Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

QSP [2026] UPDATED ACTUAL Exam | Question and Answer | DETAILED ANSWER EXPLANATIONS

Document preview thumbnail
Preview 3 out of 21 pages

QSP [2026] UPDATED ACTUAL Exam | Question and Answer | DETAILED ANSWER EXPLANATIONS

Content preview

QSP [2026] UPDATED ACTUAL Exam | Question and
Answer | DETAILED ANSWER EXPLANATIONS
• A likely precipitation event is any weather pattern that is forecasted to have a
____% or greater probability of producing precipitation in the project area.

a. 10
b. 25
c. 50
d. 75
e. 99 -✓✓ C

• A QSP is responsible for:

a. Day to day implementation, inspections, and observations
b. Amending the SWPPP as required
c. Developing and certifying the SWPPP
d. Certifying reports in SMARTS -✓✓ a. Day to day implementation, inspections,
and observations

• A storm that produces ½ inch or more of precipitation, with a 48 hour or greater
period between rain events is a/an...

a. Qualifying rain event
b. Extended storm event
c. Inactive storm event
d. Unsafe monitoring event -✓✓ a. Qualifying rain event

• A temporary or permanent structural BMP that directs concentrated flows away
from disturbed areas and prevents erosion is...

a. erosion control
b. run on/ run off control
c. sediment control -✓✓ b. run on/ run off control

• Acceptable methods to demonstrate final stabilization include:

a. 50%vegetative coverage
b. 100% vegetative coverage

,c. RUSLE 2 method -✓✓ c. RUSLE 2 method

• Activities under the CGP include:

a. Routine maintenance to maintain original line and grade, hydraulic capacity, or
original purpose of the facility.
b. Disturbances to land surfaces solely related to agricultural operations.
c. Clearing and grading 2 acres of land
d. Discharges of storm water from areas on tribal lands. -✓✓ c. Clearing and
grading 2 acres of land

• All NAL data must be uploaded within ___ after NAL exceedance has been
identified

a. 24 hours
b. 1 week
c. 10 days
d. 2 weeks -✓✓ c. 10 days

• Certain non-storm water discharges may be necessary for the completion of
construction projects. Therefore the General Permit authorizes such discharges
provided they meet the following conditions except:

a. Meet the NALs for pH and turbidity
b. Not cause or contribute to a violation of water quality standards
c. Comply with BMPs as described in the SWPPP
d. Be infeasible to eliminate
e. Causes or threatens to cause pollution, contamination, or nuisance -✓✓ e.
Causes or threatens to cause pollution, contamination, or nuisance

• Hydrologic source controls are a design technique that minimize and/or slow the
rate of stormwater runoff from the site. Examples include:

a. Reduction of pervious surfaces
b. Use of landscaping as a storm drain treatment feature
c. Drain rooftop downspouts to impervious areas
d. Stormwater treatment facility -✓✓ b. Use of landscaping as a storm drain
treatment feature

, • If the R Factor is ____, you can apply for the Erosivity Waiver.

a. 1
b. Less than 1
c. 5
d. Less than 5 -✓✓ d. Less than 5

• NEL Violation Reports must be submitted to State Board within 24 hours after
exceedance has been identified. NEL's are only subject to:

a. Risk Level 1
b. Risk Level 2
c. Risk Level 3
d. ATS Sites only -✓✓ d. ATS Sites only

• Once identified, dischargers shall begin implementing repairs or design changes
to BMPs:

a. Immediately
b. Within 24 hours
c. Within 48 hours
d. ASAP, but not more than 72 hours -✓✓ d. ASAP, but not more than 72 hours

• Permit Registration Documents (PRDs) shall consist of all of the following
except:

a. Site Map
b. Signed Certification Statement
c. Risk Assessment
d. Notice of Termination (NOT)
e. Notice of Intent (NOI) -✓✓ d. Notice of Termination (NOT)

• Project sediment risk is:

a. the relative amount of sediment that can be discharged, driven largely by
scheduling and site characteristics
b. the risk sediment discharges pose to the receiving waters. -✓✓ a. the relative
amount of sediment that can be discharged, driven largely by scheduling and site
characteristics

Document information

Uploaded on
September 5, 2026
Number of pages
21
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PACKPASS
3.5
(6)
Sold
53
Followers
1
Items
7560
Last sold
17 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions