Page |1
QI 102 Questions and Correct Answers/
Latest Update / Already Graded
The Model for Improvement begins with three questions designed to
clarify the following concepts:
Ans: Aims, measures, changes
Applying the Model for Improvement to the clinic's improvement goal,
which of the following is the most reasonable aim statement?
Ans: Increase the number of patients reporting they are "very
satisfied" with the clinic's scheduling by 50 percent within six
months.
What is the team's next step?
Ans: Test their change plan using the PDSA cycle.
The orthopedic clinic plans the change to improve scheduling, and then
it carries out a small test of change with three patients on Tuesday
morning. What's the next thing the clinic's improvement team should
do?
Ans: Measure to see if the change led to improvement.
All rights reserved © 2025/ 2026 |
, Page |2
When trying to improve a process, one reason to use PDSA cycles
rather than a more traditional version of the scientific method (such as
a randomized, controlled trial) is that:
Ans: Both C and D
Having a clear aim statement is important in quality improvement
work because:
Ans: Aim statements provide a clear and specific goal for the
organization to reach.
An aim statement should include the following:
Ans: Numeric goals, specific time frame, patient population or
system affected
Which of the following is the most effective aim statement for this
project?
Ans: Within three months, the emergency department will
administer all pain medications within 45 minutes of order time.
All rights reserved © 2025/ 2026 |
QI 102 Questions and Correct Answers/
Latest Update / Already Graded
The Model for Improvement begins with three questions designed to
clarify the following concepts:
Ans: Aims, measures, changes
Applying the Model for Improvement to the clinic's improvement goal,
which of the following is the most reasonable aim statement?
Ans: Increase the number of patients reporting they are "very
satisfied" with the clinic's scheduling by 50 percent within six
months.
What is the team's next step?
Ans: Test their change plan using the PDSA cycle.
The orthopedic clinic plans the change to improve scheduling, and then
it carries out a small test of change with three patients on Tuesday
morning. What's the next thing the clinic's improvement team should
do?
Ans: Measure to see if the change led to improvement.
All rights reserved © 2025/ 2026 |
, Page |2
When trying to improve a process, one reason to use PDSA cycles
rather than a more traditional version of the scientific method (such as
a randomized, controlled trial) is that:
Ans: Both C and D
Having a clear aim statement is important in quality improvement
work because:
Ans: Aim statements provide a clear and specific goal for the
organization to reach.
An aim statement should include the following:
Ans: Numeric goals, specific time frame, patient population or
system affected
Which of the following is the most effective aim statement for this
project?
Ans: Within three months, the emergency department will
administer all pain medications within 45 minutes of order time.
All rights reserved © 2025/ 2026 |