Massachusetts Construction
Supervisor License (CSL) Exam Practice
Questions And Correct Answers
(Verified Answers) Plus Rationale 2027
Q&A| Instant Download Pdf.
1. Which Massachusetts license classification authorizes a construction
supervisor to directly supervise construction, reconstruction,
alteration, repair, removal, or demolition of buildings of any use
group containing less than 35,000 cubic feet of enclosed space?
A. Restricted Construction Supervisor License
B. Masonry-Only Construction Supervisor License
C. Unrestricted Construction Supervisor License
D. Residential Roofing Construction Supervisor License
The Unrestricted Construction Supervisor License provides the broadest
general CSL authority for buildings within the specified size limitation, as
well as one- and two-family dwellings and certain other structures.
2. Under Massachusetts CSL qualification requirements, what
minimum amount of qualifying building construction or design
experience is generally required before taking the examination?
A. One year
B. Two years
,C. Three years
D. Five years
Massachusetts generally requires applicants to document at least three
years of qualifying building construction or design experience for the CSL
examination.
3. Within what period before application must the required CSL
experience generally have been completed?
A. Five years
B. Seven years
C. Ten years
D. Fifteen years
The qualifying experience must generally fall within the ten-year period
preceding the application for the license.
4. A building has 30,000 cubic feet of enclosed space and is not a one-
or two-family dwelling. Which license category is generally
appropriate for direct construction supervision?
A. No CSL can supervise it
B. Restricted CSL only
C. Unrestricted CSL
D. Masonry-Only CSL
An Unrestricted CSL covers buildings of any use group containing less
than 35,000 cubic feet of enclosed space, subject to applicable code
requirements.
, 5. Which building type may generally be supervised by an Unrestricted
CSL regardless of its size?
A. Any commercial building
B. Any industrial building
C. A one- or two-family dwelling and its accessory structures
D. Any building exceeding 35,000 cubic feet
The Unrestricted CSL includes one- and two-family dwellings and their
accessory structures irrespective of size.
6. A proposed retaining wall is 8 feet high, measured from the base of
the footing to its top. Which statement best describes the scope of
an Unrestricted CSL?
A. It cannot supervise retaining walls
B. It may supervise only walls under 4 feet
C. It may supervise a retaining wall less than 10 feet high within the
applicable CSL scope
D. It may supervise retaining walls only when made of masonry
The Unrestricted CSL scope includes retaining walls less than 10 feet in
height when measured from the base of the footing to the top of the
wall.
7. Which Massachusetts body is responsible for the construction
supervisor licensing framework under 780 CMR?
A. Department of Environmental Protection
B. Department of Transportation
, C. Board of Building Regulations and Standards (BBRS)
D. Department of Revenue
The BBRS administers the construction supervisor licensing requirements
established under the Massachusetts building regulations.
8. Which Massachusetts building code edition is associated with the
current CSL examination transition beginning January 1, 2025?
A. Seventh Edition
B. Eighth Edition
C. Ninth Edition
D. Tenth Edition
Massachusetts ended CSL testing based on the Ninth Edition at the end
of 2024 and began testing on the Tenth Edition on January 1, 2025.
9. Which organization administers the Massachusetts CSL examination
under the current examination process?
A. BBRS directly at every municipal building department
B. Massachusetts Department of Revenue
C. PSI
D. OSHA
The current Massachusetts application instructions direct CSL candidates
to register and schedule examinations through PSI.
10. A CSL applicant is 17 years old but otherwise meets the
experience requirements. What is the appropriate conclusion?
Supervisor License (CSL) Exam Practice
Questions And Correct Answers
(Verified Answers) Plus Rationale 2027
Q&A| Instant Download Pdf.
1. Which Massachusetts license classification authorizes a construction
supervisor to directly supervise construction, reconstruction,
alteration, repair, removal, or demolition of buildings of any use
group containing less than 35,000 cubic feet of enclosed space?
A. Restricted Construction Supervisor License
B. Masonry-Only Construction Supervisor License
C. Unrestricted Construction Supervisor License
D. Residential Roofing Construction Supervisor License
The Unrestricted Construction Supervisor License provides the broadest
general CSL authority for buildings within the specified size limitation, as
well as one- and two-family dwellings and certain other structures.
2. Under Massachusetts CSL qualification requirements, what
minimum amount of qualifying building construction or design
experience is generally required before taking the examination?
A. One year
B. Two years
,C. Three years
D. Five years
Massachusetts generally requires applicants to document at least three
years of qualifying building construction or design experience for the CSL
examination.
3. Within what period before application must the required CSL
experience generally have been completed?
A. Five years
B. Seven years
C. Ten years
D. Fifteen years
The qualifying experience must generally fall within the ten-year period
preceding the application for the license.
4. A building has 30,000 cubic feet of enclosed space and is not a one-
or two-family dwelling. Which license category is generally
appropriate for direct construction supervision?
A. No CSL can supervise it
B. Restricted CSL only
C. Unrestricted CSL
D. Masonry-Only CSL
An Unrestricted CSL covers buildings of any use group containing less
than 35,000 cubic feet of enclosed space, subject to applicable code
requirements.
, 5. Which building type may generally be supervised by an Unrestricted
CSL regardless of its size?
A. Any commercial building
B. Any industrial building
C. A one- or two-family dwelling and its accessory structures
D. Any building exceeding 35,000 cubic feet
The Unrestricted CSL includes one- and two-family dwellings and their
accessory structures irrespective of size.
6. A proposed retaining wall is 8 feet high, measured from the base of
the footing to its top. Which statement best describes the scope of
an Unrestricted CSL?
A. It cannot supervise retaining walls
B. It may supervise only walls under 4 feet
C. It may supervise a retaining wall less than 10 feet high within the
applicable CSL scope
D. It may supervise retaining walls only when made of masonry
The Unrestricted CSL scope includes retaining walls less than 10 feet in
height when measured from the base of the footing to the top of the
wall.
7. Which Massachusetts body is responsible for the construction
supervisor licensing framework under 780 CMR?
A. Department of Environmental Protection
B. Department of Transportation
, C. Board of Building Regulations and Standards (BBRS)
D. Department of Revenue
The BBRS administers the construction supervisor licensing requirements
established under the Massachusetts building regulations.
8. Which Massachusetts building code edition is associated with the
current CSL examination transition beginning January 1, 2025?
A. Seventh Edition
B. Eighth Edition
C. Ninth Edition
D. Tenth Edition
Massachusetts ended CSL testing based on the Ninth Edition at the end
of 2024 and began testing on the Tenth Edition on January 1, 2025.
9. Which organization administers the Massachusetts CSL examination
under the current examination process?
A. BBRS directly at every municipal building department
B. Massachusetts Department of Revenue
C. PSI
D. OSHA
The current Massachusetts application instructions direct CSL candidates
to register and schedule examinations through PSI.
10. A CSL applicant is 17 years old but otherwise meets the
experience requirements. What is the appropriate conclusion?