• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 50 pages
Exam (elaborations)

AZ L-97 Geothermal Systems Contractor Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2027 Q&A | Instant Download Pdf

Document preview thumbnail
Preview 4 out of 50 pages

AZ L-97 Geothermal Systems Contractor Exam Practice Questions And Correct Answers (Verified Answers) Plus Rationales 2027 Q&A | Instant Download Pdf

Content preview

AZ L-97 Geothermal Systems Contractor
Exam Practice Questions And Correct
Answers (Verified Answers) Plus
Rationales 2027 Q&A | Instant
Download Pdf


1. What is the primary purpose of a geothermal heat pump system?

A. To generate electricity from sunlight
B. To transfer heat between a building and the ground
C. To burn natural gas more efficiently
D. To cool groundwater for drinking

Answer: B. To transfer heat between a building and the ground

Rationale: A geothermal heat pump uses the relatively stable temperature
of the earth as a heat source in heating mode and a heat sink in cooling
mode.

, 2. Which component transfers heat between the refrigerant circuit and
the ground loop?

A. Expansion tank
B. Ground heat exchanger
C. Thermostat
D. Air filter

Answer: B. Ground heat exchanger

Rationale: The ground heat exchanger, commonly consisting of buried or
submerged piping, transfers thermal energy between the refrigerant
system and the earth or water source.

3. In a closed-loop geothermal system, what normally circulates through
the buried piping?

A. Refrigerant only
B. Potable water only
C. A heat-transfer fluid
D. Compressed air

Answer: C. A heat-transfer fluid

Rationale: Closed-loop systems circulate water or an approved antifreeze
solution through the ground heat exchanger to transfer heat.

, 4. Which type of geothermal loop is installed horizontally in relatively
shallow trenches?

A. Vertical loop
B. Horizontal loop
C. Open-well loop
D. Standing-column loop

Answer: B. Horizontal loop

Rationale: Horizontal systems place the ground-loop piping in trenches,
generally requiring more land area than vertical systems.

5. What is a major advantage of a vertical ground loop?

A. It requires no drilling
B. It requires less land area
C. It eliminates the need for circulation pumps
D. It always costs less to install

Answer: B. It requires less land area

Rationale: Vertical boreholes allow substantial loop length to be installed
where available surface area is limited.

6. What is the primary function of grout in a geothermal borehole?

, A. Lubricate the heat pump compressor
B. Provide thermal contact and seal the borehole
C. Increase refrigerant pressure
D. Prevent thermostat operation

Answer: B. Provide thermal contact and seal the borehole

Rationale: Proper geothermal grout helps transfer heat between the loop
and surrounding formation while sealing the borehole against unwanted
fluid movement.

7. Which factor is particularly important when sizing a geothermal
ground loop?

A. Paint color of the building
B. Building heating and cooling loads
C. Number of interior doors only
D. Roof shingle color

Answer: B. Building heating and cooling loads

Rationale: Ground-loop design must account for the amount of heat that
must be rejected to or extracted from the ground.

8. What does COP stand for in geothermal heat-pump terminology?

Document information

Uploaded on
September 17, 2026
Number of pages
50
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Guestt
4.4
(7)
Sold
21
Followers
0
Items
2626
Last sold
12 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions