Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 37 pages
Exam (elaborations)

ENGV 380 Quiz 3 – Construction Industry, Management Functions & Estimates | Questions & Answers | Liberty University 2026

Document preview thumbnail
Preview 4 out of 37 pages

ENGV 380 Quiz 3 – Construction Industry, Management Functions & Estimates | Questions & Answers | Liberty University 2026

Content preview

ENGV 380 Quiz 3 – Construction Industry,
Management Functions & Estimates | Questions &
Answers | Liberty University 2026

1. Which project participant typically owns or finances the construction project?
A. General contractor
B. Owner
C. Subcontractor
D. Material supplier
Correct Answer: B. Owner
Rationale: The owner initiates or commissions the project, provides or arranges
financing, and ultimately receives the completed facility.


2. In a traditional design-bid-build project, who is primarily responsible for
preparing the design documents?
A. General contractor
B. Material supplier
C. Architect or engineer
D. Equipment operator
Correct Answer: C. Architect or engineer
Rationale: The design professional develops drawings, specifications, and other
technical documents used to define the project.


3. What is the primary responsibility of a general contractor?
A. Financing the owner's project
B. Executing and coordinating construction work

,C. Approving building codes
D. Designing all government regulations
Correct Answer: B. Executing and coordinating construction work
Rationale: The general contractor manages construction operations and
coordinates subcontractors, labor, materials, and equipment.


4. A subcontractor is generally hired to:
A. Perform specialized construction work
B. Finance the entire project
C. Replace the project owner
D. Approve architectural drawings
Correct Answer: A. Perform specialized construction work
Rationale: Subcontractors typically perform specialized portions of the
construction scope, such as electrical, plumbing, mechanical, or concrete work.


5. Which participant commonly supplies construction materials?
A. Surety
B. Material supplier
C. Owner's representative
D. Building inspector
Correct Answer: B. Material supplier
Rationale: Material suppliers provide products required for construction, such as
concrete, steel, lumber, piping, and finishes.


6. What is the primary purpose of a construction contract?
A. To establish the rights and obligations of the parties
B. To eliminate all construction risks

,C. To replace project drawings
D. To determine employee salaries
Correct Answer: A. To establish the rights and obligations of the parties
Rationale: The contract establishes responsibilities, compensation, scope,
performance requirements, and other legal obligations.


7. Which professional is most directly associated with monitoring structural
design requirements?
A. Structural engineer
B. Payroll clerk
C. Equipment operator
D. Purchasing agent
Correct Answer: A. Structural engineer
Rationale: Structural engineers design and analyze structural systems to meet
applicable requirements.


8. Which participant normally provides bonding services to support contractual
obligations?
A. Surety
B. Architect
C. Laborer
D. Supplier
Correct Answer: A. Surety
Rationale: A surety provides bonds that guarantee specified obligations, subject
to the terms of the bond.


SECTION 2: CONSTRUCTION MANAGEMENT FUNCTIONS

, 9. Which management function establishes what must be accomplished and
how resources will be used?
A. Planning
B. Inspection
C. Closeout
D. Demolition
Correct Answer: A. Planning
Rationale: Planning identifies activities, resources, constraints, sequence, and
methods needed to accomplish project objectives.


10. Organizing primarily involves:
A. Determining organizational responsibilities and relationships
B. Calculating concrete volume only
C. Testing soil samples only
D. Purchasing fuel only
Correct Answer: A. Determining organizational responsibilities and relationships
Rationale: Organizing establishes authority, responsibility, communication, and
resource relationships.


11. Which function involves comparing actual performance with planned
performance?
A. Controlling
B. Estimating
C. Demolition
D. Procurement only
Correct Answer: A. Controlling
Rationale: Controlling involves monitoring performance, identifying variances,
and taking corrective action.

Document information

Uploaded on
September 14, 2026
Number of pages
37
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NursingTotur2
3.3
(87)
Sold
606
Followers
39
Items
6212
Last sold
1 hour ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions