Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

COSC 275 EXAM 1 REVIEW QUESTIONS

Document preview thumbnail
Preview 1 out of 4 pages

COSC 275 EXAM 1 REVIEW QUESTIONS

Content preview

COSC 275 EXAM 1 REVIEW QUESTIONS


Estimating - Answers - The process of determining the anticipated cost of materials,
labor, and equipment of a proposed project.

Take-off - Answers - The process in which detailed lists are compiled, based on
drawings and specifications, of all the material and equipment necessary to construct a
project. The cost estimator uses this list to calculate how much it will cost to build the
project.

Quantities - Answers - Measured amounts of construction items expressed in their
customary units.

Quantification - Answers - In estimating an activity to translate project scope information
into resource quantities suitable for costing. In the engineering and construction
industry, a takeoff is a specific type of quantification that is a measurement and listing of
quantities of materials from drawings.

Quantity Survey - Answers - A detailed analysis of material and equipment required to
construct a project.

Area - Answers - A measurement of a given planar region or of the surface of a solid

Area Method - Answers - A construction cost estimating system employing unit square
foot costs multiplied by the adjusted gross floor area of a building.

Length - Answers - the longest dimension of an object

Linear Measurement - Answers - A unit or systems of units for measuring length

Dimension - Answers - A distance between two points, lines, or planes

Specifications - Answers - Documents that define the quualitative requirements for
products, materials, and workmanship upon which the contract for construction is based

Drawings - Answers - Graphic illustrations depicting the dimensions, design, and
location of a project. Generally including plans, elevations, details, diagrams, schedules,
and sections.

Addendum - Answers - A document describing an addition change, correction, or
modification to contract documents. Issued by the design professional during the
bidding period or prior to the award of contract, and is the primary method of informing
bidders of modifications to the work during the bidding process. Addenda become part
of the contract documents.

Document information

Uploaded on
September 19, 2026
Number of pages
4
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Greaterheights
4.0
(223)
Sold
1169
Followers
882
Items
20690
Last sold
17 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions