FLORIDA FIRE OFFICER 1 TEST PAPER ANSWERS
AND QUESTIONS SET A+
✔✔C - ✔✔1. If a new policy is issued, and you, as the company officer, do not agree
with
it, you should not implement it.
2. When a new policy is issued, you should have a meeting with your fire
fighters to introduce the new policy and answer any questions.
3. If a new policy is issued and you have a question about it, you should ask
for additional information prior to implementing it.
A. Only statement 1 is correct.
B. Statements 1 and 2 are correct.
C. Statements 2 and 3 are correct.
D. All three statements are correct.
✔✔B - ✔✔Leadership is:
A. the person within the organization with the most power.
B. achieving organizational goals through others.
C. the ability to get work accomplished through authority.
D. influencing others against their will.
✔✔C - ✔✔A/an budget details the major equipment or building purchases
the department plans to make.
,A. zero-base
B. line item
C. capital
D. operating
✔✔B - ✔✔The term used to describe the use of a specific building is:
A. construction.
B. occupancy.
C. structure.
D. target hazard
✔✔A - ✔✔When conducting a pre-incident survey, all of the following should be
done except :
A. enter the premises at the rear entrance.
B. contact the individual with whom the survey is scheduled.
C. gather information for a plot plan and floor plans.
D. introduce the crew and state its business.
✔✔B - ✔✔Floor plans drawn during building surveys should:
A. include only furniture.
B. include the layout of individual floors.
C. include property conservation considerations.
D. show a cross section of construction features.
✔✔D - ✔✔Life safety information in a building survey is collected to assure:
1. protection of occupants.
2. evacuation of occupants.
,3. protection of fire fighters.
A. Only statement 1 is correct.
B. Statements 1 and 2 are correct.
C. Statements 1 and 3 are correct.
D. All three statements are true.
✔✔C - ✔✔In pre-incident/pre-emergency planning, an estimate of the fire
flow for the building should be developed to detect any deficiency in the
water supply available.
A. residual
B. average
C. available
D. probable
✔✔A - ✔✔During a company survey, a target hazard has been recognized; the next
step is to:
A. project strategic and tactical probabilities.
B. notify building department.
C. report it to the local fire marshal.
D. formulate tactics.
✔✔D - ✔✔An overhead diagram showing a view of the structure's walls, doors, and
stairs is a:
A. plot survey.
B. sectional view.
C. plot plan.
D. floor plan.
✔✔C - ✔✔One feature common to all types of lightweight or truss construction is that:
, A. only that member will fail.
B. the truss next to it will keep it from failing completely.
C. there may be a sudden and unexpected collapse.
D. it is unlikely to have a total collapse.
✔✔B - ✔✔One of the dangers with lightweight trass construction is:
A. the economical cost.
B. increased vulnerability to fail when exposed to fire.
C. limited use in residential structures.
D. elimination of gusset plates.
✔✔D - ✔✔Which of the following is not considered one of the functions of
pre-incident planning?
A. Conducting the pre-incident survey
B. Developing pre-incident plans
C. Managing pre-incident data
D. Implementing pre-incident strategies
✔✔A - ✔✔1. Pre-incident planning is a problem-solving process.
2. Pre-incident planning should be documented and stored in a secure area for
administrative purposes only.
3. Pre-incident planning must be done on all structures in the jurisdiction.
A. Only statement 1 is correct.
B. Statements 1 and 2 are correct.
C. All three statements are correct.
D. Statements 2 and 3 are correct.
✔✔B - ✔✔The structure itself presents a fire load except for Type I and
AND QUESTIONS SET A+
✔✔C - ✔✔1. If a new policy is issued, and you, as the company officer, do not agree
with
it, you should not implement it.
2. When a new policy is issued, you should have a meeting with your fire
fighters to introduce the new policy and answer any questions.
3. If a new policy is issued and you have a question about it, you should ask
for additional information prior to implementing it.
A. Only statement 1 is correct.
B. Statements 1 and 2 are correct.
C. Statements 2 and 3 are correct.
D. All three statements are correct.
✔✔B - ✔✔Leadership is:
A. the person within the organization with the most power.
B. achieving organizational goals through others.
C. the ability to get work accomplished through authority.
D. influencing others against their will.
✔✔C - ✔✔A/an budget details the major equipment or building purchases
the department plans to make.
,A. zero-base
B. line item
C. capital
D. operating
✔✔B - ✔✔The term used to describe the use of a specific building is:
A. construction.
B. occupancy.
C. structure.
D. target hazard
✔✔A - ✔✔When conducting a pre-incident survey, all of the following should be
done except :
A. enter the premises at the rear entrance.
B. contact the individual with whom the survey is scheduled.
C. gather information for a plot plan and floor plans.
D. introduce the crew and state its business.
✔✔B - ✔✔Floor plans drawn during building surveys should:
A. include only furniture.
B. include the layout of individual floors.
C. include property conservation considerations.
D. show a cross section of construction features.
✔✔D - ✔✔Life safety information in a building survey is collected to assure:
1. protection of occupants.
2. evacuation of occupants.
,3. protection of fire fighters.
A. Only statement 1 is correct.
B. Statements 1 and 2 are correct.
C. Statements 1 and 3 are correct.
D. All three statements are true.
✔✔C - ✔✔In pre-incident/pre-emergency planning, an estimate of the fire
flow for the building should be developed to detect any deficiency in the
water supply available.
A. residual
B. average
C. available
D. probable
✔✔A - ✔✔During a company survey, a target hazard has been recognized; the next
step is to:
A. project strategic and tactical probabilities.
B. notify building department.
C. report it to the local fire marshal.
D. formulate tactics.
✔✔D - ✔✔An overhead diagram showing a view of the structure's walls, doors, and
stairs is a:
A. plot survey.
B. sectional view.
C. plot plan.
D. floor plan.
✔✔C - ✔✔One feature common to all types of lightweight or truss construction is that:
, A. only that member will fail.
B. the truss next to it will keep it from failing completely.
C. there may be a sudden and unexpected collapse.
D. it is unlikely to have a total collapse.
✔✔B - ✔✔One of the dangers with lightweight trass construction is:
A. the economical cost.
B. increased vulnerability to fail when exposed to fire.
C. limited use in residential structures.
D. elimination of gusset plates.
✔✔D - ✔✔Which of the following is not considered one of the functions of
pre-incident planning?
A. Conducting the pre-incident survey
B. Developing pre-incident plans
C. Managing pre-incident data
D. Implementing pre-incident strategies
✔✔A - ✔✔1. Pre-incident planning is a problem-solving process.
2. Pre-incident planning should be documented and stored in a secure area for
administrative purposes only.
3. Pre-incident planning must be done on all structures in the jurisdiction.
A. Only statement 1 is correct.
B. Statements 1 and 2 are correct.
C. All three statements are correct.
D. Statements 2 and 3 are correct.
✔✔B - ✔✔The structure itself presents a fire load except for Type I and