Section 1 — General Production Requirements and Plant Qualification
1. What is the primary purpose of the FDOT Concrete Batch Plant
Operator qualification?
A. To certify truck drivers
B. To demonstrate knowledge needed for proper concrete batching
C. To approve construction contracts
D. To design bridges
Answer: B
Rationale: The qualification demonstrates that the operator has
adequate concrete-related knowledge for batching and certification
activities.
2. Structural concrete supplied to an FDOT project should come from a
plant that is:
A. Privately inspected only
B. On the Department's accepted production facility listing
C. Located within 10 miles of the project
D. Owned by the contractor
Answer: B
Rationale: FDOT requires structural concrete for Department projects to
come from an approved facility with an accepted quality-control
program.
,3. Concrete for FDOT projects must be produced using:
A. Any available mix
B. Only an approved design mix
C. The driver's preferred mix
D. The lowest-cost mix
Answer: B
Rationale: The study guide requires use of Department-approved
design mixes.
4. Which organization administers FDOT construction training and
qualification programs?
A. CTQP
B. OSHA
C. EPA
D. ASTM
Answer: A
Rationale: FDOT's Construction Training Qualification Program
administers construction qualifications.
5. Who must be present during batching operations for Department
concrete?
A. Only the truck driver
B. The qualified Batch Plant Operator
C. The project architect
D. The bridge inspector
Answer: B
Rationale: The qualified Batch Plant Operator must be present during
batching operations.
,6. The Batch Plant Operator is responsible for signing and certifying
the:
A. Purchase order
B. Delivery ticket
C. Contractor's invoice
D. Project plans
Answer: B
Rationale: The operator certifies the accuracy of the delivery-ticket
information and compliance with the approved mix.
7. An accepted plant's quality-control plan is reviewed by the:
A. District Materials Office
B. Truck manufacturer
C. Local police department
D. Ready-mix driver
Answer: A
Rationale: The District Materials Office reviews the proposed quality-
control plan and arranges the initial qualification inspection.
8. After acceptance of the quality-control plan, the plant number is
placed on the:
A. Driver license
B. Department's Production Facility Listing
C. County tax register
D. Concrete cylinder label
Answer: B
Rationale: Acceptance results in the plant being listed as an approved
production facility.
, 9. An approved plant may be inspected by FDOT:
A. Only once
B. At any time
C. Only after a complaint
D. Only every five years
Answer: B
Rationale: FDOT reserves the right to inspect the plant and its QC
procedures at any time.
10. During normal operation, an FDOT concrete plant is generally re-
inspected:
A. Every three months or as approved
B. Every ten years
C. Once per project
D. Only when concrete fails
Answer: A
Rationale: The study guide identifies three-month reinspection intervals
during active supply, or as otherwise approved.
11. A plant may be placed in suspended status when:
A. It produces too much concrete
B. Significant discrepancies are found during inspection
C. It uses trucks
D. It has multiple stockpiles
Answer: B
Rationale: Discrepancies found during inspection can result in
suspension of approved status.
12. Which position is required at an approved concrete production
facility?
Complete Practice Questions, Correct Answers & Detailed
Rationales
Section 1 — General Production Requirements and Plant Qualification
1. What is the primary purpose of the FDOT Concrete Batch Plant
Operator qualification?
A. To certify truck drivers
B. To demonstrate knowledge needed for proper concrete batching
C. To approve construction contracts
D. To design bridges
Answer: B
Rationale: The qualification demonstrates that the operator has
adequate concrete-related knowledge for batching and certification
activities.
2. Structural concrete supplied to an FDOT project should come from a
plant that is:
A. Privately inspected only
B. On the Department's accepted production facility listing
C. Located within 10 miles of the project
D. Owned by the contractor
Answer: B
Rationale: FDOT requires structural concrete for Department projects to
come from an approved facility with an accepted quality-control
program.
,3. Concrete for FDOT projects must be produced using:
A. Any available mix
B. Only an approved design mix
C. The driver's preferred mix
D. The lowest-cost mix
Answer: B
Rationale: The study guide requires use of Department-approved
design mixes.
4. Which organization administers FDOT construction training and
qualification programs?
A. CTQP
B. OSHA
C. EPA
D. ASTM
Answer: A
Rationale: FDOT's Construction Training Qualification Program
administers construction qualifications.
5. Who must be present during batching operations for Department
concrete?
A. Only the truck driver
B. The qualified Batch Plant Operator
C. The project architect
D. The bridge inspector
Answer: B
Rationale: The qualified Batch Plant Operator must be present during
batching operations.
,6. The Batch Plant Operator is responsible for signing and certifying
the:
A. Purchase order
B. Delivery ticket
C. Contractor's invoice
D. Project plans
Answer: B
Rationale: The operator certifies the accuracy of the delivery-ticket
information and compliance with the approved mix.
7. An accepted plant's quality-control plan is reviewed by the:
A. District Materials Office
B. Truck manufacturer
C. Local police department
D. Ready-mix driver
Answer: A
Rationale: The District Materials Office reviews the proposed quality-
control plan and arranges the initial qualification inspection.
8. After acceptance of the quality-control plan, the plant number is
placed on the:
A. Driver license
B. Department's Production Facility Listing
C. County tax register
D. Concrete cylinder label
Answer: B
Rationale: Acceptance results in the plant being listed as an approved
production facility.
, 9. An approved plant may be inspected by FDOT:
A. Only once
B. At any time
C. Only after a complaint
D. Only every five years
Answer: B
Rationale: FDOT reserves the right to inspect the plant and its QC
procedures at any time.
10. During normal operation, an FDOT concrete plant is generally re-
inspected:
A. Every three months or as approved
B. Every ten years
C. Once per project
D. Only when concrete fails
Answer: A
Rationale: The study guide identifies three-month reinspection intervals
during active supply, or as otherwise approved.
11. A plant may be placed in suspended status when:
A. It produces too much concrete
B. Significant discrepancies are found during inspection
C. It uses trucks
D. It has multiple stockpiles
Answer: B
Rationale: Discrepancies found during inspection can result in
suspension of approved status.
12. Which position is required at an approved concrete production
facility?