• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

JOURNEYMAN ELECTRICIAN PRACTICE TEST ACTUAL 2026 QUESTIONS AND 100% CORRECT ANSWERS

Document preview thumbnail
Preview 2 out of 7 pages

JOURNEYMAN ELECTRICIAN PRACTICE TEST ACTUAL 2026 QUESTIONS AND 100% CORRECT ANSWERS

Content preview

Journeyman Electrician Practice Test / Actual Exam
Questions & Answers with Rationales (A+ Guide Solution)
Newest 2025/2026
Leave the first rating




Play your way to mastery with fun games


Match Blocks Charms NEW




Students also studied


Flashcard sets Study guides



Journeyman Electrician Exam 3 RCW/WAC Journeyman Electrician Practice Tes... 26

25 terms 30 terms 50 terms 54




JoeDaddy Preview DarkOcta Preview Izzymarlee02 Preview




Terms in this set (50)



Conductors with _____ marked on the insulation are NOT THHN
approved for use in a wet location.
conductors with THHN insulation are approved for use in dry and damp
locations only and conductors with THWN, THHW, and THW insulation are
recognized for use in dry and wet locations.


Given: A one-family dwelling unit with a demand load of 4/0 AWG
200 amperes is supplied with a 120/240 volt, single-
phase, electrical system from the local utility company. one-family dwelling 120/240 volt, single-phase, service-entrance conductors to
What is the MINIMUM size aluminum THW conductors be sized at an ampacity of not less than 83% of the service rating. Therefore,
required for use as service-entrance conductors for this 200 amperes x 83% = 166 amperes; size 4/0 AWG THW aluminum conductors
residence? with an allowable ampacity of 180 amperes should be selected for this
dwelling.

, Where a 150 kVA, single-phase transformer having a 625 amperes
secondary voltage of 120/240 is installed at a multi-
family dwelling, the full-load current rating, in amperes, To find the full-load current rating of the single-phase transformer apply the
of the secondary is _____. single-phase current formula as shown:I = (150 kVA x 1000) / 240 volts =
15,000/240 = 625 amperes




Which one of the following listed circuit breakers is 75 amperes
NOT a standard ampere rating?
the standard ampere ratings for fuses and circuit breakers. A circuit breaker
with an ampere rating of 75 amperes is not a standard ampere rating.


The MINIMUM length of free conductor to be left at 6 inches
each junction box for the purpose of splicing
conductors, or making connections to illuminares or free conductor is to be left at each junction box for splices or the connection
devices shall be _____ . of luminaires or devices. The intent of this rule is to ensure enough conductor
slack for the terminal connections or splices to be made easily.


In general, overhead service-drop conductors shall 8 AWG copper
NOT be smaller than _____.
overhead service-drop conductors to be not smaller than 8 AWG copper or 6
AWG aluminum or copper-clad aluminum. Do not get service-drop
conductors, the overhead conductors between the utility electric supply
system and the service point, confused with the service-entrance conductors,
the conductors from the service point from the utility company to the service
disconnecting means.


When a galvanized eye-bolt is to be used as the point 10 ft.
of attachment for an electrical service, the NEC
requires the eye-bolt to be installed NOT less than _____ provide adequate vertical clearance of the conductors and prevent physical
above finished grade. damage to the conductors and prevent persons from making accidental
contact with the conductors which may create a shock hazard or electrocution.
In no case shall the point of attachment of the service-drop conductors to be
less than 10 ft. above finished grade.


Why is electrical continuity required for metallic To establish an effective ground-fault path and facilitate the operation of the
conduit? over-current protective device.


Electrical continuity is required for metallic conduit to establish an effective
ground-fault path and facilitate the operation of the overcurrent protective
device.

Document information

Uploaded on
September 14, 2026
Number of pages
7
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
Free
Download

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
113
Followers
0
Items
1298
Last sold
17 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions