North Carolina General Contractor/Nascla Exam 2026/2027 | Complete Questions And Answers (Verified Answers) | Exam Prep | Comprehensive Exam Guide 2026&2027

Document preview thumbnail
Preview 4 out of 77 pages

NORTH CAROLINA GENERAL CONTRACTOR/NASCLA EXAM 2026/2027 | COMPLETE QUESTIONS AND ANSWERS (VERIFIED ANSWERS) | EXAM PREP | COMPREHENSIVE EXAM GUIDE 2026&2027

Content preview

NORTH CAROLINA GENERAL CONTRACTOR/NASCLA EXAM
2026/2027 | COMPLETE QUESTIONS AND ANSWERS (VERIFIED
ANSWERS) | EXAM PREP | COMPREHENSIVE EXAM GUIDE
2026&2027
1. A general contractor is reviewing a project before submitting a bid. Which document
should be examined first to determine the overall scope and contractual requirements of
the project?
A. Material safety data sheet
B. Project plans and specifications
C. Employee time sheet
D. Equipment maintenance log

Answer: B

The plans and specifications establish the project's scope, materials, performance
requirements, and many contractual obligations.

2. A contractor discovers that the quantity of concrete shown on the drawings appears
substantially lower than the quantity required by the dimensions shown. What should the
contractor do before submitting the bid?
A. Ignore the discrepancy
B. Use the lower quantity
C. Request clarification and reconcile the documents
D. Automatically double the quantity

Answer: C

Conflicting information should be clarified before pricing so the contractor can establish an
accurate and defensible bid.

3. Which business practice provides the strongest protection against disputes concerning
changes to the original scope of work?
A. Verbal approval from the superintendent
B. Written change documentation signed by authorized parties
C. Verbal agreement with the owner
D. Contractor notes kept privately

Answer: B

Written, authorized change documentation establishes what changed, who approved it, and
how price and schedule are affected.

,4. A contractor wants to determine whether a project is financially viable before
committing resources. Which calculation is most useful initially?
A. Gross profit and projected project costs
B. Number of employees only
C. Equipment age
D. Office rent only

Answer: A

Comparing expected revenue with direct and indirect project costs provides a foundation for
evaluating profitability.

5. Which financial statement primarily reports a company's assets, liabilities, and owner's
equity at a specific point in time?
A. Income statement
B. Cash-flow forecast
C. Balance sheet
D. Job-cost report

Answer: C

A balance sheet presents the company's financial position at a particular date.

6. A contractor has substantial profits on paper but repeatedly struggles to pay suppliers
on time. Which issue is most likely responsible?
A. Excessive depreciation
B. Poor cash-flow management
C. Excessive employee training
D. Low equipment utilization

Answer: B

Profitability and cash availability are different. Poor timing of collections and payments can
create serious cash-flow problems even when a company is profitable.

7. Which document is most useful for comparing the actual cost of labor and materials with
the amount originally budgeted for a project?
A. Job-cost report
B. Employee handbook
C. Safety data sheet
D. Corporate charter

Answer: A

A job-cost report allows management to identify cost variances and determine whether the
project is remaining within budget.

,8. A contractor receives a bid from a subcontractor that is significantly lower than every
competing bid. What is the best first action?
A. Accept it immediately
B. Assume the subcontractor found a better supplier
C. Verify the scope, quantities, exclusions, and pricing
D. Increase the subcontractor's price

Answer: C

An unusually low bid may contain omissions or misunderstandings. Scope and exclusions
should be confirmed before relying on it.

9. Which estimating practice most directly reduces the risk of omitting required work?
A. Estimating from memory
B. Using a detailed quantity takeoff
C. Using only the owner's verbal description
D. Selecting a round-number allowance

Answer: B

A detailed quantity takeoff systematically identifies required materials, labor, and work
activities.

10. During estimating, a contractor identifies a material whose price is unusually volatile.
What is the best approach?
A. Ignore price volatility
B. Include appropriate pricing protection or obtain a firm supplier quotation
C. Remove the material from the estimate
D. Assume the lowest historical price

Answer: B

Volatile material costs should be addressed through current quotations, escalation provisions,
allowances, or other appropriate contractual protection.

11. Which factor should generally be included when calculating labor burden?
A. Only the employee's hourly wage
B. Wage plus applicable payroll taxes and employee-related costs
C. Only overtime wages
D. Only travel expenses

Answer: B

Labor burden includes costs beyond direct wages, such as employer payroll taxes, insurance,
benefits, and other applicable employment costs.

, 12. A contractor estimates direct project costs at $400,000 and expects $80,000 in overhead
and profit. What is the estimated total contract amount if the $80,000 is added to direct
cost?
A. $320,000
B. $400,000
C. $480,000
D. $520,000

Answer: C

Adding $80,000 to $400,000 produces a total of $480,000.

13. A contractor discovers that a proposed project requires specialized work outside the
company's normal expertise. What is the most responsible response?
A. Bid without investigating
B. Evaluate qualifications and consider a qualified specialty subcontractor
C. Assign the work to the newest employee
D. Omit the work from the bid

Answer: B

Specialized work should be performed by appropriately qualified personnel or subcontractors
so quality, safety, and compliance requirements can be met.

14. Which contract provision identifies the amount the owner must pay for completed
work?
A. Payment terms
B. Safety plan
C. Equipment schedule
D. Employee classification

Answer: A

Payment terms establish when and how compensation is to be made.

15. An owner asks a contractor to begin substantial additional work immediately but says
the written change order will be prepared later. What is the safest business response?
A. Proceed without documentation
B. Document the authorization and establish price and schedule effects before proceeding when
practicable
C. Refuse all changes permanently
D. Bill any amount after completion

Answer: B

Document information

Uploaded on
September 15, 2026
Number of pages
77
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$22.09

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
3
Followers
0
Items
329
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions