• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

Florida Underground Utility Contractor Final Exam Prep Questions And Correct Answers Latest Update

Document preview thumbnail
Preview 3 out of 24 pages

FLORIDA UNDERGROUND UTILITY CONTRACTOR FINAL EXAM PREP QUESTIONS AND CORRECT ANSWERS LATEST UPDATE

Content preview

FLORIDA UNDERGROUND UTILITY
CONTRACTOR FINAL EXAM PREP
QUESTIONS AND CORRECT ANSWERS
LATEST UPDATE


1. According to Florida Statute Chapter 556, what is the minimum time required for an

excavator to notify the Sunshine 811 system before beginning excavation?

A. 24 hours


B. 2 full business days


C. 5 business days


D. 10 business days


Answer: B


Conceptual Explanation: Florida Statute 556.105 requires that an excavator provide

notice not less than 2 nor more than 10 full business days before beginning excavation.


2. Under OSHA Subpart P, at what depth must a protective system be installed in an

excavation, unless the soil is entirely stable rock?

A. 5 feet


B. 4 feet


C. 3 feet

,D. 6 feet


Answer: A


Conceptual Explanation: OSHA 1926.652(a)(1) requires protection for excavations 5 feet

or deeper, unless the excavation is made entirely in stable rock.


3. When installing a water main near a sanitary sewer line in Florida, what is the minimum

horizontal separation required by FDEP rules?

A. 3 feet


B. 6 feet


C. 15 feet


D. 10 feet


Answer: D


Conceptual Explanation: Florida Administrative Code 62-555.314 requires a minimum

horizontal separation of 10 feet between water mains and sewer mains.


4. According to Florida Lien Law (Chapter 713), a Notice to Owner must be served within how

many days of first providing labor or materials?

A. 15 days


B. 30 days


C. 90 days


D. 45 days

, Answer: D


Conceptual Explanation: A Notice to Owner must be served before commencing or not

later than 45 days after commencing to furnish services or materials.


5. What is the maximum allowable slope for an excavation in Type C soil that is less than 20

feet deep?

A. 3/4 to 1


B. 1 to 1


C. Vertical


D. 1.5 to 1


Answer: D


Conceptual Explanation: OSHA requires a maximum slope of 1.5 horizontal to 1 vertical

(34 degrees) for Type C soil.


6. How far must the spoil pile be kept from the edge of the excavation to prevent materials

from falling back into the trench?

A. 2 feet


B. 1 foot


C. 3 feet


D. 5 feet


Answer: A

Document information

Uploaded on
September 17, 2026
Number of pages
24
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar
3.7
(140)
Sold
734
Followers
178
Items
28562
Last sold
3 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions