• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 30 pages
Exam (elaborations)

LEED GA Exam 2026/2027 | LEED Green Associate v5 Practice Questions & Verified Answers

Document preview thumbnail
Preview 3 out of 30 pages

LEED GA Exam 2026/2027 | LEED Green Associate v5 Practice Questions & Verified Answers

Content preview

LEED GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))




LEED GA EXAM
What is the first Level of LEED Certification called?

a. Copper
b. Certified
c. Gold
d. Silver
e. Platinum - ANS-Certified

What credit requires FTE for calculations? (Select 2)

a. Outdoor Water Use Reduction
b. Environmental Tobacco Smoke Control
c. Bicycle Facilities
d. Indoor Water Use Reduction
e. Green Power and Carbon Offsets - ANS-Bicycle Facilities
Indoor Water Use Reduction

A building owner has read an article on the benefits of daylighting on productivity and,
as a result, has asked the design team for his new building to evaluate increasing the
current amount of glass. Which one of the following is NOT a relevant consideration to
determine if this is feasible?

a. The impact of heat island effect
b. The impact on lighting system light pollution
c. The impact on occupant thermal comfort
d. The impact on building efficiency - ANS-The impact of heat island effect

A rapidly renewable material is defined as one that:

a. Is naturally grown material that does not require chemical fertilizers to speed the
growth cycle
b. Can be recycled with a minimum amount of Energy
c. Has a growth cycle of 10 years or less
d. Has a very low life cycle assessment - ANS-Has a growth cycle of 10 years or less

The density radius is used in the calculation of which credit?




LEED GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))

,LEED GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))




a. Light pollution reduction
b. Surrounding density and diverse uses
c. Sensitive land protection
d. Site development- protect or restore habitats - ANS-Surrounding density and diverse
uses

Which of the following is the same as a project's site area for a single building project?

a. Property size
b. Nonconstructed areas
c. Development footprint
d. Building footprint - ANS-Property size

Environmental Tobacco Smoke Control is concerned mainly with which one of the
following?

a. Preventing tobacco smoke from contaminating the air in occupied spaces
b. Providing the minimum rate of ventilation required to sufficiently dilute smoke from
tobacco
c. Preventing tobacco smoke from contributing to the contamination of natural
environments
d. Providing smoking rooms so that smokers will have a place to smoke freely -
ANS-Preventing tobacco smoke from contaminating the air in occupied spaces

Which strategy will contribute to earning points for both Optimize Energy Performance
and On-site Renewable Energy?

a. Solar thermal system
b. Ground source heat pump
c. Purchase green tags
d. Daylight harvesting system - ANS-Solar thermal system

A project team's local jurisdiction enforces an erosion and sedimentation control
requirement that is more stringent that the EPA Construction General Permit. What
should the project team do?

a. Comply with the EPA Construction General Permit
b. Request a variance from the local jurisdiction to be allowed to follow the EPA
Construction General Permit




LEED GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))

, LEED GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))




c. Comply with the local requirements and include submittals verifying that the
requirements are more stringent
d. Submit an appeal describing the local requirements to GBCI
Submit a CIR describing the local requirements to GBCI - ANS-Comply with the local
requirements and include submittals verifying that the requirements are more stringent

What is likely a benefit for a project that will be located in an urban area near a
residential neighborhood?

a. Opportunity to redevelop a brownfield
b. Lower levels of light pollution
c. Reduced stormwater runoff
d. Access to public transportation - ANS-Access to public transportation

What is the intent behind the purchase of Green Power?

a. Reduce electrical consumption
b. Emissions reductions
c. Earn a point on a LEED credit
d. Reduce the cost of electricity - ANS-Emissions reductions

A water efficient strategy to reduce potable water demand for the interior of a building
would include (Select 3)

a. Installing aerators into lavatory faucet
b. Installing drip irrigation
c. Installing a green roof
d. Using graywater for flush fixtures
e. Implementing low-flow toilets - ANS-Installing aerators into lavatory faucet
Using graywater for flush fixture, Implementing low-flow toilets

Bio-based materials, FSC certified wood, materials reuse, and recycled content are all
referenced under which MR credit option?

a. Leadership Extraction Practices
b. Product Manufacturer Supply Chain Optimization
c. Environmental product declaration
d. Material Ingredient Optimization - ANS-Leadership Extraction Practices

What would most likely be considered a supply of potable water?




LEED GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA
LEED
EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
GA EXAM.pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))

Document information

Uploaded on
September 1, 2026
Number of pages
30
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
geniusbuddy
1.0
(1)
Sold
969
Followers
0
Items
155
Last sold
4 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions