• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Amt 2 Comprehensive Test Questions And Solutions

Document preview thumbnail
Preview 2 out of 7 pages

AMT 2 COMPREHENSIVE TEST QUESTIONS AND SOLUTIONS

Content preview

AMT 2 COMPREHENSIVE TEST QUESTIONS AND SOLUTIONS



✔✔Continuity jumper - ✔✔An electrical connection in the overhead contacts system; a
short conductor installed to provide electrical continuity. A jumper cable of carrying full
line current.

✔✔Contractor - ✔✔Personnel working on or near Amtrak property that are not qualified

✔✔Control jumper - ✔✔A cable mechanically connected between electrical equipment
to transmit control power

✔✔Current - ✔✔The flow of electricity through a conductor

✔✔DC hold - ✔✔A term used to describe the restriction on the movement of DC electric
trains or engines within a specified area. Issued by zone one power Director to a train
dispatcher.

✔✔Dead sections - ✔✔AD energize section of the cotton area. The limits are designed
by dead section signs at locations specified in the timetable.

✔✔De-energized - ✔✔Electrical circuits disconnected from the power source are
considered dangerous to life until tested de-energized and properly grounded

✔✔DTMF (Dual Tone Modulated Frequency) - ✔✔A radio activated door control power
switch system specifically for remotely control switches in yards of dark territory to
improve train operation safety and efficiency

✔✔Electric equipment - ✔✔Locomotives and multiple unit cars operated by power
received from the catenary or third rail

✔✔Electric power - ✔✔The rate at which electric energy is transferred by an electric
circuit

✔✔Electric traction Trainee - ✔✔Electric traction employees that are working towards
craft specific qualifications.

✔✔Electrified territory - ✔✔The portion of the railroad equipped for electric train
operation.

✔✔Emergency condition - ✔✔Circumstance which presents a hazard to life,
infrastructure, or equipment that may interfere with train movement.

, ✔✔End approach - ✔✔The gradual slope or incline of the third rail at the beginning and
end of each third rail section. This allows for the smooth transition of the third rail shoe.

✔✔Energized-Live (dangerous to life) - ✔✔Electrical circuits/apparatus connected to a
power source.

✔✔form D - ✔✔A form containing written authorization, restrictions, or instructions,
issued by the train dispatcher to specified individuals.

✔✔Frequency converter station - ✔✔Location where power is received from a local
utility at 60 Hz and it's converted to 25 Hz for distribution to Amtrak transmission
system.

✔✔Ground connection - ✔✔And approved electrical connection to the rail return circuit
or other earth potential that is used to protect personal, equipment, and property when
work is performed in electrified territory.

✔✔Grounding switch - ✔✔A device that is closed to connect wires or electric apparatus
mechanically to the ground.

✔✔High equipment - ✔✔Equipment that, one on top of, will place employee within 3
feet of the catenary.

✔✔Hucking - ✔✔The process of connecting third rail sticks at its joints, end
approaches, and/or attaching high-voltage cable to third rail, using a hydraulic gun.
Bolts, washers, collars, and splice bars are used to secure these joints upon the
pressure of the hydraulic gun.

✔✔Impedance bond - ✔✔A device which separate signal track circuits from traction
return circuits by providing a path for traction return current around insulated block
joints.

✔✔Insulated tool - ✔✔Tools used by AMT-2 qualified employees around electrified third
rail, designed with wooden or fiberglass handles for protection against electric shock.

✔✔Live line tools - ✔✔Insulated handheld sticks for use on high voltage circuits.

✔✔Load dispatcher - ✔✔An employee who monitors and regulates power demands for
the 25 Hz electrification system.

✔✔Main circuit breaker (MCB) - ✔✔A device located on electric equipment that
interrupts The flow of power from the pantograph to the main power transformer.

Document information

Uploaded on
September 14, 2026
Number of pages
7
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
187
Followers
2
Items
60878
Last sold
10 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions