BICSI RTPM 2027 SETS ANSWERS AND QUESTIONS
SET A+
✔✔Drafting Set Organization - ✔✔Set content/ order and sheet ID
✔✔Sheet Organization - ✔✔Format sheets, drawing title block, system location
✔✔Schedules - ✔✔Consistent format/ term/ content schedules
✔✔Drafting Conventions - ✔✔Standard conventing in draw
✔✔Terms and Abbreviations - ✔✔Used in Construction Documents and specifications.
spelling, terms, notes
✔✔Symbols - ✔✔Common symbols/ classifications/ masterformat numbers
✔✔Notations - ✔✔Guidelines for notation class, use of notes
✔✔Code Conventions - ✔✔Locates codes, tool to expedite code review
✔✔AIA CAD Layer Guidelines - ✔✔Introduction - Overview/ History/ Highlights
Layer Name Format - Concept/ Guidelines
Layer List - Guidelines for all 23 Layers
Commentary ISO/ NCS
✔✔Hierarchy of Layer Name Data Fields - ✔✔Desipline Designator
Major Group
2 Minor Group
Status
✔✔Symbol Types of National Computer Aided Design Standard - ✔✔Identity
Line
Reference
Material
, Template
Text
✔✔Identity - ✔✔Individual object used in the M & E Drawings. Symbolize ojects, scale
independent
✔✔Line - ✔✔Continuous objects, (single or double line)
Scale Independent
✔✔Reference - ✔✔Refer to another reading
Scale independent
✔✔Template - ✔✔Resemble actual objects
Scale Dependent
✔✔Material - ✔✔Graphically locate objects
Can be scale independent and dependent
✔✔Text - ✔✔Graphically indicate word found on a keyboard
✔✔Construction Specifications use standard to jointly produce CSI and CSC and have
three parts - ✔✔General
Products
Execution
✔✔Combining ___ and VIS/ GLS end user is able to track what was installed/ who/
when. Also include attachments - ✔✔Work Breakdown Stucture
✔✔Construction Specification: Masterformat uses _ digit to represent _ levels.
_ additional levels provided - ✔✔6, 3, 2
✔✔_____ level of masterformat is reserved for assignment - ✔✔fourth
✔✔_____level of masterformat is reserved for user definition - ✔✔fifth
✔✔Closeout Submittals - ✔✔As Builts
Network Traffic
Warranty and License
Operantions and Maintenance
Commissioning Plan
Patching Matrix
Photographs
✔✔Project Log Contents - ✔✔Date & Time
SET A+
✔✔Drafting Set Organization - ✔✔Set content/ order and sheet ID
✔✔Sheet Organization - ✔✔Format sheets, drawing title block, system location
✔✔Schedules - ✔✔Consistent format/ term/ content schedules
✔✔Drafting Conventions - ✔✔Standard conventing in draw
✔✔Terms and Abbreviations - ✔✔Used in Construction Documents and specifications.
spelling, terms, notes
✔✔Symbols - ✔✔Common symbols/ classifications/ masterformat numbers
✔✔Notations - ✔✔Guidelines for notation class, use of notes
✔✔Code Conventions - ✔✔Locates codes, tool to expedite code review
✔✔AIA CAD Layer Guidelines - ✔✔Introduction - Overview/ History/ Highlights
Layer Name Format - Concept/ Guidelines
Layer List - Guidelines for all 23 Layers
Commentary ISO/ NCS
✔✔Hierarchy of Layer Name Data Fields - ✔✔Desipline Designator
Major Group
2 Minor Group
Status
✔✔Symbol Types of National Computer Aided Design Standard - ✔✔Identity
Line
Reference
Material
, Template
Text
✔✔Identity - ✔✔Individual object used in the M & E Drawings. Symbolize ojects, scale
independent
✔✔Line - ✔✔Continuous objects, (single or double line)
Scale Independent
✔✔Reference - ✔✔Refer to another reading
Scale independent
✔✔Template - ✔✔Resemble actual objects
Scale Dependent
✔✔Material - ✔✔Graphically locate objects
Can be scale independent and dependent
✔✔Text - ✔✔Graphically indicate word found on a keyboard
✔✔Construction Specifications use standard to jointly produce CSI and CSC and have
three parts - ✔✔General
Products
Execution
✔✔Combining ___ and VIS/ GLS end user is able to track what was installed/ who/
when. Also include attachments - ✔✔Work Breakdown Stucture
✔✔Construction Specification: Masterformat uses _ digit to represent _ levels.
_ additional levels provided - ✔✔6, 3, 2
✔✔_____ level of masterformat is reserved for assignment - ✔✔fourth
✔✔_____level of masterformat is reserved for user definition - ✔✔fifth
✔✔Closeout Submittals - ✔✔As Builts
Network Traffic
Warranty and License
Operantions and Maintenance
Commissioning Plan
Patching Matrix
Photographs
✔✔Project Log Contents - ✔✔Date & Time