COB 300 OPERATIONS FINAL ACTUAL
QUESTIONS WITH VERIFIED SOLUTIONS
◉ Concurrent Engineering.
Answer: Emphasizes cross-functional integration and concurrent
development of a product and its associated processes.
◉ Quality function deployment (QFD).
Answer: A process that helps a company determine the product
characteristics important to the consumer and to evaluate its own
product in relation to others.
◉ House of quality.
Answer: A matrix that helps a product design team translate
customer requirements into operating and engineering goals.
◉ Value analysis/value engineering (VA/VE).
Answer: Analysis with the purpose of simplifying products and
processes by achieving equivalent or better performance at a lower
cost.
◉ Ecodesign.
,Answer: The incorporation of environmental considerations into the
design and developmentof products or services.These concerns
relateto the entire life cycle,including materials,manufacturing,
distribution,and the eventual disposalof waste.
◉ Time-to-market.
Answer: A measure of product development success. There are two
measures here: the frequency of new product introductions and the
time from initial concept to market introduction.
◉ Productivity.
Answer: A measure of how well resources are used. According to
Goldratt'sdefinition, all the actions that bring a company closer to its
goals.
◉ Conformance quality.
Answer: The degree to which the product or service design
specifications are met.
◉ Design quality.
Answer: he inherent value of the product in the marketplace.
◉ Six Phases of the Generic Development Process.
Answer: - Phase 0: Planning
, Precedes project approval
- Phase 1: Concept development
Needs of the target market are identified
- Phase 2: System-level design
Definition of product architecture
- Phase 3: Design detail
Complete specification of the geometry, materials, and tolerances for
all parts
- Phase 4: Testing and refinement
Construction and evaluation of multiple pre production versions of
product
- Phase 5: Production ramp-up
Product is made using the intended production system
◉ Phase 0:.
Answer: - Planning
- Precedes project approval
◉ Phase 1.
Answer: - Concept development
- Needs of the target market are identified
QUESTIONS WITH VERIFIED SOLUTIONS
◉ Concurrent Engineering.
Answer: Emphasizes cross-functional integration and concurrent
development of a product and its associated processes.
◉ Quality function deployment (QFD).
Answer: A process that helps a company determine the product
characteristics important to the consumer and to evaluate its own
product in relation to others.
◉ House of quality.
Answer: A matrix that helps a product design team translate
customer requirements into operating and engineering goals.
◉ Value analysis/value engineering (VA/VE).
Answer: Analysis with the purpose of simplifying products and
processes by achieving equivalent or better performance at a lower
cost.
◉ Ecodesign.
,Answer: The incorporation of environmental considerations into the
design and developmentof products or services.These concerns
relateto the entire life cycle,including materials,manufacturing,
distribution,and the eventual disposalof waste.
◉ Time-to-market.
Answer: A measure of product development success. There are two
measures here: the frequency of new product introductions and the
time from initial concept to market introduction.
◉ Productivity.
Answer: A measure of how well resources are used. According to
Goldratt'sdefinition, all the actions that bring a company closer to its
goals.
◉ Conformance quality.
Answer: The degree to which the product or service design
specifications are met.
◉ Design quality.
Answer: he inherent value of the product in the marketplace.
◉ Six Phases of the Generic Development Process.
Answer: - Phase 0: Planning
, Precedes project approval
- Phase 1: Concept development
Needs of the target market are identified
- Phase 2: System-level design
Definition of product architecture
- Phase 3: Design detail
Complete specification of the geometry, materials, and tolerances for
all parts
- Phase 4: Testing and refinement
Construction and evaluation of multiple pre production versions of
product
- Phase 5: Production ramp-up
Product is made using the intended production system
◉ Phase 0:.
Answer: - Planning
- Precedes project approval
◉ Phase 1.
Answer: - Concept development
- Needs of the target market are identified