• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 67 pages
Exam (elaborations)

CMIT Exam (Multiple Choice) Comprehensive Q&A For Certification Success 2026

Document preview thumbnail
Preview 4 out of 67 pages

CMIT Exam (Multiple Choice) Comprehensive Q&A For Certification Success 2026

Content preview

1|Page



CMIT Exam (Multiple Choice)
Comprehensive Q&A For Certification
Success 2026



A CM's role and responsibilities are governed solely by the Owner/CM

Agreement.

True False - correct-answer - True




There are two basic forms of CM, agency and at-risk. Each form provides for the

basic services of construction management practice. However, there are some

key differences. Which of the following do not apply to both CM forms?

A) Both forms provide advice to the owner on constructibility, budget and the

schedule.

B) Both require that the liabilities and risks assumed by the parties be clearly

understood, coordinated, and stated in the respective contracts.

,2|Page


C) Both forms allow the CM to function in an advisory role for the entire

engagement of the CM.

D) Services can vary based on the contractual relationships of the parties and the

risks that are assumed. - correct-answer - C) Both forms allow the CM to function

in an advisory role for the entire engagement of the CM.




Actual usage of a particular contract form for the construction phase depends on:

A) The particular delivery system being used.

B) The type of project being implemented and the completion status of the plans

and specifications at the time of contracting.

C) The consideration of any performance requirements, the level of sophistication

of the owner, and the role of the architect/engineers involved.

D) All of the above - correct-answer - D) All of the above




There are two basic categories of construction phase contracts, cost

reimbursement and fixed price.

True False - correct-answer - True

,3|Page




Under a fixed price or lump sum contract, the contractors can be asked to bid on

work based on partially completed documents (scope bid), or a complete set of

drawings and specifications.

True False - correct-answer - True




The primary advantage of the fixed price or lump sum contract is that bids should

be taken on contract documents that are only 50% complete.

True False - correct-answer - False




A general contractor working under a fixed price contract will always put its

interests ahead of the owner.

True False - correct-answer - True

, 4|Page


Under a cost plus fixed fee arrangement, fixed fee is usually established at the

time of contract award; however, it may vary with the actual cost expended as

the scope of work changes.

True False - correct-answer - True




Under a Guaranteed Maximum Price arrangement, the contractor is usually

selected and a GMP is established with the understanding by the parties that the

actual cost of the work could be greater than the GMP.

True False - correct-answer - False




On some GMP projects, the owner may reserve the right to approve all trade and

purchase contracts. Normally the owner pays the difference between the

estimated trade contract costs and the trade contract award value when the

award value approved by the owner is greater than the estimated bid element

included in the contractor's GMP.

True False - correct-answer - True

Document information

Uploaded on
September 18, 2026
Number of pages
67
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DRVERITY
3.8
(13)
Sold
114
Followers
0
Items
8908
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions