MTS Exam Questions with all Correct & 100% Verified
Answers |Latest Version |Already Graded A+
Explain ACE and ACE POI ✔Correct Answer-American Council on Education Program of
Instruction for all new and revised courses, 45 instructional hours or longer, to CNATT for
American Council on Education (ACE) evaluation. (1540)
What are the three optional components of the trainee guide and what is the reference?
✔Correct Answer-Trainee Name Page, Cover, and Course Master Schedule. (130B)
When is the CMS created and when is it sent to HQ? ✔Correct Answer-In the design phase
with the COI and TCCD, It is submitted with the final package.(1540)
What does CTTL stand for? ✔Correct Answer-Course Training Task List
What are the 3 components of a CTTL? ✔Correct Answer-Job, Duty, and Task (130B)
How are they written? ✔Correct Answer-Support Course Mission statement; are brief in
nature; begin with a performance action verb; end with an object; and are observable and
measurable.
When is it sent to HQ? ✔Correct Answer-Within 30 days after TPP submission.(1540)
Explain Bottleneck hours and be able to draw one. ✔Correct Answer-A scheduling situation
that occurs when it becomes necessary to divide a class into two or more groups in order to
cycle each group separately through the standard training periods.4:1 is a 4 student to 1
instructor.
Who sets the dates on PAO&M? ✔Correct Answer-FTS (1540)
Who is invited to attend? ✔Correct Answer-FTS - (Chair) (required), CS (required), Course
Developer/SME (required), Lead Instructor (required), Safety Petty Officer/Noncommissioned
Officer (required), Equipment Requirement List (ERL)/Equipment Shortage List (ESL) Liaison
(required), AMTCS Coordinator, Reference Reviewer, Alternate CNATT activity representative,
OIC/Division Officer/Training Officer. (1540)
What is considered for milestone dates? ✔Correct Answer-Planned leave, liberty, and
collateral duty/duties being considered.
Explain the steps from PAO&M to final package, what is created in each step? ✔Correct
Answer-Plan(TPP, POA&M), Analyze (CTTL, Job/duty/tasks), Design, (TCCD (Front matter, COI,
Annexes(CMS, ERL/ESL), testing plan), Develop (LP, TG, Tests, IMM, Pilot, Post pilot), Implement
, (Letter of Promulgation(CNO or CO) and issue by CCA, Begin training, Evaluate (FCR, Test Item
Analysis, Course Utilization, Safety Review, and HPRR) (1540)
What 3 types of external reviews in an FCR? ✔Correct Answer-Graduates, graduate
supervisors, and technical representatives.(1540)
What do you have to do with externals that require feedback? ✔Correct Answer-CCMM will
collate feedback from all alternate learning sites and provide one master summary for the FCR
Record. (1540)
What is a HPRR? ✔Correct Answer-Human Performance Requirements Review (133)
What is a product of a HPRR? ✔Correct Answer-Course Change or Revision
Where can you find current HPRR chits? ✔Correct Answer-NKO
What are the 4 components of the justification section of TPP? ✔Correct Answer-Reference,
Reason/Source of Information, Summary of Differences, Impact if not Approved.
How many days in advance does a pre-pilot package need to be submitted? ✔Correct Answer-
Not later than 90 days prior to the designated pilot course convening(1540)
What are the high and low percentages for Utilization justification? ✔Correct Answer-less
than 80 percent and more than 120 percent (1540)
How many years are calculated for it? ✔Correct Answer-Input data will be for the past two
fiscal years.
Is it required for a safety review? ✔Correct Answer-1540 says annually, so yes.
How many days do you have to submit a post pilot monitoring report? ✔Correct Answer-
Within 30 days after completion of the Course Pilot.(1540)
When is the final package due to HQ? ✔Correct Answer-All final packages must be submitted
via the Site FTS 45 days following completion of the pilot. (1540)
What does CDP stand for? ✔Correct Answer-Course Data Processing.
What does it represent? ✔Correct Answer-The code assigned to uniquely identify each course
of instruction and its location.
Who is the course pilot approval authority? ✔Correct Answer-Curriculum Control Authority.
Answers |Latest Version |Already Graded A+
Explain ACE and ACE POI ✔Correct Answer-American Council on Education Program of
Instruction for all new and revised courses, 45 instructional hours or longer, to CNATT for
American Council on Education (ACE) evaluation. (1540)
What are the three optional components of the trainee guide and what is the reference?
✔Correct Answer-Trainee Name Page, Cover, and Course Master Schedule. (130B)
When is the CMS created and when is it sent to HQ? ✔Correct Answer-In the design phase
with the COI and TCCD, It is submitted with the final package.(1540)
What does CTTL stand for? ✔Correct Answer-Course Training Task List
What are the 3 components of a CTTL? ✔Correct Answer-Job, Duty, and Task (130B)
How are they written? ✔Correct Answer-Support Course Mission statement; are brief in
nature; begin with a performance action verb; end with an object; and are observable and
measurable.
When is it sent to HQ? ✔Correct Answer-Within 30 days after TPP submission.(1540)
Explain Bottleneck hours and be able to draw one. ✔Correct Answer-A scheduling situation
that occurs when it becomes necessary to divide a class into two or more groups in order to
cycle each group separately through the standard training periods.4:1 is a 4 student to 1
instructor.
Who sets the dates on PAO&M? ✔Correct Answer-FTS (1540)
Who is invited to attend? ✔Correct Answer-FTS - (Chair) (required), CS (required), Course
Developer/SME (required), Lead Instructor (required), Safety Petty Officer/Noncommissioned
Officer (required), Equipment Requirement List (ERL)/Equipment Shortage List (ESL) Liaison
(required), AMTCS Coordinator, Reference Reviewer, Alternate CNATT activity representative,
OIC/Division Officer/Training Officer. (1540)
What is considered for milestone dates? ✔Correct Answer-Planned leave, liberty, and
collateral duty/duties being considered.
Explain the steps from PAO&M to final package, what is created in each step? ✔Correct
Answer-Plan(TPP, POA&M), Analyze (CTTL, Job/duty/tasks), Design, (TCCD (Front matter, COI,
Annexes(CMS, ERL/ESL), testing plan), Develop (LP, TG, Tests, IMM, Pilot, Post pilot), Implement
, (Letter of Promulgation(CNO or CO) and issue by CCA, Begin training, Evaluate (FCR, Test Item
Analysis, Course Utilization, Safety Review, and HPRR) (1540)
What 3 types of external reviews in an FCR? ✔Correct Answer-Graduates, graduate
supervisors, and technical representatives.(1540)
What do you have to do with externals that require feedback? ✔Correct Answer-CCMM will
collate feedback from all alternate learning sites and provide one master summary for the FCR
Record. (1540)
What is a HPRR? ✔Correct Answer-Human Performance Requirements Review (133)
What is a product of a HPRR? ✔Correct Answer-Course Change or Revision
Where can you find current HPRR chits? ✔Correct Answer-NKO
What are the 4 components of the justification section of TPP? ✔Correct Answer-Reference,
Reason/Source of Information, Summary of Differences, Impact if not Approved.
How many days in advance does a pre-pilot package need to be submitted? ✔Correct Answer-
Not later than 90 days prior to the designated pilot course convening(1540)
What are the high and low percentages for Utilization justification? ✔Correct Answer-less
than 80 percent and more than 120 percent (1540)
How many years are calculated for it? ✔Correct Answer-Input data will be for the past two
fiscal years.
Is it required for a safety review? ✔Correct Answer-1540 says annually, so yes.
How many days do you have to submit a post pilot monitoring report? ✔Correct Answer-
Within 30 days after completion of the Course Pilot.(1540)
When is the final package due to HQ? ✔Correct Answer-All final packages must be submitted
via the Site FTS 45 days following completion of the pilot. (1540)
What does CDP stand for? ✔Correct Answer-Course Data Processing.
What does it represent? ✔Correct Answer-The code assigned to uniquely identify each course
of instruction and its location.
Who is the course pilot approval authority? ✔Correct Answer-Curriculum Control Authority.