Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 47 pages
Exam (elaborations)

CSLB General Contractor B License Exam 2026–2027 | California General Building Contractor Practice Questions & Exam Prep

Document preview thumbnail
Preview 4 out of 47 pages

CSLB General Contractor B License is a focused study resource for candidates preparing for the California General Building Contractor licensing examination administered by the Contractors State License Board (CSLB). The material is designed to support review of general building contractor concepts, trade knowledge, construction practices, regulations, and exam-focused topics relevant to the B license. Ideal for California contractor license candidates preparing for the CSLB exam, this guide supports targeted study, practice, and overall exam readiness.

Content preview

CSLB General contractor B license Exam
What is the height requirement for safety glazing above a bottom of glass 60 inches or less
standing/walking surface(floor)?




What is the distance from a door that requires safety 24" inch arc from door
glazing?




What is the minimum size of a pane that requires safety Greater than 9' square feet
glazing?




Safety glazing is required if the bottom edge of the 18"inches
glazing is less than _______ inches from the floor




Safety glazing is required If the top edge of glazing is 36" inches
greater than ______ inches above the floor?




What is the horizontal distance within which safety 36" inches
glazing is required from a walking surface?




What structures require safety glazing when enclosing a Railings or walls
stairway landing?



Alterations/ repairs that exceed $1000 require smoke alarms must be installed




Stormwater discharge- if more than 5 acres National pollutant discharge elimination system NPDES




When you Disturb less than 1 acre contractor has to manage storm water drainage during construction




Dead Load is The weight of the building or building components.

, CSLB General contractor B license Exam
Live Load is MOVABLE LOADS such as people, furniture and the like.




Snow Loads are 70 pounds per sqft.




Two family dwellings shall have 1 hour fire resistance rated wall and ceilings between each unit




Ducts that pass through garage, walls and ceilings that # 26 gage
separate the dwellings use minimum ______ gage



Accessible storage under stairs requires 1/2 inch drywall




Fireblocking materials consist of 2" lumber
2- 1" lumber
23/32 panel joints backed
3/4 particle boardl joints backed
1/2" drywall
1/4" cement board
Batts of mineral wool or glass fiber insulation
cellulose insulation


Fire blocking is required Vertically @ ceilings and floors
Horizontally @ interval not exceeding 10'
soffits
drop and cove ceilings
stair stringers at the top & bottom
vents, pipes, ducts, cables & wires @ ceiling & floor levels
chimneys & fireplaces
cornices of two family dwellings


Draft stopping materials are 1/2" drywall
3/8" wood structural



Draftstopping in concealed space of floor/ceiling 1,000 sqft.
assembly shall be installed so that the area does not
exceed


Combustable Insulation shall be minimum ______from 3"
recess lights/ fan motors
other heat producing devices


2x4 joists/ rafters/ beams & posts, studs greater than 8' #2 grade Doug fir or better
feet shall be of what grade wood



5" & thicker posts & beams shall be of what grade wood #1 grade Doug fir or better




Minimum compressive strength of concrete is 3000 psi (28 days)




Concrete shall consist of 1 part cement, 3 parts sand, 4 parts 1" gravel
max 7.5 gallons of water per sack of cement

, CSLB General contractor B license Exam
Mortar for masonry foundation walls consists of 1 part Portland cement
3 parts sand
1/4-1/2 part hydrated lime


Grout shall consist of 1 part Portland cement
1/10 hydrated lime
2-3 parts sand
1-2 parts gravel


Grout shall maintain a minimum compressive strength 2,00 PSI (28 days)




Fastners for treated wood shall be zinc dipped galvanized, stainless, copper




Metal Flashing has thickness of No. 26 (0.01875) galvanized metal




Crickets & Saddles shall be installed ridge side of any 30" inches
chimney or penetration more than _____ inches
perpendicular to the slope of the roof, made of sheet
metal or same material as roof covering




Water-Resistive Barrier shall be minimum of 1 layer o #15 asphalt felt
horizontal lap by 2"
vertical joints lap by 6" + stagger


Where should wall flashing be applied at At the roof intersection of chimneys, masonry construction, built-in gutter, walls.




Where should wall flashing be applied on masonry, wood Under & at the ends of masonry, wood or metal coping and sills.
or metal coping?




How should wall flashing be applied above projecting Continuously, above all projecting wood trim.
wood trim?




Where should wall flashing be applied to exterior porches, decks, or stairs are attached to a wall or floor assembly of a
wood frame structure.

, CSLB General contractor B license Exam
Damp-proofing Shall extend from the top of the footing to the finish grade of any enclosed usable space below
grade



What is the minimum gauge for weep screed? 26 gauge




What is the required vertical flange length for weep 3-1/2 inches
screed?



How far above the bare earth should weep screed be A minimum of 4 inches
placed?



How far above paved areas should weep screed be A minimum of 2 inches
placed?



Construction waste, reduction, disposal, and recycling 70%
minimum reuse is



What should be identified in a construction waste The construction and demolition waste materials to be diverted.
management plan?



How should construction and demolition waste Specify if they will be sorted on site or bulk mixed.
materials be sorted according to the plan?



What facilities should be identified in a construction Diversion facilities.
waste management plan?



What construction methods should be identified to Methods to reduce waste generated.
manage waste?



How should the amount of diverted construction waste Calculated by weight or volume, not both.
materials be calculated?



Moisture Content of building materials shall not exceed 19% moisture contact
Using a probe or contact moisture meter



Where should moisture readings be taken? 2 feet to 4 feet from grade stamped end of each piece to be verified




How many random moisture readings should be At least 3 random moisture readings
performed?



What methods should be used to size and design Heat loss and gain
heating and air conditioning systems?



According to which standard are duct systems sized? ANSI

Document information

Uploaded on
September 1, 2026
Number of pages
47
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
ExamBooster111
5.0
(3)
Sold
3
Followers
1
Items
886
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions