• Verkeerd document? Gratis ruilen
  • Geschreven door studenten die geslaagd zijn
  • Direct beschikbaar na je betaling
  • Online lezen of als PDF
Verkopen
Kies je studieland
Kies je taal
Document preview thumbnail
Voorbeeld 2 van de 11 pagina's
Tentamen (uitwerkingen)

Wmgt 322 Exam Study Guide 2026/2027 Accurate Questions With Correct Detailed Solutions || 100% Guaranteed Pass Newest Version

Document preview thumbnail
Voorbeeld 2 van de 11 pagina's

WMGT 322 EXAM STUDY GUIDE 2026/2027 ACCURATE QUESTIONS WITH CORRECT DETAILED SOLUTIONS || 100% GUARANTEED PASS NEWEST VERSION 1. (From the Initial Stages of Project Development) Which of the following could be considered stakeholders for a Civil Engineer project? Select ALL that apply. - ANSWER Contracting Officer Facility User Communications Squadron Representative Airfield Manager 2. (From the Initial Stages of Project Development) Which of the following documents could be considered part of the project record? Select ALL that apply. - ANSWER Independent Government Estimate Quality Control Plan Contractor Submittals 3. (From the Initial Stages of Project Development) A SABER contractor submits a project invoice to the government that includes rental of a 25K Forklift. The construction inspector for this project clearly recalls that the only forklift used on the jobsite was a smaller 5K forklift, which costs significantly less money to rent. Which document in the project record could be used to dispute this claim? - ANSWER AF Form 1477 Daily Construction Inspection Report 4. (From the Programming Fundamentals Lesson) You are working on a project and determine a change order is needed because the beams were too small to handle the roof load. However, this would exceed the approval authority for this Construction project. What is a viable option for the project team? - ANSWER Resubmit the project to obtain appropriate approval even if work must stop while the approval is obtained. 5. (From the Programming Fundamentals Lesson) If a project modifies an existing facility to make it compliant with current codes and regulations, it is likely a(n) _______ project. - ANSWER Repair 6. (From the Programming Fundamentals Lesson) Match the class of cost estimate with its definition and use (not all options will have a match). - ANSWER Class 1: Unit Price Used to negotiate and compare bids with Contractors. 7. Class 3: Parametric Used for budgeting and making the official Programmed Amount. 8. Class 5: Square Foot Used for long range planning when the scope is still poorly defined. 9. (From the Project Management Plan Lesson) MSgt Jones is an extremely competent SNCO that has years of experience working on high voltage power projects. You have recently been appointed project manager for a new power line installation on a remote part of your base. Gaining MSgt Jones onto your project team would be an example of which type of risk? - ANSWER Opportunity 10. 75% rule - ANSWER A guideline used in project management to ensure that 75% of a project's funding is secured before moving forward. 11. APF/NAF - ANSWER Appropriated Funds (APF) and Non Appropriated Funds (NAF) are types of funding sources for projects. 12. Basic programming thresholds - ANSWER The minimum requirements or standards that must be met during the programming phase of a project. 13. Project Lifecycle - ANSWER The natural phases of any project, including Planning & Programming, Design & Contracting, Construction, and Closeout. 14. Planning & Programming - ANSWER The phase where requirements are identified, scope is developed, and advocacy for authority and resources occurs. 15. Design & Contracting - ANSWER The phase where scope is used to develop design and prepare documents for construction. 16. Construction - ANSWER The phase involving inspections, quality assurance, safety, and monitoring progress. 17. Closeout - ANSWER The phase where final inspections are conducted, work is finalized, as-builts and O&M manuals are collected, and SMS is updated. 18. Project Planning - ANSWER The strategy and analysis which results in a built infrastructure requirement, leading to preferred project alternatives for effective mission support at the lowest life-cycle cost. 19. Programming - ANSWER The process of documenting requirements and acquiring both the authority and the resources necessary to accomplish planned work.

Voorbeeld van de inhoud

WMGT 322 EXAM STUDY GUIDE
2026/2027 ACCURATE QUESTIONS
WITH CORRECT DETAILED
SOLUTIONS ||
100% GUARANTEED PASS
<NEWEST VERSION>


1. (From the Initial Stages of Project Development) Which of the following
could be considered stakeholders for a Civil Engineer project? Select ALL
that apply. - ANSWER ✔ Contracting Officer
Facility User
Communications Squadron Representative
Airfield Manager

2. (From the Initial Stages of Project Development) Which of the following
documents could be considered part of the project record? Select ALL that
apply. - ANSWER ✔ Independent Government Estimate
Quality Control Plan
Contractor Submittals

3. (From the Initial Stages of Project Development) A SABER contractor
submits a project invoice to the government that includes rental of a 25K
Forklift. The construction inspector for this project clearly recalls that the
only forklift used on the jobsite was a smaller 5K forklift, which costs
significantly less money to rent. Which document in the project record could
be used to dispute this claim? - ANSWER ✔ AF Form 1477 Daily
Construction Inspection Report

4. (From the Programming Fundamentals Lesson) You are working on a
project and determine a change order is needed because the beams were too
small to handle the roof load. However, this would exceed the approval
authority for this Construction project. What is a viable option for the project

, team? - ANSWER ✔ Resubmit the project to obtain appropriate approval
even if work must stop while the approval is obtained.

5. (From the Programming Fundamentals Lesson) If a project modifies an
existing facility to make it compliant with current codes and regulations, it is
likely a(n) _______ project. - ANSWER ✔ Repair

6. (From the Programming Fundamentals Lesson) Match the class of cost
estimate with its definition and use (not all options will have a match). -
ANSWER ✔ Class 1: Unit Price
Used to negotiate and compare bids with Contractors.

7. Class 3: Parametric Used for budgeting and making the official Programmed
Amount.

8. Class 5: Square Foot Used for long range planning when the scope is still
poorly defined.

9. (From the Project Management Plan Lesson) MSgt Jones is an extremely
competent SNCO that has years of experience working on high voltage
power projects. You have recently been appointed project manager for a new
power line installation on a remote part of your base. Gaining MSgt Jones
onto your project team would be an example of which type of risk? -
ANSWER ✔ Opportunity

10.75% rule - ANSWER ✔ A guideline used in project management to ensure
that 75% of a project's funding is secured before moving forward.

11.APF/NAF - ANSWER ✔ Appropriated Funds (APF) and Non-
Appropriated Funds (NAF) are types of funding sources for projects.

12.Basic programming thresholds - ANSWER ✔ The minimum requirements
or standards that must be met during the programming phase of a project.

13.Project Lifecycle - ANSWER ✔ The natural phases of any project,
including Planning & Programming, Design & Contracting, Construction,
and Closeout.

Documentinformatie

Geüpload op
15 september 2026
Aantal pagina's
11
Geschreven in
2026/2027
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$13.99

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
ProfBenjamin
3.8
(157)
Verkocht
794
Volgers
19
Items
4151
Laatst verkocht
1 dag geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen