DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive
Questions and Answers with 100% Correct Answers | Latest Version
Masterformat provides a standard structure for organizing construction standards. How many primary
divisions are part of the Masterformat? - (ANSWER)-NOT- 51
Task orders are used for which of the below kinds of work? - (ANSWER)Non-complex construction and
maintenance and repair
The Master Planner wants to award a contract to support the installation's master planning efforts.
Based on FAR Part 36.601-4(a), would this effort be accomplished through an architect-engineer
contract? - (ANSWER)Yes
The Installation Commander is asking questions about military construction, operations and
maintenance, and military family housing projects planned for the installation. Which component of the
Comprehensive Plan would you go to a detail of the physical location of projects that have been
approved or programmed for funding throughout the installation? - (ANSWER)-NOT- Land Use Plan
As the Design Manager preparing the government estimate for a design project. When considering
profit, which if the following in NOT true? - (ANSWER)-NOT- Profit should consider the nature of the
work to be performed
FAR Part 22.406-7 - Compliance Checking requires interviews of laborers to check work classification,
rates of pay, fringe benefits payment, and hours worked. How often is the Government required to
conduct these interviews? - (ANSWER)Agency's policy
All project planning projects include the same five steps. Which of the following shows the five steps in
their logical progression? - (ANSWER)Develop requirements; evaluate assets; analysis, concepts, and
proposals; initiate action; feedback and quality assurance
Which of the following may be required if Government Furnished Equipment (GFE) is not supplied to the
contractor in accordance with the time specified in the contract? - (ANSWER)An adjustment in price or
delivery schedule in the contract
,DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive
Questions and Answers with 100% Correct Answers | Latest Version
The Base Operations Support contractor in performing preventative maintenance on the HVAC in the
headquarters building. At the same time, they are responding to a service call to repair one of the toilets
in the building. This work would be defined as: - (ANSWER)Sustainment
You are the installation Environmental Division Chief. There are residential structures on the installation
where lead-based paint has been used that have been identified for disposal. Which of the following
environmental requirements best describes the procedure(s) that should be followed? - (ANSWER)-NOT-
A report that states the extent of lead-based paint contamination and plans for decontamination must
be submitted
Which of the following is NOT a potential action for disposal of surplus property? - (ANSWER)-NOT-
Public sale
As the Project Manager, why might you NOT prefer to use a design-bid-build methodology for procuring
the design and construction of your project? - (ANSWER)Increased potential for misinterpretations and
possible litigation
&
Lack of input from contractors and subcontractors in the design process
Which of the following is not benefit of the Work Management System? - (ANSWER)Decreased worker
productivity
As the Design Manager you are working with the Contracting Officer to develop the evaluation criteria
for a two-phase design-build solicitation. What would NOT be a first phase evaluation criteria. -
(ANSWER)Cost Proposal
The Contracting Officer needs to direct the contractor to perform changes in the work within the general
scope of the contract. What clause would the Contracting Officer use to unilaterally direct the change? -
(ANSWER)FAR Clause 52.243-4, Changes
The Contracting Officer has issued a Request for Proposal. What will be a requirement for the facility
engineers once proposals have been received. - (ANSWER)Perform independent technical evaluation
, DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive
Questions and Answers with 100% Correct Answers | Latest Version
In a design-build contract, the design-build contractor is for all the following except: - (ANSWER)-NOT-
Construction quality
The Contracting Officer would issue a Request for Proposal under FAR Part 15 procedures to prospective
offerors as part of awarding a construction contract to the lowest price responsible contractor. -
(ANSWER)False
Privatization is the transfer of maintenance responsibilities of an infrastructure to a qualified entity. -
(ANSWER)False
The In-House Design Team can contain all but one of the following disciplines: - (ANSWER)Contracting
Officer
As the Project Manager, you only want to consider price and price-related factors when awarding the
contract. Would you recommend the use of an Invitation for Bids? - (ANSWER)Yes
Work Input Control provides a basic planning and work status information from work inception to it
termination or completion. - (ANSWER)True
As a result of the Project Planning Process, you have developed a project to convert an existing facility to
a new functional purpose due to a new tenant coming to your installation. What work classification
would you give to this project? - (ANSWER)Alteration
Using the design-bid-build methodology, the construction contract is awarded on lowest bid by a
responsible contractor, or it may be awarded through a negotiated acquisition on a best value
continuum. - (ANSWER)True
From Block 9, Cost Estimates on the DD Form 1391, you can determine the Estimated Cost of
Construction (costs for primary and supporting facilities); funds for supervision, inspection, and
overhead; contingencies; and installed equipment funded by other appropriations. - (ANSWER)True
Questions and Answers with 100% Correct Answers | Latest Version
Masterformat provides a standard structure for organizing construction standards. How many primary
divisions are part of the Masterformat? - (ANSWER)-NOT- 51
Task orders are used for which of the below kinds of work? - (ANSWER)Non-complex construction and
maintenance and repair
The Master Planner wants to award a contract to support the installation's master planning efforts.
Based on FAR Part 36.601-4(a), would this effort be accomplished through an architect-engineer
contract? - (ANSWER)Yes
The Installation Commander is asking questions about military construction, operations and
maintenance, and military family housing projects planned for the installation. Which component of the
Comprehensive Plan would you go to a detail of the physical location of projects that have been
approved or programmed for funding throughout the installation? - (ANSWER)-NOT- Land Use Plan
As the Design Manager preparing the government estimate for a design project. When considering
profit, which if the following in NOT true? - (ANSWER)-NOT- Profit should consider the nature of the
work to be performed
FAR Part 22.406-7 - Compliance Checking requires interviews of laborers to check work classification,
rates of pay, fringe benefits payment, and hours worked. How often is the Government required to
conduct these interviews? - (ANSWER)Agency's policy
All project planning projects include the same five steps. Which of the following shows the five steps in
their logical progression? - (ANSWER)Develop requirements; evaluate assets; analysis, concepts, and
proposals; initiate action; feedback and quality assurance
Which of the following may be required if Government Furnished Equipment (GFE) is not supplied to the
contractor in accordance with the time specified in the contract? - (ANSWER)An adjustment in price or
delivery schedule in the contract
,DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive
Questions and Answers with 100% Correct Answers | Latest Version
The Base Operations Support contractor in performing preventative maintenance on the HVAC in the
headquarters building. At the same time, they are responding to a service call to repair one of the toilets
in the building. This work would be defined as: - (ANSWER)Sustainment
You are the installation Environmental Division Chief. There are residential structures on the installation
where lead-based paint has been used that have been identified for disposal. Which of the following
environmental requirements best describes the procedure(s) that should be followed? - (ANSWER)-NOT-
A report that states the extent of lead-based paint contamination and plans for decontamination must
be submitted
Which of the following is NOT a potential action for disposal of surplus property? - (ANSWER)-NOT-
Public sale
As the Project Manager, why might you NOT prefer to use a design-bid-build methodology for procuring
the design and construction of your project? - (ANSWER)Increased potential for misinterpretations and
possible litigation
&
Lack of input from contractors and subcontractors in the design process
Which of the following is not benefit of the Work Management System? - (ANSWER)Decreased worker
productivity
As the Design Manager you are working with the Contracting Officer to develop the evaluation criteria
for a two-phase design-build solicitation. What would NOT be a first phase evaluation criteria. -
(ANSWER)Cost Proposal
The Contracting Officer needs to direct the contractor to perform changes in the work within the general
scope of the contract. What clause would the Contracting Officer use to unilaterally direct the change? -
(ANSWER)FAR Clause 52.243-4, Changes
The Contracting Officer has issued a Request for Proposal. What will be a requirement for the facility
engineers once proposals have been received. - (ANSWER)Perform independent technical evaluation
, DAU FE 2010 Exam 3 Facility Engineering Life Cycle Support comprehensive
Questions and Answers with 100% Correct Answers | Latest Version
In a design-build contract, the design-build contractor is for all the following except: - (ANSWER)-NOT-
Construction quality
The Contracting Officer would issue a Request for Proposal under FAR Part 15 procedures to prospective
offerors as part of awarding a construction contract to the lowest price responsible contractor. -
(ANSWER)False
Privatization is the transfer of maintenance responsibilities of an infrastructure to a qualified entity. -
(ANSWER)False
The In-House Design Team can contain all but one of the following disciplines: - (ANSWER)Contracting
Officer
As the Project Manager, you only want to consider price and price-related factors when awarding the
contract. Would you recommend the use of an Invitation for Bids? - (ANSWER)Yes
Work Input Control provides a basic planning and work status information from work inception to it
termination or completion. - (ANSWER)True
As a result of the Project Planning Process, you have developed a project to convert an existing facility to
a new functional purpose due to a new tenant coming to your installation. What work classification
would you give to this project? - (ANSWER)Alteration
Using the design-bid-build methodology, the construction contract is awarded on lowest bid by a
responsible contractor, or it may be awarded through a negotiated acquisition on a best value
continuum. - (ANSWER)True
From Block 9, Cost Estimates on the DD Form 1391, you can determine the Estimated Cost of
Construction (costs for primary and supporting facilities); funds for supervision, inspection, and
overhead; contingencies; and installed equipment funded by other appropriations. - (ANSWER)True