AMMO 49 TEST COMPLETE QUESTIONS AND VERIFIED SOLUTIONS
◉ What is a fire bill? Answer: A list of procedures you follow in case of
a fire. They should be posted throughout the station.
◉ How is inerted ammunition that kept its original markings and paint
identified as inert? Answer: It is marked with a serial number that is
traceable to a record of certification and identification
◉ What type of deviation is an exemption? Answer: A long-term
deviation for operations that cannot meet criteria at existing facilities
◉ What is the maximum amount of time permitted for an exemption to
be in effect? Answer: 5 years
◉ What type of documentation is NOT required for explosives safety
site approval request (ESAR)? Answer: Ship arrivals???
◉ What two actions are required to support Qualification/Certification
training? Select all that apply.. Answer: Identify A&E personnel
Training all A&E personnel
, ◉ When does a certification expire? Answer: Last day of the 12th month
◉ Which A&E personnel must be qualified/certified before handling
A&E? Answer: All individuals (Navy and Civilian) who handle A&E
◉ Where are Standard Operating Procedures (SOPs) required to be
located? Answer: On-hand in work areas at all times (areas where
processing is performed)
◉ When shall a new Standard Operating Procedure (SOP) be
developed? Answer: Before starting A&E operations
◉ Some examples of required Standard Operating Procedure (SOP)
content includes a title page, references, step-by-step procedures, and.
Answer: a Worker's statement indicating the worker clearly understands
his or her duties
◉ Who or what is authorized to declare unused military munitions as
waste? Answer: Designated Disposition Authority (DDA)
◉ Captive Air Training Missiles (CATMs) are authorized in an aircraft
hangar, without modification to the site approval, provided the CATM
contains only hazard class/division _______________ material..
Answer: A
◉ What is a fire bill? Answer: A list of procedures you follow in case of
a fire. They should be posted throughout the station.
◉ How is inerted ammunition that kept its original markings and paint
identified as inert? Answer: It is marked with a serial number that is
traceable to a record of certification and identification
◉ What type of deviation is an exemption? Answer: A long-term
deviation for operations that cannot meet criteria at existing facilities
◉ What is the maximum amount of time permitted for an exemption to
be in effect? Answer: 5 years
◉ What type of documentation is NOT required for explosives safety
site approval request (ESAR)? Answer: Ship arrivals???
◉ What two actions are required to support Qualification/Certification
training? Select all that apply.. Answer: Identify A&E personnel
Training all A&E personnel
, ◉ When does a certification expire? Answer: Last day of the 12th month
◉ Which A&E personnel must be qualified/certified before handling
A&E? Answer: All individuals (Navy and Civilian) who handle A&E
◉ Where are Standard Operating Procedures (SOPs) required to be
located? Answer: On-hand in work areas at all times (areas where
processing is performed)
◉ When shall a new Standard Operating Procedure (SOP) be
developed? Answer: Before starting A&E operations
◉ Some examples of required Standard Operating Procedure (SOP)
content includes a title page, references, step-by-step procedures, and.
Answer: a Worker's statement indicating the worker clearly understands
his or her duties
◉ Who or what is authorized to declare unused military munitions as
waste? Answer: Designated Disposition Authority (DDA)
◉ Captive Air Training Missiles (CATMs) are authorized in an aircraft
hangar, without modification to the site approval, provided the CATM
contains only hazard class/division _______________ material..
Answer: A