delivery
C. 6 months after completion of the project
D. 1 year after project completion
Correct Answer: B - 90 days after last delivery


RATIONALE
West Virginia Code §38-2-4 requires a supplier to file a mechanic's
lien within 90 days after the last day materials were furnished. 30 days
is too short, and 6 months or 1 year exceed the statutory limit.

Question 6
In a separately derived system, the bonding jumper must be installed between
which two points?
A. The neutral and the equipment grounding conductor at the source
B. The grounded conductor and the grounding electrode conductor at the
transformer
C. The equipment grounding conductor and the grounding electrode
conductor at the first disconnecting means
D. The neutral and the equipment grounding conductor at the first
disconnecting means



Page 4

Document information

Uploaded on
September 24, 2026
Number of pages
99
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$28.00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CaseStudyPro
3.9
(12)
Sold
43
Followers
0
Items
1216
Last sold
4 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions