DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive Questions and Answers with 100% Correct Answers | Latest Version

Document preview thumbnail
Preview 3 out of 16 pages

DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive Questions and Answers with 100% Correct Answers | Latest Version

Content preview

DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive
Questions and Answers with 100% Correct Answers | Latest Version



Masterformat provides a standard structure for organizing construction standards. How many primary
divisions are part of the Masterformat? - (ANSWER)-NOT- 51



Task orders are used for which of the below kinds of work? - (ANSWER)Non-complex construction and
maintenance and repair



The Master Planner wants to award a contract to support the installation's master planning efforts.
Based on FAR Part 36.601-4(a), would this effort be accomplished through an architect-engineer
contract? - (ANSWER)Yes



The Installation Commander is asking questions about military construction, operations and
maintenance, and military family housing projects planned for the installation. Which component of the
Comprehensive Plan would you go to a detail of the physical location of projects that have been
approved or programmed for funding throughout the installation? - (ANSWER)-NOT- Land Use Plan



As the Design Manager preparing the government estimate for a design project. When considering
profit, which if the following in NOT true? - (ANSWER)-NOT- Profit should consider the nature of the
work to be performed



FAR Part 22.406-7 - Compliance Checking requires interviews of laborers to check work classification,
rates of pay, fringe benefits payment, and hours worked. How often is the Government required to
conduct these interviews? - (ANSWER)Agency's policy



All project planning projects include the same five steps. Which of the following shows the five steps in
their logical progression? - (ANSWER)Develop requirements; evaluate assets; analysis, concepts, and
proposals; initiate action; feedback and quality assurance



Which of the following may be required if Government Furnished Equipment (GFE) is not supplied to the
contractor in accordance with the time specified in the contract? - (ANSWER)An adjustment in price or
delivery schedule in the contract

,DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive
Questions and Answers with 100% Correct Answers | Latest Version



The Base Operations Support contractor in performing preventative maintenance on the HVAC in the
headquarters building. At the same time, they are responding to a service call to repair one of the toilets
in the building. This work would be defined as: - (ANSWER)Sustainment



You are the installation Environmental Division Chief. There are residential structures on the installation
where lead-based paint has been used that have been identified for disposal. Which of the following
environmental requirements best describes the procedure(s) that should be followed? - (ANSWER)-NOT-
A report that states the extent of lead-based paint contamination and plans for decontamination must
be submitted



Which of the following is NOT a potential action for disposal of surplus property? - (ANSWER)-NOT-
Public sale



As the Project Manager, why might you NOT prefer to use a design-bid-build methodology for procuring
the design and construction of your project? - (ANSWER)Increased potential for misinterpretations and
possible litigation

&

Lack of input from contractors and subcontractors in the design process



Which of the following is not benefit of the Work Management System? - (ANSWER)Decreased worker
productivity



As the Design Manager you are working with the Contracting Officer to develop the evaluation criteria
for a two-phase design-build solicitation. What would NOT be a first phase evaluation criteria. -
(ANSWER)Cost Proposal



The Contracting Officer needs to direct the contractor to perform changes in the work within the general
scope of the contract. What clause would the Contracting Officer use to unilaterally direct the change? -
(ANSWER)FAR Clause 52.243-4, Changes



The Contracting Officer has issued a Request for Proposal. What will be a requirement for the facility
engineers once proposals have been received. - (ANSWER)Perform independent technical evaluation

, DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive
Questions and Answers with 100% Correct Answers | Latest Version




In a design-build contract, the design-build contractor is for all the following except: - (ANSWER)-NOT-
Construction quality



The Contracting Officer would issue a Request for Proposal under FAR Part 15 procedures to prospective
offerors as part of awarding a construction contract to the lowest price responsible contractor. -
(ANSWER)False



Privatization is the transfer of maintenance responsibilities of an infrastructure to a qualified entity. -
(ANSWER)False



The In-House Design Team can contain all but one of the following disciplines: - (ANSWER)Contracting
Officer



As the Project Manager, you only want to consider price and price-related factors when awarding the
contract. Would you recommend the use of an Invitation for Bids? - (ANSWER)Yes



Work Input Control provides a basic planning and work status information from work inception to it
termination or completion. - (ANSWER)True



As a result of the Project Planning Process, you have developed a project to convert an existing facility to
a new functional purpose due to a new tenant coming to your installation. What work classification
would you give to this project? - (ANSWER)Alteration



Using the design-bid-build methodology, the construction contract is awarded on lowest bid by a
responsible contractor, or it may be awarded through a negotiated acquisition on a best value
continuum. - (ANSWER)True



From Block 9, Cost Estimates on the DD Form 1391, you can determine the Estimated Cost of
Construction (costs for primary and supporting facilities); funds for supervision, inspection, and
overhead; contingencies; and installed equipment funded by other appropriations. - (ANSWER)True

Document information

Uploaded on
September 5, 2026
Number of pages
16
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$22.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NorKnights
5.0
(501)
Sold
3024
Followers
1
Items
502
Last sold
2 days ago


Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions