PMT 3600V Exam 1 | Complete Study
Guide & Practice Questions with Verified
Answers | 2026/2027 Edition
The globally interconnected set of information capabilities for collecting,
processing, storing, disseminating and managing information on demand - correct
answer-What is the DoD Information Network (DoDIN)?
PM - correct answer-Who is in charge of the WIPTs and is responsible for the
program?
NR-KPP - correct answer-What ensures that new systems are "ready" to become
a functioning element within the DoDIN?
DoD Architecture Framework (DoDAF) - correct answer-What serves as a guide
for the development of architectures?
Provides the guidance and rules for developing, representing, and understanding
architectures based on a common denominator across DoD, Joint, and
multinational boundaries. - correct answer-What does the DoDAF provide?
, At a minimum, the MOA covers key issues/areas, specifically, system
requirements, funding, manpower, Capability Development Document
(CDD)/Capability Production Document (CPD) approval process, and other
program documentation. - correct answer-What does an MOA cover at a
minimum?
A program, subprogram, project, or subproject not previously justified by the
Department and funded by the Congress through the normal budget process -
correct answer-What is a "New Start"?
relevant environment
Technology Readiness Level (TRL) 6. - correct answer-Program initiation requires
technology to have been demonstrated in a __________, which is considered
equivalent to ___________.
Technology Readiness Levels (TRLs) are the way DoD has chosen to categorize a
program's
technology maturity. - correct answer-How does DoD categorize technology
maturity?
Attribute 1. Supports military operations:
Attribute 2. Is entered and managed on the network
Attribute 3. Effectively exchanges information - correct answer-What are the
three parameters of the Net-Ready KPP?
DoDI 8510.01 Risk Management Framework (RMF)
Guide & Practice Questions with Verified
Answers | 2026/2027 Edition
The globally interconnected set of information capabilities for collecting,
processing, storing, disseminating and managing information on demand - correct
answer-What is the DoD Information Network (DoDIN)?
PM - correct answer-Who is in charge of the WIPTs and is responsible for the
program?
NR-KPP - correct answer-What ensures that new systems are "ready" to become
a functioning element within the DoDIN?
DoD Architecture Framework (DoDAF) - correct answer-What serves as a guide
for the development of architectures?
Provides the guidance and rules for developing, representing, and understanding
architectures based on a common denominator across DoD, Joint, and
multinational boundaries. - correct answer-What does the DoDAF provide?
, At a minimum, the MOA covers key issues/areas, specifically, system
requirements, funding, manpower, Capability Development Document
(CDD)/Capability Production Document (CPD) approval process, and other
program documentation. - correct answer-What does an MOA cover at a
minimum?
A program, subprogram, project, or subproject not previously justified by the
Department and funded by the Congress through the normal budget process -
correct answer-What is a "New Start"?
relevant environment
Technology Readiness Level (TRL) 6. - correct answer-Program initiation requires
technology to have been demonstrated in a __________, which is considered
equivalent to ___________.
Technology Readiness Levels (TRLs) are the way DoD has chosen to categorize a
program's
technology maturity. - correct answer-How does DoD categorize technology
maturity?
Attribute 1. Supports military operations:
Attribute 2. Is entered and managed on the network
Attribute 3. Effectively exchanges information - correct answer-What are the
three parameters of the Net-Ready KPP?
DoDI 8510.01 Risk Management Framework (RMF)