EVITP Exam Questions and Answers
Verified Solutions Latest Update
Question:
True or False. The maximum amount of current a conductor can carry under the
conditions of use without exceeding its temperature rating is found using the
calculations methods based in Article 310..
Answer:
True
Question:
Before commissioning and startup, a completed EVSE installation should be evaluated
for which of the following?
Question:
Correct OCPD and wire size
Question:
If a new electrical service is required
Question:
Properly torqued electrical connections
Question:
D. A. and C..
Answer:
D. A. and C.
Question:
Utilities may require a separate meter for EVSE_
Question:
Billing rates and plans
,Question:
Oversight
Question:
Treatment
Question:
All of the above.
Answer:
Billing rates and plans
Question:
EV networks generate revenue with which of the following?
Question:
Call-to-pay
Question:
Membership fees
Question:
Station usage fees
Question:
All of the above.
Answer:
All of the above
Question:
What types of commercial/industrial vehicles are currently available in an electrified
version?
Question:
Cargo and material handling equipment
, Question:
Delivery vans and busses
Question:
Semi-trailer trucks
Question:
All of the above.
Answer:
All of the above
Question:
The state of charge of an EV battery is which of the following?
Question:
A determining factor in calculating the time necessary to fully charge an EV
Question:
Dependent on how many miles the vehicle has been driven in its lifetime
Question:
Is an indicator of battery age
Question:
Low when an EV is fully charged.
Answer:
Dependent on how many miles the vehicle has been driven in its lifetime
Question:
EV charging equipment can be activated by which of the following?
Question:
RFID tags
Verified Solutions Latest Update
Question:
True or False. The maximum amount of current a conductor can carry under the
conditions of use without exceeding its temperature rating is found using the
calculations methods based in Article 310..
Answer:
True
Question:
Before commissioning and startup, a completed EVSE installation should be evaluated
for which of the following?
Question:
Correct OCPD and wire size
Question:
If a new electrical service is required
Question:
Properly torqued electrical connections
Question:
D. A. and C..
Answer:
D. A. and C.
Question:
Utilities may require a separate meter for EVSE_
Question:
Billing rates and plans
,Question:
Oversight
Question:
Treatment
Question:
All of the above.
Answer:
Billing rates and plans
Question:
EV networks generate revenue with which of the following?
Question:
Call-to-pay
Question:
Membership fees
Question:
Station usage fees
Question:
All of the above.
Answer:
All of the above
Question:
What types of commercial/industrial vehicles are currently available in an electrified
version?
Question:
Cargo and material handling equipment
, Question:
Delivery vans and busses
Question:
Semi-trailer trucks
Question:
All of the above.
Answer:
All of the above
Question:
The state of charge of an EV battery is which of the following?
Question:
A determining factor in calculating the time necessary to fully charge an EV
Question:
Dependent on how many miles the vehicle has been driven in its lifetime
Question:
Is an indicator of battery age
Question:
Low when an EV is fully charged.
Answer:
Dependent on how many miles the vehicle has been driven in its lifetime
Question:
EV charging equipment can be activated by which of the following?
Question:
RFID tags