• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Pile Driving Standard Exams Answers And Questions Set A.pdf

Document preview thumbnail
Preview 2 out of 10 pages

PILE DRIVING STANDARD EXAMS ANSWERS AND QUESTIONS SET A.pdf

Content preview

PILE DRIVING STANDARD EXAMS ANSWERS AND
QUESTIONS SET A+
✔✔Closed-End Diesel (Double Acting) Advantages

2-38 - ✔✔• No additional support equipment required
• Drives piles faster
• Lightweight

✔✔Closed-End Diesel (Double Acting) Disadvantages

2-38 - ✔✔• Lowest efficiency
• Most difficult to spot operation problems

✔✔Closed-End Diesel (Double Acting)
455-5.2.2 Diesel: (Continued)

2-39 - ✔✔..... Equip closed-end (double acting) diesel hammers with a bounce chamber
pressure gauge, in good working order, mounted near ground level so the Engineer can
easily read. Also, provide the Engineer with a chart, calibrated to actual hammer
performance within 30 days prior to initial use, equating bounce chamber pressure to
either equivalent energy or stroke for the closed-end diesel hammer to be used.

✔✔Hydraulic Hammer Advantages

2-41 - ✔✔• Controllable variable stroke
• High efficiency blow
• Low impact velocity
• Light weight
• Clean running, quiet

✔✔Hydraulic Hammer Disadvantages

2-41 - ✔✔• Need hydraulic power pack and hoses

, • Need dedicated person for hydraulic controls
• Repairability / high tech
• Expertise in hammer operation needed

✔✔455-5.2.3 Hydraulic

2-42 - ✔✔Variable energy hydraulic hammers shall have at least three hydraulic control
settings that provide for predictable energy or equivalent ram stroke. The shortest
stroke shall be a maximum of 2 feet for the driving of concrete piles. The remaining
strokes shall include full stroke and approximately halfway between minimum and
maximum stroke. Supply hammer instrumentation with electronic read out, and control
unit that allows the operator to read and adjust the hammer energy or equivalent ram
stroke. When pressure measuring equipment is required to determine hammer energy,
calibrate the pressure measuring equipment before use.

✔✔Vibratory Hammer

2-43 - ✔✔• Generally used for driving and extracting sheet piles and non-displacement
H-piles and pipe piles.
• Not impact hammers.

✔✔455-5.2.4 Vibratory

2-44 - ✔✔Vibratory hammers of sufficient capacity (force and amplitude) may be used
to drive steel sheet piles and, with approval of the Engineer, to drive steel bearing piles
a sufficient distance to get the impact hammer on the pile (to stick the pile).....However,
in all cases, use a power impact hammer for the last 15 feet or more of the final driving
of steel bearing piles for bearing determinations after all piles in the bent/pier have been
driven with a vibratory hammer. Do not use vibrating hammers to install concrete piles,
or to install support or reaction piles for a load test.

✔✔Which of the following hammers is NOT to be used to drive concrete piles?
A. Vibratory
B. Diesel
C. Hydraulic
D. Air/Steam

2-45 - ✔✔A. Vibratory

2-44
455-5.2.4

✔✔A bounce chamber pressure gauge is to be provided for which of the following
hammers?
A. Air/Steam

Document information

Uploaded on
September 24, 2026
Number of pages
10
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
sterlingscoress
4.0
(2)
Sold
22
Followers
2
Items
7802
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions