1. In Allen County, which includes Fort Wayne, what is required before
an applicant can register for an electrical trade examination?
A. A completed contractor bond only
B. An approved exam sponsorship application
C. A state electrical contractor registration
D. A completed apprenticeship certificate only
B. An approved exam sponsorship application
Allen County requires applicants to complete and obtain approval of the
appropriate exam sponsorship application before registering for and
taking the examination. The current process includes a trade
examination sponsorship application and sponsorship fee.
2. According to the Allen County Building Department, what is the
standard time limit for its open-book trade examinations?
,A. 2 hours
B. 3 hours
C. 4 hours
D. 6 hours
C. 4 hours
Allen County states that its examinations are open book and have a
four-hour time limit, making efficient code navigation an important
examination skill.
3. Which ICC examination designation corresponds to the National
Standard Master Electrician examination using the 2014 code cycle?
A. F16
B. F17
C. G16
D. T16
A. F16
The Allen County trade examination application identifies F16 as the ICC
National Standard Master Electrician examination based on the 2014
code cycle.
4. Which ICC examination designation corresponds to the National
Standard Master Electrician examination based on the 2020 code
cycle?
A. F17
B. G16
,C. T16
D. T17
C. T16
The Allen County examination application identifies T16 as the National
Standard Master Electrician examination using the 2020 code cycle.
5. Which ICC examination designation corresponds to the National
Standard Journeyman Electrician examination based on the 2020
code cycle?
A. F17
B. G17
C. T17
D. T16
C. T17
T17 is identified in the Allen County electrical examination application as
the National Standard Journeyman Electrician examination based on the
2020 code cycle.
6. Which reference material is particularly important when preparing
for an electrical contractor examination involving the National
Electrical Code?
A. International Plumbing Code
B. National Electrical Code
C. International Property Maintenance Code
D. International Fuel Gas Code
, B. National Electrical Code
Electrical examinations test knowledge of electrical installation
requirements, and the National Electrical Code is the principal technical
reference governing electrical installations.
7. A 120-volt branch circuit supplies several general-purpose
receptacles in a dwelling. Which conductor size is generally
associated with a 20-ampere branch circuit when copper
conductors are used?
A. 18 AWG
B. 16 AWG
C. 14 AWG
D. 12 AWG
D. 12 AWG
A standard 20-ampere branch circuit using copper conductors generally
requires conductors with an ampacity of at least 20 amperes, commonly
accomplished with 12 AWG copper under ordinary conditions.
8. What is the primary purpose of an overcurrent protective device in
a branch circuit?
A. To increase available fault current
B. To protect conductors from excessive current
C. To eliminate the grounding conductor
D. To increase the circuit voltage
B. To protect conductors from excessive current
Practice Questions And Correct
Answers (Verified Answers) Plus
Rationale 2027 Q&A| Instant
Download Pdf.
1. In Allen County, which includes Fort Wayne, what is required before
an applicant can register for an electrical trade examination?
A. A completed contractor bond only
B. An approved exam sponsorship application
C. A state electrical contractor registration
D. A completed apprenticeship certificate only
B. An approved exam sponsorship application
Allen County requires applicants to complete and obtain approval of the
appropriate exam sponsorship application before registering for and
taking the examination. The current process includes a trade
examination sponsorship application and sponsorship fee.
2. According to the Allen County Building Department, what is the
standard time limit for its open-book trade examinations?
,A. 2 hours
B. 3 hours
C. 4 hours
D. 6 hours
C. 4 hours
Allen County states that its examinations are open book and have a
four-hour time limit, making efficient code navigation an important
examination skill.
3. Which ICC examination designation corresponds to the National
Standard Master Electrician examination using the 2014 code cycle?
A. F16
B. F17
C. G16
D. T16
A. F16
The Allen County trade examination application identifies F16 as the ICC
National Standard Master Electrician examination based on the 2014
code cycle.
4. Which ICC examination designation corresponds to the National
Standard Master Electrician examination based on the 2020 code
cycle?
A. F17
B. G16
,C. T16
D. T17
C. T16
The Allen County examination application identifies T16 as the National
Standard Master Electrician examination using the 2020 code cycle.
5. Which ICC examination designation corresponds to the National
Standard Journeyman Electrician examination based on the 2020
code cycle?
A. F17
B. G17
C. T17
D. T16
C. T17
T17 is identified in the Allen County electrical examination application as
the National Standard Journeyman Electrician examination based on the
2020 code cycle.
6. Which reference material is particularly important when preparing
for an electrical contractor examination involving the National
Electrical Code?
A. International Plumbing Code
B. National Electrical Code
C. International Property Maintenance Code
D. International Fuel Gas Code
, B. National Electrical Code
Electrical examinations test knowledge of electrical installation
requirements, and the National Electrical Code is the principal technical
reference governing electrical installations.
7. A 120-volt branch circuit supplies several general-purpose
receptacles in a dwelling. Which conductor size is generally
associated with a 20-ampere branch circuit when copper
conductors are used?
A. 18 AWG
B. 16 AWG
C. 14 AWG
D. 12 AWG
D. 12 AWG
A standard 20-ampere branch circuit using copper conductors generally
requires conductors with an ampacity of at least 20 amperes, commonly
accomplished with 12 AWG copper under ordinary conditions.
8. What is the primary purpose of an overcurrent protective device in
a branch circuit?
A. To increase available fault current
B. To protect conductors from excessive current
C. To eliminate the grounding conductor
D. To increase the circuit voltage
B. To protect conductors from excessive current