• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

ECU CMGT 4000 (Estimating) final Thomas- Questions with Correct Answers

Document preview thumbnail
Preview 3 out of 20 pages

ECU CMGT 4000 (Estimating) final Thomas- Questions with Correct Answers

Content preview

ECU CMGT 4000 (Estimating) final Thomas-
Questions with Correct Answers
Building a construction estimate is the determination of what

Probable construction cost of any given project

What are the types of estimates

Detailed

Assembly

Square Foot

Model

Parametric

What are the advantages of a Square foot estimate

Quickest

Used to get a rough idea of cost

What are the disadvantages of a Square foot bid

Numbers must be very similar to what is being built

Cannot be relied upon to submit a Bona Fide bid

Where are Assembly bids most commonly used

For single trade estimates

What is an example of an Assembly bid

,A $75 light pole switch installed includes: gang box light switch two wire nuts, cover plate, 20'

of 12 ga wire

What does a Detailed Estimate include

Quantities and cost of everything required to complete the project

Who needs to know how to estimate

Project managers

Job foremen

Architects

Engineers

GCs

Subs

Material Supplier

What skills are needed to do quantity takeoffs

Ability to:

Read and Quantify plans

Have a basic understanding of math and geometry

Good patience

Able to do careful work

Computer literate

What skills are needed to be an estimator

, Quantity takeoff skills

Ability to visualize whole project

Good knowledge of job condition

Knowledge to convert labor and productivity into cost of a project

Keep DATA BASE OF COST FOR FUTURE REFERENCE

Skills in computer spread sheets and databases

Be calm in the storm

Good writing a presentation skills

What is the BEST source of information for bidding

Your Own Historical Data

What are some of the Contract Documents

Scope of work

Time of completion

Contract Sum

Progress Payments

Retained percent

Acceptance and Final payment

What is an Owner-Contractor Agreement

A Formal agreement. incorporates by reference all other contract documents

What do progress payments cover

Document information

Uploaded on
September 24, 2026
Number of pages
20
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER
3.6
(73)
Sold
420
Followers
105
Items
39867
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions