VIRGINIA CONTRACTOR'S EXAM WITH PREP QUESTIONS AND CORRECT ANSWERS PLUS RATIONALES Q&A| INSTANT DOWNLOAD

Document preview thumbnail
Preview 4 out of 124 pages

This study guide covers Virginia contractor licensing, DPOR regulations, USBC building code, mechanic's liens, OSHA standards, and estimating. It includes practice questions with correct answers and rationales to help you understand key concepts and prepare for the Virginia contractor's exam. Use it to review important topics and test your knowledge before exam day.

Content preview

, Question 1
A Virginia contractor holds a Class B license and is offered a single contract
for $140,000. The project involves constructing a new commercial building.
Under Virginia DPOR regulations, which statement is most accurate?
A. The contractor may accept the contract because Class B allows
projects up to $150,000.
B. The contractor may accept the contract because Class B has no dollar
limit for commercial work.
C. The contractor must decline or upgrade to Class A because Class B is
limited to $120,000.
D. The contractor may accept only if the building is not for public use.
Correct Answer: C - The contractor must decline or upgrade to
Class A because Class B is limited to $120,000.


RATIONALE
Class B contractors are limited to projects under $120,000, or
$750,000 for remodeling/repair. A $140,000 new commercial building
exceeds this limit, requiring a Class A license. Class A allows
unlimited project value.

Question 2
During a renovation, a contractor discovers that a load-bearing wall must be
removed. According to the Virginia Uniform Statewide Building Code
(USBC), which action is required before proceeding?
A. Notify the local building department and obtain a permit modification.
B. Proceed if a licensed structural engineer approves the removal.
C. Install a temporary shoring system and continue work.
D. Submit as-built drawings within 30 days after completion.
Correct Answer: A - Notify the local building department and
obtain a permit modification.



Page 2

, RATIONALE
The USBC requires a permit for structural alterations. Removing a
load-bearing wall is a structural change, necessitating a permit
modification and inspection. Engineer approval alone does not satisfy
code requirements.

Question 3
A Virginia contractor files a mechanic's lien on a property. The owner disputes
the lien, claiming the contractor did not provide the required pre-lien notice.
Under Virginia Code § 43-3, which factor is most critical in determining the
lien's validity?
A. Whether the contractor recorded the lien within 90 days of last work.
B. Whether the contractor sent a Notice of Intent 30 days before
recording.
C. Whether the contractor obtained a written contract with the owner.
D. Whether the contractor is licensed in the same locality as the property.
Correct Answer: B - Whether the contractor sent a Notice of
Intent 30 days before recording.


RATIONALE
Virginia Code § 43-3 requires a Notice of Intent to file a lien to be
sent at least 30 days prior to recording. Failure to provide this notice
invalidates the lien. Other factors like timing and contract are also
important but the notice is critical.

Question 4
On a Virginia construction site, a subcontractor's employee is exposed to silica
dust. Which OSHA standard primarily governs the required engineering
controls and respiratory protection?
A. 29 CFR 1926.1153 - Respirable Crystalline Silica
B. 29 CFR 1926.501 - Fall Protection


Page 3

, C. 29 CFR 1926.1053 - Ladders

D. 29 CFR 1926.300 - Hand and Power Tools
Correct Answer: A - 29 CFR 1926.1153 - Respirable Crystalline
Silica


RATIONALE
29 CFR 1926.1153 specifically addresses respirable crystalline silica
in construction, mandating engineering controls, work practices, and
respiratory protection. Other standards cover different hazards.

Question 5
A contractor uses the unit price method to estimate a project. The total direct
costs are $80,000. The contractor applies a 15% overhead and 10% profit.
What is the final bid price?
A. $100,000
B. $101,200
C. $102,000
D. $103,500
Correct Answer: B - $101,200


RATIONALE
Overhead is applied to direct costs: $80,000 * 1.15 = $92,000. Profit is
then applied: $92,000 * 1.10 = $101,200. Order of application matters;
if profit applied first, result differs.

Question 6
In Virginia, a contractor must file a state tax return for a project. Which tax
applies to the gross receipts of a construction contract?
A. Virginia Sales and Use Tax
B. Virginia Contractor's Gross Receipts Tax
C. Virginia Personal Property Tax



Page 4

Document information

Uploaded on
September 24, 2026
Number of pages
124
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$28.00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CaseStudyPro
3.9
(12)
Sold
43
Followers
0
Items
1216
Last sold
6 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions