Regulations that address & specify minimum clearance distances & also
address proper planning, construction techniques, defensible space,
vegetation control, & land uses; developed by the International Fire
Code Institute: -ANSWERS-Urban-Wildland Interface Code
(UWIC)
Crisis management is an indicator of chronic __________. -ANSWERS-
underfunding
A model for the production of reaction zones -ANSWERS-
Compartmentalization of Decay in Trees
(CODIT)
The potential between live conductors or between live & nuetral
conductors is known as __________-to-__________ potential. -
ANSWERS-phase-to-phase
A method to minimize tree-caused outage by conducting a detailed
analysis of the system, vegetation conditions, outage history,
,infrastructure, etc. & identifying a range of preventable maintenance
that have the potential to provide greater reliability & cost efficiency
than just pruning/removing vegetation -ANSWERS-reliability-centered
management
(RCM)
__________ line clearance applies when an electric hazard exists but
work is not being done for the utility. __________ line clearance applies
to being in proximity to electric hazards on behalf of the utility. -
ANSWERS-incidental;
qualified
The rights that provide the utility the privilege of installing &
maintaining its facilities in public roadways: -ANSWERS-franchise rights
Completing all necessary line clearance on a feeder or circuit basis: -
ANSWERS-circuit work
Disaster Management Cycle: -ANSWERS-
Planning>Response>Recovery/Lessons Learned>Mitigation>process
starts over
What is a phase? -ANSWERS-an energized wire
,The most commonly used Tree growth regulators (TGRs) work by
inhibiting the production of __________. -ANSWERS-gibberellin
An individual who is familiar with the equipment & hazards in line
clearance & has demonstrated the ability to perform the techniques
involved: -ANSWERS-qualified line-clearance arborist
The length of a branch or trunk to be considered when evaluating the
combination of forces that could lead to failure: -ANSWERS-lever arm
Most utilities list __________ __________ as a reason for maintaining
vegetation, but customers often underestimate the risk. -ANSWERS-
public safety
Protective equipment is designed to shield the system from: -
ANSWERS-faults, short circuits, & current surges
A concept in project management that shows the interrelation of the
resources of time, cost, & scope; often depicted by the constraint
triangle: -ANSWERS-triple constraint
__________ transmits laser pulses toward a target, records the time it
takes to return to sensors, & translates the results into a virtual image
of the right-of-way; it stands for: -ANSWERS-LiDAR;
Light Detection and Ranging
, A large area of low atmospheric pressure, characterized by inward-
spiraling winds: -ANSWERS-cyclone
What is the first thing to do when you find a tree or tree part on the
line? -ANSWERS-contact the utility control center
People with an interest or concern in an organization & its decisions are
known as: -ANSWERS-stakeholders
The effect that causes cyclones to rotate clockwise in the Southern
hemisphere & counterclockwise in the Northern hemisphere: -
ANSWERS-Coriolis force
Project management stratification of the entire scope of work need to
accomplish a project's objectives: -ANSWERS-work breakdown
structure
The potential between live conductors & the ground is known as
__________-to-__________ potential. -ANSWERS-phase-to-ground
__________ __________ is the management of vegetation by
establishing & conserving compatible, stable plant communities using
natural competition, animals, insects, or pathogens. -ANSWERS-
biological control