Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

MWS CDC UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS

Document preview thumbnail
Preview 2 out of 15 pages

MWS CDC UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS

Content preview

MWS CDC UPDATED ACTUAL QUESTIONS AND
CORRECT ANSWERS

Question:
1. NFPA 1901 for external fill connection
Answer:
flow min 1000 gpm has a valve, strainer, and elbow slow closing valve >3 in

Question:
2. NFPA 1901 for large tank discharges (dump valves)
Answer:
left, right, and rear 90% of tank volume @ 1000 gpm

Question:
3. saddle tanks location
Answer:
left/right front side of apparatus

Question:
4. steering wheel shouldn't move more than
Answer:
10 degrees without wheels turning

Question:
5. fuel tank level
Answer:
> 3/4 full

Question:
6. NFPA 1901 for braking
Answer:
air brakes operational after 60 sec parking brake must hold on a 20% grade must stop w/in 35 ft practical =
5 mph, 20 ft

Question:
7. Steps for a vacuum test

, Answer:
1) empty pump
2) inspect gauges
3) ID foreign material
4) 20 ft hose connect
5) cap free end
6) tighten caps
7) close discharge
8) connect gauge
9) check oil
10) check for leskd
11) 22 inHg
12) record differences
13) listen for leaks, shutoff engine <10 in vacuum lost in 5 min

Question:
8. Weekly inspections
Answer:
pump/intake strainers pump gearbox and packing glands operate rapid dump system

Question:
9. daily inspection
Answer:
pump primer pump pressure control pump drive control hoselines aux winterization/cooling aux fuel tank -
full aux fire suppression - full foam

Question:
10. Fire pump service tests are preformed at a min
Answer:
once a year

Question:
11. site for fire pump service tests
Answer:
> 4 ft water > 2 ft below surface (strainer) surface < 10 ft below center intake 20 ft suction hose temp
0/100F (atmos) and 35/90F (water) pressure > 29 inHG

Question:
12. equipment for fire pump service tests
Answer:
deluge gun smoothbore tips pitot tube test gauges forms tachometer rope chain and test strand

Question:
13. steps for a pumping test

Document information

Uploaded on
September 12, 2026
Number of pages
15
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGENIUS
4.0
(235)
Sold
1557
Followers
108
Items
113226
Last sold
3 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions