2026 || MOST RECENT EXAM 2026|2027 ACTUAL COMPLETE
REAL EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED
ANSWERS) ALREADY GRADED A+ | GUARANTEED SUCCESS!!
NEWEST EXAM | JUST RELEASED!!
ISO -ANSWERS-The Insurance Services Office Inc an insurance
organization that provides support to FEMA on implementation of the
CRS
Lateral Pressure -ANSWERS-The amount of pressure imposed sideways
by standing water. Deeper water exerts more lateral pressure than
shallower water
Letter of Map Amendment (LOMA) -ANSWERS-An official revision to a
FEMA map done by describing the property affected. LOMAs are
generally issued when properties have been inadvertently included in
the floodplain
Letter of Map Revision (LOMR) -ANSWERS-An official revision to a
FEMA map done by describing the property affected
Limited Map Maintenance Project -ANSWERS-A small-scale restudy of a
FIS
,Lowest Floor -ANSWERS-The lowest floor of the lowest enclosed area
(including basement) of a building
Manufactured Home -ANSWERS-A building that is transportable in one
or more sections, which is built on a permanent chassis and is designed
for use with or without a permanent foundation when attached to the
required utilities. It includes mobile home and "double wides"
Market Value -ANSWERS-The price a willing buyer and seller agree
upon
Mitigation Division -ANSWERS-The FEMA office that sets national policy
for the NFIP and administers the mapping program
Movable Bed Streams -ANSWERS-A type of flooding that features
uncertain flow paths
Mudslide -ANSWERS-Also known as Mudflow. A condition where there
is a river, flow, or inundation of liquid mud down a hillside
Multi-Objective Management (M-O-M) -ANSWERS-An approach to
planning and funding local programs that involves a variety of local
interests and concerns
, NEPA -ANSWERS-The National Environmental Policy Act, a federal law
that requires agencies to evaluate the environmental impact of a
proposed project
NGVD -ANSWERS-National Geodetic Vertical Datum of 1929, the
national datum used by the NFIP. NGVD is based on mean sea level. It
was known formerly as the "Mean Sea Level Datum of 1929 (MSL)"
No-Rise Certification -ANSWERS-a certification by an engineer that a
project will not cause a set increase in flood heights
Non-Structural Flood Protection Measures -ANSWERS-Administrative
tools for controlling flooding and flood damage, including regulations
on development, building codes, property acquisition and structure
relocation, and modification of existing buildings
Ordinance -ANSWERS-Te generic term for a law passed by local
government
Planned Unit Development (PUD) -ANSWERS-A regulatory approach
that allows a developer to design the entire area while individual
requirements may be relaxed to allow for open space, mixed land uses,
and other variances to traditional zoning rules
Ponding -ANSWERS-Runoff that collects in depressions and cannot
drain out, creating a temporary pond