• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 127 pages
Exam (elaborations)

MICHIGAN MAINTENANCE & ALTERATION CONTRACTOR LICENSE PRACTICE EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES

Document preview thumbnail
Preview 4 out of 127 pages

MICHIGAN MAINTENANCE & ALTERATION CONTRACTOR LICENSE PRACTICE EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES

Content preview

MICHIGAN MAINTENANCE & ALTERATION CONTRACTOR LICENSE PRACTICE EXAM
QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES
Question 1: Under the Michigan Occupational Code (PA 299 of 1980), what is the maximum
administrative fine that the Board of Residential Builders and Maintenance & Alteration Contractors
may impose on an unlicensed individual practicing contractor work?

A. $500

B. $1,000

C. $10,000

D. $25,000

CORRECT ANSWER: C. $10,000

Rationale: Under Michigan Public Act 299 of 1980, Article 6, the department or board may assess an
administrative fine of up to $10,000 against a person practicing a regulated occupation without a license,
alongside criminal penalties prosecuted by the court system.

Question 2: According to the Michigan Residential Code, what is the minimum required net clear
opening width for an emergency escape and rescue window located on the ground floor?

A. 20 inches

B. 24 inches

C. 30 inches

D. 36 inches

CORRECT ANSWER: A. 20 inches

Rationale: Emergency escape and rescue openings must have a minimum net clear opening width of 20
inches and a minimum net clear height of 24 inches. The total minimum net clear opening area required
is 5.7 square feet (or 5.0 square feet for ground-floor openings).

Question 3: How long after the receipt of a formal complaint must a Michigan licensed Residential
Maintenance & Alteration Contractor submit a written response to the Department of Licensing and
Regulatory Affairs (LARA)?

A. 7 days

B. 15 days

C. 30 days

,D. 45 days

CORRECT ANSWER: B. 15 days

Rationale: Upon receipt of a formal complaint forwarded by LARA, the licensee or respondent has 15
days from the date of receipt to respond in writing, outlining their position or defense.

Question 4: Under MIOSHA Construction Safety Standards Part 45 (Fall Protection), at what height
above a lower level is fall protection mandatory for general residential construction activities?

A. 4 feet

B. 6 feet

C. 8 feet

D. 10 feet

CORRECT ANSWER: B. 6 feet

Rationale: MIOSHA Part 45 aligns with federal OSHA guidelines, requiring that employees engaged in
construction activities 6 feet or more above lower levels be protected from falling by guardrail systems,
safety net systems, or personal fall arrest systems.

Question 5: A Michigan Maintenance & Alteration Contractor enters into a contract with a homeowner
for home improvements exceeding $600. Which of the following elements MUST be included in the
written contract to remain compliant with state regulations?

A. The contractor's social security number

B. The manufacturer brand names of all general materials

C. The contractor's license number and expiration date

D. A waiver releasing the contractor from all implied warranties

CORRECT ANSWER: C. The contractor's license number and expiration date

Rationale: Michigan regulations mandate that written residential construction agreements state the
contractor's full legal name, business address, and current Michigan license number alongside terms of
execution and specifications.

Question 6: In a standard residential wood framing system, what is the maximum allowed notch depth
in the middle third of a solid sawn joist span?

A. 1/6 of the joist depth

B. 1/4 of the joist depth

,C. 1/3 of the joist depth

D. No notches are permitted in the middle third of the span

CORRECT ANSWER: D. No notches are permitted in the middle third of the span

Rationale: Under the Michigan Residential Code, structural framing rules prohibit any structural exterior
or interior top/bottom notches within the middle third of a joist's total span length, as this area
experiences peak bending stress.

Question 7: According to the Michigan Construction Lien Act (PA 497 of 1980), within how many days
after providing the first labor or material must a contractor serve a Notice of Furnishing to preserve
their lien rights?

A. 10 days

B. 20 days

C. 45 days

D. 90 days

CORRECT ANSWER: B. 20 days

Rationale: To preserve construction lien rights in Michigan, a subcontractor, supplier, or contractor who
does not have a direct contract with the owner must serve a Notice of Furnishing within 20 days after
first supplying labor or materials to the job site.

Question 8: Under Michigan Worker's Disability Compensation Act requirements, an employer must
carry workers' compensation insurance if they employ how many regular employees?

A. 1 or more employees for 35 consecutive hours or more per week for 13 weeks or more

B. 3 or more employees at any single time

C. 5 or more employees on a seasonal basis

D. Both A and B are correct thresholds

CORRECT ANSWER: D. Both A and B are correct thresholds

Rationale: In Michigan, an employer must carry Workers' Compensation insurance if they employ 3 or
more employees at one time, OR if they employ 1 or more full-time employees working 35+ hours per
week for 13 or more weeks in the preceding 52 weeks.

Question 9: What is the maximum allowable distance between structural supports for 1/2-inch drywall
(gypsum board) applied perpendicular to ceiling joists spaced 24 inches on center without sagging
resistance enhancement?

, A. 12 inches

B. 16 inches

C. 24 inches

D. Drywall cannot be applied perpendicular to 24-inch spacing

CORRECT ANSWER: B. 16 inches

Rationale: Standard 1/2-inch gypsum wallboard installed on ceilings requires maximum support framing
spacing of 16 inches on center unless sag-resistant board (ceiling board) or lightweight formulations
rated for 24-inch span are specifically utilized.

Question 10: Which type of insurance protects a Maintenance & Alteration Contractor if a completed
roof repair fails three months after job completion, causing internal water damage to a client's
furniture?

A. Builder's Risk Insurance

B. Commercial General Liability (Completed Operations coverage)

C. Workers' Compensation Insurance

D. Professional Errors & Omissions Insurance

CORRECT ANSWER: B. Commercial General Liability (Completed Operations coverage)

Rationale: Commercial General Liability insurance includes Products and Completed Operations Hazard
coverage, which covers bodily injury or property damage occurring after the contractor has completed
work on the project site.

Question 11: According to MIOSHA regulations, trench excavations deeper than what depth require a
protective system (such as sloping, benching, or trench shields) unless cut into solid rock?

A. 3 feet

B. 4 feet

C. 5 feet

D. 8 feet

CORRECT ANSWER: C. 5 feet

Rationale: MIOSHA Excavation Standard (Part 9) dictates that protection against cave-ins via shoring,
shielding, or sloping is required in all excavations 5 feet or deeper, unless the excavation is made entirely
in stable rock.

Document information

Uploaded on
September 21, 2026
Number of pages
127
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$22.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorExpert
3.7
(80)
Sold
609
Followers
314
Items
10952
Last sold
21 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions