Construction Management Final Exam
Owners are the driving force behind the construction industry because of their needs and
nn nn nn nn nn nn nn nn nn nn nn nn nn
demands. Which of the following are primary duties of the owner of a construction project?
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
- ANS>>-Providing the funding for the project and making periodic payments to the
nn nn nn nn nn nn nn nn nn nn nn nn nn
designers and the contractor.
nn nn nn nn
-Developing the program and outlining the needs and requirements of the end users.
nn nn nn nn nn nn nn nn nn nn nn nn
Which of the following are examples of primary players for any construction project? -
nn nn nn nn nn nn nn nn nn nn nn nn nn
ANS>>Contractors and Architects
nn nn nn
In which period in the construction history the craft training and education through the
nn nn nn nn nn nn nn nn nn nn nn nn nn
organization of craft guilds became common? - ANS>>The Middle Ages
nn nn nn nn nn nn nn nn nn nn
Which industry sector is responsible for the redevelopment of brownfield sites? -
nn nn nn nn nn nn nn nn nn nn nn
ANS>>Environmental
nn
_________ principles focus on creating more value for customers with less work and the
nn nn nn nn nn nn nn nn nn nn nn nn nn
elimination of waste. - ANS>>Lean
nn nn nn nn nn
In which section of the project manual would you find information specific to a soils report?
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
- ANS>>Supplemental Conditions
nn nn nn
In general, the main two components of the CDs include: - ANS>>Drawings and Project
nn nn nn nn nn nn nn nn nn nn nn nn nn
Manual
nn
An advantage of Unit-Price Contract is that the owner will be responsible for the [additional
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
costs for underestimating quantities.] (True/False) - ANS>>True
nn nn nn nn nn nn nn
, Construction Management Final Exam
The _____________ is prepared jointly by the owner, architect, and contractor documenting
nn nn nn nn nn nn nn nn nn nn nn
minor adjustments, repairs, and work items that must be done before substantial
nn nn nn nn nn nn nn nn nn nn nn nn
completion can be achieved. - ANS>>Punch List
nn nn nn nn nn nn nn
The purpose of ____________ is to identify any changes or adjustments made to the
nn nn nn nn nn nn nn nn nn nn nn nn nn
conditions and dimensions of the work relative to the original plans and specifications. -
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
ANS>>As-built Drawings
nn nn
Which member of the project team moves back and forth between the construction site and
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
the home office? - ANS>>Project Manager
nn nn nn nn nn nn
The point at which all punch list work has been completed and the owner can occupy or
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
take possession of the new facility - ANS>>Certificate of Occupancy
nn nn nn nn nn nn nn nn nn nn
Mobilization is all about setting up and getting ready to start construction. Which one of the
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
following activities is not part of the mobilization process? - ANS>>Obtain the certificate of
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
occupancy
nn
CSI MasterFormat divisions (1995): - ANS>>Divisions:
nn nn nn nn nn
1. General Requirements
nn nn
2. Site Construction
nn nn nn
3. Concrete
nn nn
4. Masonry
nn nn
5. Metals
nn nn
6. Wood and Plastics
nn nn nn nn
7. Thermal and Moisture Protection
nn nn nn nn nn
8. Doors and Windows
nn nn nn nn
9. Finishes
nn nn
Owners are the driving force behind the construction industry because of their needs and
nn nn nn nn nn nn nn nn nn nn nn nn nn
demands. Which of the following are primary duties of the owner of a construction project?
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
- ANS>>-Providing the funding for the project and making periodic payments to the
nn nn nn nn nn nn nn nn nn nn nn nn nn
designers and the contractor.
nn nn nn nn
-Developing the program and outlining the needs and requirements of the end users.
nn nn nn nn nn nn nn nn nn nn nn nn
Which of the following are examples of primary players for any construction project? -
nn nn nn nn nn nn nn nn nn nn nn nn nn
ANS>>Contractors and Architects
nn nn nn
In which period in the construction history the craft training and education through the
nn nn nn nn nn nn nn nn nn nn nn nn nn
organization of craft guilds became common? - ANS>>The Middle Ages
nn nn nn nn nn nn nn nn nn nn
Which industry sector is responsible for the redevelopment of brownfield sites? -
nn nn nn nn nn nn nn nn nn nn nn
ANS>>Environmental
nn
_________ principles focus on creating more value for customers with less work and the
nn nn nn nn nn nn nn nn nn nn nn nn nn
elimination of waste. - ANS>>Lean
nn nn nn nn nn
In which section of the project manual would you find information specific to a soils report?
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
- ANS>>Supplemental Conditions
nn nn nn
In general, the main two components of the CDs include: - ANS>>Drawings and Project
nn nn nn nn nn nn nn nn nn nn nn nn nn
Manual
nn
An advantage of Unit-Price Contract is that the owner will be responsible for the [additional
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
costs for underestimating quantities.] (True/False) - ANS>>True
nn nn nn nn nn nn nn
, Construction Management Final Exam
The _____________ is prepared jointly by the owner, architect, and contractor documenting
nn nn nn nn nn nn nn nn nn nn nn
minor adjustments, repairs, and work items that must be done before substantial
nn nn nn nn nn nn nn nn nn nn nn nn
completion can be achieved. - ANS>>Punch List
nn nn nn nn nn nn nn
The purpose of ____________ is to identify any changes or adjustments made to the
nn nn nn nn nn nn nn nn nn nn nn nn nn
conditions and dimensions of the work relative to the original plans and specifications. -
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
ANS>>As-built Drawings
nn nn
Which member of the project team moves back and forth between the construction site and
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
the home office? - ANS>>Project Manager
nn nn nn nn nn nn
The point at which all punch list work has been completed and the owner can occupy or
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
take possession of the new facility - ANS>>Certificate of Occupancy
nn nn nn nn nn nn nn nn nn nn
Mobilization is all about setting up and getting ready to start construction. Which one of the
nn nn nn nn nn nn nn nn nn nn nn nn nn nn nn
following activities is not part of the mobilization process? - ANS>>Obtain the certificate of
nn nn nn nn nn nn nn nn nn nn nn nn nn nn
occupancy
nn
CSI MasterFormat divisions (1995): - ANS>>Divisions:
nn nn nn nn nn
1. General Requirements
nn nn
2. Site Construction
nn nn nn
3. Concrete
nn nn
4. Masonry
nn nn
5. Metals
nn nn
6. Wood and Plastics
nn nn nn nn
7. Thermal and Moisture Protection
nn nn nn nn nn
8. Doors and Windows
nn nn nn nn
9. Finishes
nn nn