This ICC General Requirements Special Inspector Exam 2026/2027 study resource contains 100+ exam-style questions and answers across 29 pages, providing focused preparation on the general requirements, responsibilities, procedures, documentation, and code provisions associated with special inspections. The material emphasizes the respective duties of the special inspector, building official, registered design professional, contractor, owner and approved inspection agency. It also reviews approved plans and specifications, statements of special inspections, jurisdictional inspections, structural observations, nonconforming work and inspection reporting.
A central topic is special inspector responsibility and authority. The questions review competence requirements, who employs approved inspection agencies, who prepares the statement of special inspections, who performs structural observations, who has authority to issue stop-work orders, and how discrepancies must be communicated. The document repeatedly reinforces that nonconforming items are initially brought to the contractor’s attention and that unresolved discrepancies require notification of the registered design professional and building official. It also distinguishes special inspections from jurisdictional/municipal inspections and structural observations.
The document provides substantial examination coverage of continuous versus periodic special inspection. Applied scenarios address concrete placement, reinforcing steel, shear walls, columns, grade beams, tilt-up wall panels, post-installed adhesive and mechanical anchors, shotcrete, isolated and continuous footings, foundation walls and work completed by approved fabricators. Several questions specifically reference IBC Section 1705.3 and Table 1705.3, helping candidates practice determining the appropriate extent of inspection from realistic construction situations.
Another major section concerns concrete inspection and testing requirements. Questions cover concrete placement, reinforcing steel, formwork, curing temperatures and techniques, fabrication of strength-test specimens, and accompanying tests such as temperature, slump and air content. The resource also tests candidates on when continuous inspection is necessary and when periodic inspection or an exception may apply. These scenarios make the material particularly relevant for learning how special-inspection requirements are applied on an active construction project rather than simply memorizing terminology.
The study material also emphasizes documentation, progress reports and final reports. Candidates review information expected on daily inspection reports, documentation of nonconforming items, authorized changes, inspection and testing locations, corrective actions, communication with designated parties, and final signed reports confirming fulfillment of required special inspections and testing. Additional questions address evaluation reports, research reports, approved fabricators, revised plans, RFIs, job-site access to approved plans and specifications, and coordination of on-site inspections.
The later questions reinforce seismic and structural inspection concepts, including Seismic Design Categories D, E and F, structural observation requirements, special moment-frame members and seismic-related inspection scenarios. Overall, the question-and-answer format is designed for repeated recall and application of the terminology and code references contained in the study material, making it useful for candidates preparing for an ICC Special Inspector general-requirements examination.
Relevant Students: ICC Special Inspector exam candidates, General Requirements Special Inspector candidates, ICC certification candidates, building inspectors, special inspectors, construction inspectors, quality-control inspectors, engineering technicians, construction management students, civil engineering students, structural inspection trainees, concrete inspection professionals, and professionals studying IBC Chapter 17 special-inspection requirements.
Keywords: ICC General Requirements Special Inspector exam, ICC Special Inspector exam 2026, ICC Special Inspector exam 2027, ICC Special Inspector questions and answers, General Requirements Special Inspector questions, ICC exam preparation, ICC certification exam, IBC Chapter 17, IBC special inspections, special inspection requirements, special inspector responsibilities, building official responsibilities, registered design professional, statement of special inspections, continuous special inspection, periodic special inspection, structural observation, concrete special inspection, IBC 1705.3, IBC Table 1705.3, concrete placement inspection, reinforcing steel inspection, post installed anchors, adhesive anchor inspection, approved fabricator, approved inspection agency, nonconforming items, special inspection daily report, final inspection report, seismic design category, construction inspection, building code exam questions, ICC study guide, special inspector practice questions
Content preview
ICC General Requirements
Special Inspector 2026/2027
Exam Questions with 100%
Correct Answers | Latest
Update
A special inspector shall demonstrate competence to the satisfaction of
the _____________ - ANSWER ✔✔Building Official
The special inspector observes critical building or structural elements
identified in the statements of special inspections for compliance with
__________ and __________ approved by the building official. -
ANSWER ✔✔plans, specifications
,All nonconforming items shall be brought to the immediate attention of
the - ANSWER ✔✔Contractor
What are approved plans? - ANSWER ✔✔Plans that have been
approved by governing jurisdiction.
Who can employ an approved inspection agency? - ANSWER
✔✔Owner or Owner's agent
Special inspections are in addition to the ______________ performed by
the city inspector and the _____________ performed by the structural
engineer of record. - ANSWER ✔✔Jurisdictional/Municipal
Inspections, Structural observation
Special inspections review the _____________ while jurisdictional
inspection reviews the ____________ - ANSWER ✔✔Fine details,
Broad details
When nonconforming items are not corrected the special inspector shall
notify the _________ and _________ - ANSWER ✔✔Register Design
Professional, Building Official
The permit applicant shall submit a statement of special inspections
prepared by the____________ - ANSWER ✔✔Registered design
professional
, Who shall the special inspector furnish inspection reports (progress
reports) to? - ANSWER ✔✔Building official, Registered design
professional, and other designated people
Who performs a structural observation? - ANSWER ✔✔Registered
Design professional.
_____________ is a full time observation of work requiring special
inspection - ANSWER ✔✔continuous special inspection
Is special inspection required for concrete placement of 3000 psi
concrete in isolated spread footings for a single story warehouse? -
ANSWER ✔✔No. (isolated spread footings) IBC 1705.3
Explain what periodic special inspection is - ANSWER ✔✔Special
inspection by the special inspector who is intermittently present where
the work to be inspected has been or is being performed.
Is special inspection required for concrete placement of continuous
footings, for poured in place walls, if the building is two stories in height
and engineer included all footings in his statement of special inspection.
- ANSWER ✔✔Yes (IBC 1705.3)
If it takes 6 1/2 hours to pour 4 shear walls and 26 columns on the third
level of a ten story building, how much time is the special inspector