1. required for all piping systems that serve _______ psig 1/2
appliance systems. normally operated at 11 in WC
pressure
2. required for all piping systems that serve 1/2 psig 11
appliance systems. normally operated at ______ in WC
pressure
3. above group LP-gas containers must not be located 6
within ____ feet of the vertical plane beneath overhead 600
electric power lines that are over _____ volts
4. Fire Extinquishers must have minimum capacity of 18
_____ lbs dry chemical with a ___ : ___ rating B:C
5. Cargo Tank Inspection and Tests external visual inspection
V= ____ ____ inspection every __ years 1 year
K= ____ test every ____ years leak test 1 year
P= ____ test every ____ years pressure test 5 years
I= ____ ____ inspection every __ years internal visual inspection 5
years
6. what is the lower limit of combustibility of odorized 1/5
LP-gas
7. A propane leak can Displace Oxygen an caus-
es suffocation
8. Bulk plant emergency shutoff for 4001 gal aggregate opening of 1 1/4 in or
wc or more shall have more
pneumatically operated
, LP – GAS TEXAS BOBTAIL EXAM STUDY EXAM WITH CORRECT ACTUAL QUES
TIONS AND CORRECTLY WELL DEFINED ANSWERS LATEST ALREADY GRADE
A+
Study online at https://quizlet.com/_jso65a
ESV
pneumatically operated
internal valves
back-check valves for into
tank only
9. Thermal element must be located within ____ ft of the 5
ESV and can NOT BE _____ painted
10. All underground pipe, metallic or poly must be cov- 12
ered by ____ inches or ____ inches if damage is likely 18
11. Outdoor metallic piping shall have ___ pressure limits no
12. Polyethylene piping systems shall be limited to ____ 30
psig
13. Polyethylene piping shall be used _______ only underground
14. Texas school leak tests must last a minimum of ____ 30
minutes
15. LPG form ____ must be keep on file for ____ years 30
5
16. Texas school leak tests must be done every ____ years 2
17. The term NQT on cargo tanks means Non-Quenched Tempered
18. Single family home pressure testing must last a mini- 10
mum of ___ minutes
19.
TIONS AND CORRECTLY WELL DEFINED ANSWERS LATEST ALREADY GRADE
A+
Study online at https://quizlet.com/_jso65a
1. required for all piping systems that serve _______ psig 1/2
appliance systems. normally operated at 11 in WC
pressure
2. required for all piping systems that serve 1/2 psig 11
appliance systems. normally operated at ______ in WC
pressure
3. above group LP-gas containers must not be located 6
within ____ feet of the vertical plane beneath overhead 600
electric power lines that are over _____ volts
4. Fire Extinquishers must have minimum capacity of 18
_____ lbs dry chemical with a ___ : ___ rating B:C
5. Cargo Tank Inspection and Tests external visual inspection
V= ____ ____ inspection every __ years 1 year
K= ____ test every ____ years leak test 1 year
P= ____ test every ____ years pressure test 5 years
I= ____ ____ inspection every __ years internal visual inspection 5
years
6. what is the lower limit of combustibility of odorized 1/5
LP-gas
7. A propane leak can Displace Oxygen an caus-
es suffocation
8. Bulk plant emergency shutoff for 4001 gal aggregate opening of 1 1/4 in or
wc or more shall have more
pneumatically operated
, LP – GAS TEXAS BOBTAIL EXAM STUDY EXAM WITH CORRECT ACTUAL QUES
TIONS AND CORRECTLY WELL DEFINED ANSWERS LATEST ALREADY GRADE
A+
Study online at https://quizlet.com/_jso65a
ESV
pneumatically operated
internal valves
back-check valves for into
tank only
9. Thermal element must be located within ____ ft of the 5
ESV and can NOT BE _____ painted
10. All underground pipe, metallic or poly must be cov- 12
ered by ____ inches or ____ inches if damage is likely 18
11. Outdoor metallic piping shall have ___ pressure limits no
12. Polyethylene piping systems shall be limited to ____ 30
psig
13. Polyethylene piping shall be used _______ only underground
14. Texas school leak tests must last a minimum of ____ 30
minutes
15. LPG form ____ must be keep on file for ____ years 30
5
16. Texas school leak tests must be done every ____ years 2
17. The term NQT on cargo tanks means Non-Quenched Tempered
18. Single family home pressure testing must last a mini- 10
mum of ___ minutes
19.