Terms in this set (61)
The purpose of the Deploy All immediately upon receipt of dispatch instruction
Resources Action is to instruct all
generating resources to be on line
and at full output _________
A Heavy Load Voltage Schedule Ensure all unit voltage regulators are in service
Warning has been issued for the PJM
RTO. Generation Operators should:
PJM can issue the Deploy All the entire RTO, specific Control Zones or a subset of
Resources Action for________ a Control Zone if transmission limitations exist
, Under the National Terrorism Imminent Threat Alert
Advisory System (NTAS) there are 2
types of alerts: Elevated Threat Alert
and __________.
A Geomagnetic Disturbance Warning K7
is issued by PJM when the NOAA has
issued a warning or an alert for a
potential geo-magnetic storm of
severity _______ or greater.
The Generating Capacity reported on Capacity from offline Hydro and CT units that can
a Supplementary Status Report (SSR) be synchronized within 10 minutes.
includes which of the following? Total Capacity from online Generation.
(Select 2)
What is the requested response time 10 Minutes
for members to reply to a request for
SSR data?
If a PJM Member has received reports The PJM Shift Supervisor
of a terrorism or sabotage threat to
their facilities, they would notify
whom at PJM (in addition to NERC
and the DOE) to share this
information?
What is the purpose of a capacity To keep Members informed of actual capacity
emergency warning? (Select 2) shortages or contingencies that may jeopardize
reliability during real time operations. To ask
Members to take specific actions in order to provide
relief to the PJM system
Answers | Verified || ACTUAL EXAM 2026 TEST!!
Graded A+ | 2026 EXAM UPDATE
Play your way to mastery with fun games
Match Blocks Charms NEW
Terms in this set (61)
The purpose of the Deploy All immediately upon receipt of dispatch instruction
Resources Action is to instruct all
generating resources to be on line
and at full output _________
A Heavy Load Voltage Schedule Ensure all unit voltage regulators are in service
Warning has been issued for the PJM
RTO. Generation Operators should:
PJM can issue the Deploy All the entire RTO, specific Control Zones or a subset of
Resources Action for________ a Control Zone if transmission limitations exist
, Under the National Terrorism Imminent Threat Alert
Advisory System (NTAS) there are 2
types of alerts: Elevated Threat Alert
and __________.
A Geomagnetic Disturbance Warning K7
is issued by PJM when the NOAA has
issued a warning or an alert for a
potential geo-magnetic storm of
severity _______ or greater.
The Generating Capacity reported on Capacity from offline Hydro and CT units that can
a Supplementary Status Report (SSR) be synchronized within 10 minutes.
includes which of the following? Total Capacity from online Generation.
(Select 2)
What is the requested response time 10 Minutes
for members to reply to a request for
SSR data?
If a PJM Member has received reports The PJM Shift Supervisor
of a terrorism or sabotage threat to
their facilities, they would notify
whom at PJM (in addition to NERC
and the DOE) to share this
information?
What is the purpose of a capacity To keep Members informed of actual capacity
emergency warning? (Select 2) shortages or contingencies that may jeopardize
reliability during real time operations. To ask
Members to take specific actions in order to provide
relief to the PJM system