_____ _____ is the belief that there is a technique, method Best Practice
or process that is more effective at delivering a particular
outcome than any other
A Best Practice is the belief that there is a ______ , _____ - technique
or _____ that is more effective at delivering a particular - method
outcome than any other. - process
How many best practices are there? 10
What are the 3 areas that the implementing techniques are 1. Procurement
categorized into? 2. Contracting
3. Execution
All DB members should be _____ and _____ in the DB - educated
process and be knowledgeable of the differences between - trained
DB and other delivery systems.
_____ is the essence of Design-Build Done Right Teaming
What are the 4 key factors enabling Team Alignment? 1. Early Involvement
2. Qualifications-Based Selection
3. Cost Transparency
4. Fostering an Environment of Trust
The most successful projects engage core team members - design
in the _____ process, before advancing beyond _____ - schematic
design.
Early involvement enables deeper participation in _____ integrated
practices.
Projects should be staffed with individuals that are _____ - educated
and ______ in the implementation of DB best practice and - experienced
whose _______ are well-suited to the collaborative nature - personalities
of the DB process
Senior leadership must support DB project _____. delivery
_____ should create an organization that supports the - Owners
successful procurement and execution of a DB project with - educated
key personnel _____ and _____ in DB project delivery in - trained
an _____ and _____ environment. - integrated
- collaborative
Executive leadership requires _____ _____. True Believers
_____ are responsible for an integrated and collaborative Owners
environment.
, DBIA EXAM #2 Study Guide
Owners are responsible for an _____ and ______ - integrated
environment. - collaborative
Owners must sustain an atmosphere of _____ and _____. - trust
- flexibility
Owners must consistently operate from an _____ DB integrated
mindset.
_____ _____ has a unique definition for each project. Design Excellence
_____ and _____ should collaboratively and jointly define - Owners
the design value that best meet Owner's goals for each - Design-Builders
project.
Owners and Design-Builders should collaboratively and Design Value
jointly define the _____ _____ that best meet Owner's
goals for each project.
_____ _____ is the time from Notice of Award to the end of Post Award
the warranty period.
Post Award is the time from _____ __ _____ to the end of - Notice of Award
the _____ period. - Warranty
_____ Management typically focuses on building the Construction
project.
_____-_____ _____ involves managing people through Design-Build Leadership
the ENTIRE process.
What are the 5 main stages of DB Leadership? 1. Project team formation and alignment.
2. Project pursuit and procurement.
3. Design integration and advancement.
4. Construction.
5. Closeout and Commissioning.
_____ must manage the entire process Design-Builders
What does IDWP stand for? Integrated Design Work Plan
Which phase commitments sets the stage for Integrated Proposal Phase Commitments
Project Leadership and Design-Build Process Control?
The Construction process is _____ while the design - sequential
process is ______. - iterative