• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

Georgia Commercial Contractor Septic Exam Study Guide| Certified Q&A 2026

Document preview thumbnail
Preview 3 out of 19 pages

Georgia Commercial Contractor Septic Exam Study Guide| Certified Q&A 2026

Content preview

1|Page



Georgia Commercial Contractor
Septic Exam Study Guide| Certified
Q&A 2026


Minimum 28 day comprehensive strength of poured in place or pre-cast cement

tanks?- correct-answer - 4000 pounds per square inch.




What are the reinforcing requirements for the walls and base of a poured in place

septic tank?- correct-answer - Minimum 6" x 6" No. 10 gage welded steel

reinforcing wire or fibrous reinforcing material conforming to ASTM specifications

for such materials.




What are the reinforcing requirements for Tank Lids?- correct-answer - 3/8th Inch

steel reinforcing rods (rebar) spaced 12" on center each way extending a

minimum of 2.5" and a maximum of 3" from outside edge of tank lid.

,2|Page




What load must a tank lid be able to withstand?- correct-answer - A uniform live

load of 150lbs per square foot in addition to all loads to which an underground

tank is normally subjected.




When would additional reinforcement be required for loads on concrete tanks?-

correct-answer - When subject to vehicular traffic or when top of tank is placed

more than 3 ft below finished grade.




What is the minimum thickness of poured in place septic tanks? Walls, Bottom,

and lids?- correct-answer - 4"




What are the minimum and maximum access opening tank lid sizes?- correct-

answer - Minimum 15", Maximum 24"

, 3|Page


What is the maximum depth below the ground surface access openings may be

located?- correct-answer - 12 Inches




When is a "Dosing" tank required?- correct-answer - For systems with 500 or

more linear feet of field line.




How is dosing accomplished?- correct-answer - By using pumps or siphons.




How many pumps or siphons are required for a system with greater than 500 ft

but less than 1000 linear feat of field lines?- correct-answer - 1




How many pumps or siphons are required for a system with more than 1000 ft of

field lines?- correct-answer - 2 - Must have alternating pumps or siphons with

alternating absorption fields.

Document information

Uploaded on
September 19, 2026
Number of pages
19
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DRVERITY
3.8
(13)
Sold
114
Followers
0
Items
8838
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions