LEED GA
LEED
Exam
GA
LEED
(3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
Exam
GA (3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
Exam (3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
LEED GA Exam
If a school is to be constructed, what is the minimum project size requirement for it to be
LEED certified? - ANS-1,000 square feet*
What is the intent of the integrative process credit? - ANS-To encourage teamwork and
cooperation among the project team pursing LEED
The __________ is the projected water use of a building assuming it has met
code-compliant fixtures and fittings. This however does not include the projection for
additional savings comparison with the actual meter data. - ANS-Baseline water
consumption*
When constructing bicycle networks, what is the minimum distance or width allowed for
a two-way bicycle path or trail? - ANS-8 ft
This term is used for the materials used in flooring, casework, wall coverings which
could be permanent or semi-permanent. - ANS-Base building
What is the maximum space allowed between two points when conducting
ASE1000,250 reporting? - ANS-2 ft ("ASE1000,250 reports the percentage of sensors
in the analysis area, using a maximum 2-foot spacing between points, that are found to
be exposed to more than 1000 lux of direct sunlight for more than 250 hours per year,
before any operable blinds or shades are deployed to block sunlight, considering the
same 10 hour/day analysis period as sDA and using comparable simulation methods"
via USGBC)
This results in the absorption of heat by man-made features like non-reflective
pavement and buildings - ANS-Heat Island Effect
Which of the following is NOT a task of the LEED Project Administrator? - ANS-A PA
can decide which projects are to be submitted for GBCI review
This term is used to refer to the extraction of usable heat, energy, and electricity from
nonrecyclable waste materials - ANS-Waste-to-Energy
What document is issued upon construction completion that a building has been built in
accordance with local building and construction codes? - ANS-Certificate of Occupancy
LEED GA
LEED
Exam
GA
LEED
(3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
Exam
GA (3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
Exam (3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
LEED
Exam
GA
LEED
(3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
Exam
GA (3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
Exam (3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
LEED GA Exam
If a school is to be constructed, what is the minimum project size requirement for it to be
LEED certified? - ANS-1,000 square feet*
What is the intent of the integrative process credit? - ANS-To encourage teamwork and
cooperation among the project team pursing LEED
The __________ is the projected water use of a building assuming it has met
code-compliant fixtures and fittings. This however does not include the projection for
additional savings comparison with the actual meter data. - ANS-Baseline water
consumption*
When constructing bicycle networks, what is the minimum distance or width allowed for
a two-way bicycle path or trail? - ANS-8 ft
This term is used for the materials used in flooring, casework, wall coverings which
could be permanent or semi-permanent. - ANS-Base building
What is the maximum space allowed between two points when conducting
ASE1000,250 reporting? - ANS-2 ft ("ASE1000,250 reports the percentage of sensors
in the analysis area, using a maximum 2-foot spacing between points, that are found to
be exposed to more than 1000 lux of direct sunlight for more than 250 hours per year,
before any operable blinds or shades are deployed to block sunlight, considering the
same 10 hour/day analysis period as sDA and using comparable simulation methods"
via USGBC)
This results in the absorption of heat by man-made features like non-reflective
pavement and buildings - ANS-Heat Island Effect
Which of the following is NOT a task of the LEED Project Administrator? - ANS-A PA
can decide which projects are to be submitted for GBCI review
This term is used to refer to the extraction of usable heat, energy, and electricity from
nonrecyclable waste materials - ANS-Waste-to-Energy
What document is issued upon construction completion that a building has been built in
accordance with local building and construction codes? - ANS-Certificate of Occupancy
LEED GA
LEED
Exam
GA
LEED
(3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
Exam
GA (3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))
Exam (3).pdf~~~~~~~~~~~~~~~~~~~~~~~~~!!!!!!!!!!!!!!!!!!!!@(&*#########################(@)@)@~~~~~~~~~~~~)))))))))))))))