ADVANCED RIGGING TESTS COMPLETE
COURSE REVIEW GUIDE
◉ a bundle of 10 #4(1/2 inch) rebar rods, each 40 feet long is to be
picked up by a crane. which of the following is the BEST method for
lifting the bundle to limit the deflection of the rebar?
Answer: use 2 rigging slings that are double-wrapped and chocked
from opposite sides, and evenly spaced
◉ before a spreader bar or beams can be used, they must HAVE been
which of the following?
Answer: load tested to 125%
◉ where should the location of electrical hazards on a job site be
documented?
Answer: a standard lift plan
◉ what is required if the deviation from the lift plan occurs?
Answer: stop the operation
◉ the rated load of a shouldered eyebolt is (always) reduced during
which of the following?
Answer: angular loading
, ◉ demolition operations where the actual weight of a load may be in
doubt is usually designated as which of the following?
Answer: critical lift
◉ what does the load chart range diagram show?
Answer: side view of crane including boom, jibs, and boom
extensions
◉ where should a rigger stand while driving boom connection pins
in place?
Answer: outside the boom
◉ measuring the length of a sling leg throught the attachments
points and dividing it by the vertical distance (height) is the formula
to obtain which of the following?
Answer: sling angle factor
◉ when lifting personel, rotation resistant rope shall be rated to at
least how many times the maximum intended load?
Answer: 10
◉ all of the following are results of unbalanced reeling of the hook
block EXCEPT which?
COURSE REVIEW GUIDE
◉ a bundle of 10 #4(1/2 inch) rebar rods, each 40 feet long is to be
picked up by a crane. which of the following is the BEST method for
lifting the bundle to limit the deflection of the rebar?
Answer: use 2 rigging slings that are double-wrapped and chocked
from opposite sides, and evenly spaced
◉ before a spreader bar or beams can be used, they must HAVE been
which of the following?
Answer: load tested to 125%
◉ where should the location of electrical hazards on a job site be
documented?
Answer: a standard lift plan
◉ what is required if the deviation from the lift plan occurs?
Answer: stop the operation
◉ the rated load of a shouldered eyebolt is (always) reduced during
which of the following?
Answer: angular loading
, ◉ demolition operations where the actual weight of a load may be in
doubt is usually designated as which of the following?
Answer: critical lift
◉ what does the load chart range diagram show?
Answer: side view of crane including boom, jibs, and boom
extensions
◉ where should a rigger stand while driving boom connection pins
in place?
Answer: outside the boom
◉ measuring the length of a sling leg throught the attachments
points and dividing it by the vertical distance (height) is the formula
to obtain which of the following?
Answer: sling angle factor
◉ when lifting personel, rotation resistant rope shall be rated to at
least how many times the maximum intended load?
Answer: 10
◉ all of the following are results of unbalanced reeling of the hook
block EXCEPT which?