8/31/26, 3:09 PM Quiz: Estimating Building Projects and Construction Contract Administration: ENGV380: Project and Construction Management (B03)
Quiz: Estimating Building Projects and
Construction Contract Administration
Due Jun 22 at 11:59pm
Points 30
Questions 6
Time Limit 60 Minutes
This quiz is no longer available as the course has been concluded.
Attempt History
Attempt Time Score
LATEST Attempt 1 14 minutes 30 out of 30
(@ Correct answers are hidden.
Score for this quiz: 30 out of 30
Submitted Jun 12 at 8:49pm
This attempt took 14 minutes.
Incorrect
Question 1
S5/ 5pts
The outside perimeter of a brick wall is 53 ft. Calculate the bricks required to build this
wall if its height is 8 feet and the bricks will all be laid in a running bond. Standard non-
modular bricks have been specified for the project. Assume a 1% waste factor.
2805 bricks
Full credit awarded. Your final answer of 2,805 bricks matches the answer key. Although
no supporting calculations were shown, the final answer is correct. In future
submissions, it is still helpful to show the wall area, the brick-per-square-foot calculation,
and the waste factor so the process is clear.
Question 2
5/ 5pts
What is the contractual relationship between the GC and the A/E? Between the owner and
the subcontractors? Between the contractor and the subcontractors? What role does a
CM play?
Your Answer:
https://canvas.liberty.edu/courses/1026043/quizzes/4769864?module item_id=105618431 1/4
Quiz: Estimating Building Projects and
Construction Contract Administration
Due Jun 22 at 11:59pm
Points 30
Questions 6
Time Limit 60 Minutes
This quiz is no longer available as the course has been concluded.
Attempt History
Attempt Time Score
LATEST Attempt 1 14 minutes 30 out of 30
(@ Correct answers are hidden.
Score for this quiz: 30 out of 30
Submitted Jun 12 at 8:49pm
This attempt took 14 minutes.
Incorrect
Question 1
S5/ 5pts
The outside perimeter of a brick wall is 53 ft. Calculate the bricks required to build this
wall if its height is 8 feet and the bricks will all be laid in a running bond. Standard non-
modular bricks have been specified for the project. Assume a 1% waste factor.
2805 bricks
Full credit awarded. Your final answer of 2,805 bricks matches the answer key. Although
no supporting calculations were shown, the final answer is correct. In future
submissions, it is still helpful to show the wall area, the brick-per-square-foot calculation,
and the waste factor so the process is clear.
Question 2
5/ 5pts
What is the contractual relationship between the GC and the A/E? Between the owner and
the subcontractors? Between the contractor and the subcontractors? What role does a
CM play?
Your Answer:
https://canvas.liberty.edu/courses/1026043/quizzes/4769864?module item_id=105618431 1/4