Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

4B Boiler Safety Devices Unit 3 4th class Power Engineering Questions and Answers

Document preview thumbnail
Preview 2 out of 11 pages

4B Boiler Safety Devices Unit 3 4th class Power Engineering Questions and Answers

Content preview

4B Boiler Safety Devices Unit 3 4th class Power Engineering
Questions and Answers


Question 1.
The discharge pipe from a boiler safety valve is supported independently of the safety
valve: Select one: a.Because the steam drum cannot support the extra mass of the
discharge pipe b.So the discharge pipe can drain more easily c.So the discharge pipe can
expand without putting force on the safety valve d.To prevent leakage at the pipe joint

Correct Answer: So the discharge pipe can expand without putting force on the
safety valve


Question 2.
Which part of ASME-BPVC.I states that the boiler manufacturer must ensure the lowest
visible water level in a gauge glass is at least 50 mm above the lowest permissible water
level? a.Part 6.3.1.1 b.Part PG-60.1 c.Part HG-603 d.Part PG-60.1.1.1

Correct Answer: Part PG-60.1


Question 3.
When a boiler steam outlet stop valve is required by code, the preferred style of valve is

Correct Answer: An outside screw and yoke, rising stem valve


Question 4.
o increase the opening pressure of a safety valve,

Correct Answer: Increase spring compression


Question 5.
A test connection for a boiler pressure gauge

Correct Answer: Is usually installed between the siphon and the pressure gauge


Question 6.
Every steam boiler must have a safety valve that is

Correct Answer: Fitted in a vertical position, directly connected to the top of the
boiler.


Question 7.
Temperature relief devices can open on a rise in temperature by the expansion of a
wax-filled rod or by the

Correct Answer: Melting of the alloy in a fusible plug

, Question 8.
If a shutdown occurs during normal firing of a boiler and the steam pressure is below the
normal cutout value, the problem could be

Correct Answer: An interlock, such as the combustion air proving switch, has
failed


Question 9.
Which of the following is NOT a category into which ASME-BPVC.I and ASME-B31.1 divide
high-pressure plant piping? a.Non-boiler external piping b.Boiler external piping c.Boiler
proper piping d.Boiler non-proper internal piping

Correct Answer: Boiler non-proper internal piping


Question 10.
One purpose of the small valve on top of the shell of most boilers, which is not required by
code, is to: Select one: a.Allow water into the boiler when the boiler is being drained or
cooled preventing the formation of a vacuum. b.Allow water to escape before the steam
stop valve is opened during the warm-up period. c.Allow air to escape from the boiler when
the boiler is being filled with water. d.Allow air into the boiler when the boiler is being filled
with water.

Correct Answer: Allow air to escape from the boiler when the boiler is being
filled with water.


Question 11.
The minimum DN size of the blowoff piping of a steam heating boiler is

Correct Answer: 20 mm


Question 12.
In the image for a natural gas fuel train for a boiler over 3000 kW, which letter indicates to
the main test firing valve?

Correct Answer: J


Question 13.
Why are steam boilers equipped with pressure limit controls? a.To increase the energy
input, should the pressure limit controls fail b.So the energy output of a boiler is always
equal to the energy demand c.To reduce or stop the energy input, should the pressure
limit controls fail d.To ensure steam boiler continues to fire at an excessive rate to attain
steam pressure

Correct Answer: To reduce or stop the energy input, should the pressure limit
controls fail


Question 14.
Automatically fired heating boilers are NOT equipped with which of the following switches?
a.Burner on-off b.Manual-automatic c.Damper positioning d.Low-fire/high-fire

Document information

Uploaded on
September 15, 2026
Number of pages
11
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SpencerHenderson
3.8
(54)
Sold
280
Followers
117
Items
50374
Last sold
16 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions